Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 42978 +
- 05000260/LER-2001-003 +
- ML112101662 +
- ML111940492 +
- ML20012C529 +
- 05000311/LER-1982-082, Forwards LER 82-082/03L-0.Detailed Event Analysis Encl +
- ML041240053 +
- ML20078P055 +
- ML20077N151 +
- ML20073E718 +
- 05000498/LER-1992-007, Errata to LER 92-007-00:on 920710,correcting Typo on Page 3 of 920807 Initial Submittal,Revising Cause of Vent to Cause of Event +
- 05000395/LER-1985-015, Notifies That Util Agrees W/Alleged Violation 01 in Insp Rept 50-395/85-28.Corrective Actions Documented in Encl LER 85-015,Rev 1.Supervisors Counseled Re Equipment Operability. Util in Full Compliance W/Corrective Action +
- ML20126E722 +
- ML20069A274 +
- ML20153C643 +
- ML20151R544 +
- ML20213H077 +
- ML20244C993 +
- ML20236W119 +
- ML20215G864 +
- IR 05000254/1986009 +
- IR 05000293/1986006 +
- ML20210T778 +
- ML20210F148 +
- ML20114E200 +
- RC-95-0057, Annual Operating Rept for 1994 for VC Summer Nuclear Station Unit 1 +
- 05000395/LER-1989-006, :on 890401 & 0330,turbine Trip Occurred Due to High Moisture Separator Reheater Level.Caused by Various Secondary Equipment Malfunctions.Reactor Trip & Trip Recovery Procedures Implemented +
- 05000461/LER-1989-029, :on 890714,manual Scram Initiated in Anticipation of Automatic Scram Due to Decrease in Main Condenser Vacuum.Caused by Mechanical Failure in Rubber Expansion Joint.Joint Replaced +
- 05000354/LER-1987-031, :on 870714 & 27,filtration,recirculation & Ventilation Sys Auto Initiations Occurred.Caused by Procedural Deficiency.Procedures Revised & Reviewed W/ Appropriate Staff +
- 05000155/LER-1987-013-01, :on 871122,two CRDs Had Withdraw Times Exceeding Tech Spec 5.2.2a(iv) Limit.Caused by Greater Differential Pressure Across Drive Piston.All CRDs Retimed & Reset +
- 05000412/LER-1987-023, :on 870928,reactor Trip Occurred.Caused by Failure of Main Feedwater Regulating Valve B Due to Faulty Controller Card.Card Replaced +
- 05000249/LER-1986-006-08, :on 860529,Group II & III Primary Containment Isolation Occurred While Work Performed on Analog Trip Sys. Caused by Personnel Inadvertently Grounding Live Wire. Personnel Reminded to Pay Attention to Details +
- 05000293/LER-1986-003, :on 860211,480 Volt safety-related Bus B-20 Inadvertently Deenergized During Electrical Maint on nonsafety-related Cable.Caused by Mgt Deficiency.Cable Repaired.Temporary Mod Procedure Implemented +
- 05000254/LER-1986-007-01, :on 860203 & 13,phase a Differential Current Relay on Bus 13-1 Tripped & Actuated Lockout Relay.Probably Caused by Spurious Actuation Due to Vibration.Mod Initiated to Replace Relays W/Relays Less Sensitive +
- 05000413/LER-1985-030, :on 850509,nuclear Svc Water Sys Automatically Aligned to Standby Nuclear Svc Water Pond & All Idle Sys Pumps Started Due to False lo-lo Level Signal in Sys Pumphouse Pit B.Caused by Loss of Voltage +
- 05000272/LER-1992-003, :on 920117,control Room Ventilation Automatically Switched from Normal to Accident Mode of Operation.Caused by Equipment Failure.Damaged Detector Cable Shield Wire Repaired +
- 05000269/LER-1994-005-03, :on 941005,containment Isolation Valve 1RC-7 Rendered Technically Inoperable Due to Change Mgt.Valves 1RC-5 & 6 Closed & Electrically Deactivated & Mechanical Maint Team Involved Counseled +
- 05000413/LER-1993-006, :on 930612,Unit 1 Reactor Trip Occurred.Caused by Blown Fuse in Range Channel.Control Room Operators Manually Throttled CA Flow to Control Nc Cooldown +
- 05000413/LER-1993-006-02, :on 930612,automatic Reactor Trip Initiated by intermediate-range Channel N35 Hi Flux Reactor Trip Bistable.Caused by Blown Fuse in Channel.Entire Drawer Replaced & Channel Placed Back in Svc +
- 05000346/LER-1982-005-03, /03L-0:on 820126,RE 2007,containment Area Radiation Control Monitor to Safety Features Actuation Sys Channel 4 Failed Low.Exact Cause Unknown.New Detector Placed in Svc.Failed Detector Returned to Vendor +
- IR 05000266/1990006 +
- ML20057A344 +
- 05000346/LER-1978-083-03, /03L-1 on 780720:containment vessel-to-annulus Differential Pressure Exceeded Tech Spec Limit by 1 Inch. Purge of Containment Bldg Commenced.Caused by Inadequate Monitoring of Pressure Increase by Shift Check +
- 05000280/LER-1995-009, :on 950929,4,160 Volt Station Svc Bus Breaker 15C1 Opened,Resulting in Loss of 4,160 Volt Transfer Bus & Start of EDGs Due to Personnel Error.Breaker 15C1 re-closed & Personnel Involved Counseled +
- 05000397/LER-1993-006, :on 930206,manual Reactor Scram Initiated Due to Reactor Recirculation Pump Trip While Operating in Area of Increased Awareness.Caused by Component Design Not within Parameter Limits.Procedures Changed +
- 05000254/LER-2006-001, Failure of the Unit B Core Spray Pump Breaker to Operate Due to Racking Deficiency +
- 05000265/LER-2001-001-01, Re Reactor Scram Due to Failure of Main Power Transformer +