Text
_.
t:
OPERATl!1G DATA REPORT DOCKET NO. 050-0331' DATE 02-15-87 COMPLETED BY Bradford N. Thomas TELEPHONE 319-851-7309 a
OPERATING STATUS Notes
- 1. Unit Name Duane Arnold Energy Center
- 2. Reporting Period January, 1987
- 3. Licensed Thermal Power (MWt):
1658
- 4. Nameplate Rating (&oss MWe):
565 (Turbine)
- 5. Design Electrical Rating (Net MWe):
538-
- 6. Maximum Dependable Capacity (&oss MWe:
545
- 7. Maximum Depen &ble Capacity (Net MWe):
515
- 8. If Changes Occur In Capacity Ratings (items Number 3 through 7) Since the Last Report, Give Reasons:-
- 9. Power Level to Which Restricted, if Any (Net MWe):
- 10. Reasons For Restrictions, if Any:
This Month Yr-to-Date Cumu lat Ive
- 11. Hours in Reporting Period 744 744 105192
- 12. Number of Hours Reactor was Critical 744 744 75414.3
- 13. Reactor Reserve Shutcbwn Hours 0
0 192.8
- 14. Hours Generator On-Line 744 744 73484.6
- 13. Unit Reserve Shut <bwn Hours 0~
0 0
- 16. Gross Tt.ermal Erargy Generated (MWH) 1325515 10M 516 931057C0.4.
- 17. O oss Electrics! Energy Generated (MWH) 354334 354334 3121'2419.0
- 18. Net Electrical Energv Generated (MWH) 332341 3M3 41 19237141.1 10 Unit Service Factor 1('O 100
, 69. 9,
- 20. Unit Avollability Factor f00 100 69.9 2f. Unit Capacity F1cto- (Using HDC Net) 86.7 86,7 54.0
- 22. Unit Capaelty Factor (Using DER Net) 83.0 83s0 51.7
- 23. Unti Forced Outage Rate 0
0 14.8
- 24. Shut &wns SchedJled Over Next 6 Months (Type, Date, and Duration of Each):
Ref uel Outage scheduled for Mid-March, 1%7
- 25. If Shut Down At End of Report Period, Estimated Date Of Startup:
N/A 8702180305 870131 (9/77)
PDR ADOCK 05000331 f600 R
'ff L:
i AVERAE DAILY LNIT FOWER LEVEL DOCKET NO. 050-0331 UNIT Duane Arnoid Eneray Center DATE 02-15-87 COMPLETED BY Bradford N. Thomes TELEPHONE 319-851-7309 MONTH January, 1987 DAY AVERAE DAILY POWER LEVEL DAY AVERAE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 475 17 447 2
'474 18 445 3
472 19 443-4 468 20 442 5
465 21 440 6
462 22 440 7
463 23 439 8
461 24 438' 9
-378 25 4 36 10 472 26 435 11 457 27 432 12 454 28 431 13 452 29 425 14 449 30 426 15 452 31 426 16 451 INSTRUCTIONS On this format, list the average elly unit power level in MWe-Net for each ey in the reporting nonth. Compute tha nearest whole megawatt.
(9/77)
P a
.o
?
l s
,w~
--w y,
-p,-
r-e u
on y
m---
4
-r y
.m_
m
..m. _. _. _ _.
i t
e N
M m z
w o
w a
w M m no 2,
eO ae C &
o e
e 4
a e
N zQmmQ O ID > 2-yYPg l t
t 0 0 e e e e e e o>ozaxme l-
- o. 3 au e o e.a e a
- F G 3 eD * - E/ o O i== :. C C 3
-3
- t o3 o.- e 4 13 a
-, e - e a 4 -
o, 4 i
-a e
- - e mo4 o, o Duration a o 3 x a, a 4
= o e
-t w n
l 4,
e m 1
Ulours) e
-.o
-o a
e I
z
-m<
-e o,. -
4 s - eaw M
_,i
...-4,a o
=
,4 z
e i
e-ee m
z n.
e i
e Reason 2 o
w I
a 4 a m :
m
.m o
x r-o x
-4 o
3
-3 13 3
n E
z
-o e
e o
u 3
o e
a Me th od of z.
l Shutting E
Z Down Reactor 3 I
i e
o a
p 3
m 3
M E
e 4
)
2 a
r-m o
e o
a wmn e
o< e o
8 w
,e =
l 4,.
e
, e o
u s
e z-M
& W N =I e a e e e o > x x -+
c-e e r
=4
==o Sy s tem
,e l
Coded oc c a eoe=
e--
a 4 1
m-m x nn 3
i l
Component n
ue
-e nn o
- i Codes e - eoo
-e w s e a
e-an
- e.
-w e-4e w e y aoa u
e o
eoz
= cr 4 eo m
omm*m eceee
- m. e.+, x
-< ao x
a w e o o o y
3 N
E w
8
. 3,
. 5 e
-,o er e
o.
i a a
=
-.4 2 M e4 O
9
- g e o eF=
=
W o, W
y 3 e_e O C
==
> w I
oe
,.8 1
a
=
m
-, 4 e-e w
=
87.
4 W 4 3 W E o
g) o
==
o a.*
o4 e
a i
r
,o a
-s m
c y
m a
O 2
oo o
3 c
- r*4 a
e, i
o o
M n ao e
n e e. W o
a 3.e n
==eeo e
a e a
2' 4
C e,
2 e
m-r Q
s
. ~ - _
.Dackot No. 050-0331 Unit Dueno Arr si d Ercroy Cnster i
.Dato 02-15-87 MAJCR/ SAFETY RELATED MAINTENANCE
. Comp leted By Bra df or d N.
Thomas-Telephone 319-851-7309
.DATE SYSTEM COMPONENT DESCRIPTION (1-8-87 Uninterruptible AC Con rol Power Frequency Control Drive Motor Replace d f aulty Tack Motor 1-12-87 Fire Protection Diesel Fire Pump Engine
'T i ghtene d loose bushings on thermostat wh i ch'-
was causing engine coolant leakage.
L1-13-87 Fire Protection Electric Fire Pump Supply Breaker Cleaned an d Lubricated a Sticking. Breaker
. Linkage 1-13-87 Primary Containment Torus Water Level Recor der Repa ire d recor der 8 s de f ect i ve s l i dew i re mechanism l-15-87 Low Pressure Core Spray (LPCS)
LPCS Torus Suction Valve
. Replaced motor bearings in valve's motor operator 1-16-87 Stan dby Gas - Treatment System
' B ' - S B GT Flow Controller Rep lace d auto ' f low ' contro l l i ng sw itch
( SB GT )
1-19-87
'Stan dby Diese l. Generators..
'A' D i es e l -Gener a tor Repa l're d a damaged oil booster air line
)
4 P
O
.I e =
~
v
-f. :
. DOCKET NO. 050-0331 UNIT Drano Aranid Enaray Center-DATE 02-15 COMPLETED BY Bra df or d N.
Thomas T EL EPHON E ' 319-851-7309 REFUELING INFORMATION 1.
Name.of facility.
A.
Duane Arnol d Energy Center.
~
2.-
Sch e du l e d date for next ref ueling shut down.
A.
March, 1987 3
Sche du l e d date for restart following refueling.
A.
May, 1987 4
Will refueling or resumption of operation thereafter require a technical specification change or.other license. amendment?
Yes A.
Reload license submittal B.
A ddi tiona l MAPLH GP. curves for new f uel bun dies being I n tro duce d for Cycle 9 5
Sche du l ed date(s) for submitting proposed licensing action and supporting information.
A.
Submitted B.
Submitted 6
Important licensing consi derations associated with refueling, e.g.,
new or di f f erent fuel des i gn or supplier, unreviewed design or performance ana lys is metho ds, significant changes In fuel design, new operating proc e du r e s.
None 7
Tha r. umber of fuel assemblies (a) in +5e core and (b) In the spent fuel storage pool.
A.
a) 368 b) 696 8
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is p l an ne d, in number of fuel assemblies.
A.
2050 9
The projected date of the last refueling that can be discharged to - ths spent fuel pool assuming the present license d capacity.
A.
1998 t
r T
k DOCKET NO. 050-0331 UNIT Durno Arneld En'rgy Conter DATE 02-15-87 COMPLETED BY Bra df or d N.
Thomas TELEPHONE 319-851-7309 NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE 1-1-87 At the beginnIng of the year / month the Duane Arnol d Energy Center (DAEC) l l
was operating at approximately 88% of rate d power.wlth 475 (MWe-Net) beIng provi ded to the g r l d.
1-5-87 At 0740 hours0.00856 days <br />0.206 hours <br />0.00122 weeks <br />2.8157e-4 months <br /> a 30 day Limiting Con dition for Operation (LCO) was entered when a reactor water con ductivity element transmitter was removed from service for work on a leaking sample rock.
A collector tank fitting was tightened and the transmitter was returne d to service.
The LCO was exited at 1937 hours0.0224 days <br />0.538 hours <br />0.0032 weeks <br />7.370285e-4 months <br /> on 1-8-87 At 1055 hours0.0122 days <br />0.293 hours <br />0.00174 weeks <br />4.014275e-4 months <br /> a 7 day LCO was entered when the Electric Fire Pump (IP-048) was removed from service for repairs to a sticking supply breaker.
The breaker was cleaned and l u br i ca te d.
The pump was returned to service at 1014 hours0.0117 days <br />0.282 hours <br />0.00168 weeks <br />3.85827e-4 months <br /> on 1-6-87 thus exiting the LCO.
At 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br /> a 14 day LCO was entered when the
'A' Diesel Generator preaction sprinkler system f ailed to operate dur i ng surve i l lance testing.
A defective diaphragm bypass valve was replaced, the system returned to service, en d the LCO terminated at 1729 hours0.02 days <br />0.48 hours <br />0.00286 weeks <br />6.578845e-4 months <br /> on 1-16-87.
1-9-87 At 0735 hours0.00851 days <br />0.204 hours <br />0.00122 weeks <br />2.796675e-4 months <br /> the
'B' Recirculation M G-S e t tripped due to problems wIth the
'B' Recirc Lube Oil Pump breaker.
This placed the plant in single loop operation (SLO).
Repairs were ma de to the breaker cubicle and the
'B' Recirculation pump was returne d to service et 1340 hours0.0155 days <br />0.372 hours <br />0.00222 weeks <br />5.0987e-4 months <br />.
At 1443 hours0.0167 days <br />0.401 hours <br />0.00239 weeks <br />5.490615e-4 months <br /> the Turbine Bull ding Sample con duct i v i ty element was remove d from service to repInce a di r ty filter.
This placed the plant In a 30 day LCO.
At 1707 hours0.0198 days <br />0.474 hours <br />0.00282 weeks <br />6.495135e-4 months <br /> on 1-12-87 the LCO was exited with the con du ct I v i ty element being returne d to service.
1-12-87 At 1106 hours0.0128 days <br />0.307 hours <br />0.00183 weeks <br />4.20833e-4 months <br /> a 7 day LCO was entered when the diesel fire pump was remove d from service to secure a coo l a n t leak discovered on the engine.
A bushing o1 the thermostat was t ightene d, the pump returned to service, and the LCO exited at 2004 hours0.0232 days <br />0.557 hours <br />0.00331 weeks <br />7.62522e-4 months <br />.
1-13-81 At 0751 hours0.00869 days <br />0.209 hours <br />0.00124 weeks <br />2.857555e-4 months <br /> e 30 day LCO was entered when a reactor water con duct ivity element wa s rr,mo v e d for service for p l anne d ma i ntenance. As require d by Techntesi Specifications an alternate sample path was established.
The LCO was exite d at 17'.1 hoers on 1-23-87 wIth the element being returned to ser vice.
At 1110 hours0.0128 days <br />0.308 hours <br />0.00184 weeks <br />4.22355e-4 months <br /> the
'C' torus level recor der was removed from service for planne d mai ntenance.
This placed the plant in a 30 day LCO.
The recor ders s l l dew i re mechanism weis ref urbished an d the recor der was returned to service.
The LCO was terminated at 1047 hours0.0121 days <br />0.291 hours <br />0.00173 weeks <br />3.983835e-4 months <br /> on 1-14-87 L...
a DOCKET NO. 050-0331 UNIT Durnn Arnald En roy C ater D AT E 02-15-87 COMPLETED BY Bra df or d N.
Thomas T EL EPHON E 319-851-7309 N ARRATIV E
SUMMARY
OF OPER ATI NG EXPERI ENCE At 1118 hours0.0129 days <br />0.311 hours <br />0.00185 weeks <br />4.25399e-4 months <br /> a 30 day LCO was entered due to removing a drywell-level transmitter for maintenance.
The zero setting was a dj u s te d, an d the LCO was exited at 1929 hours0.0223 days <br />0.536 hours <br />0.00319 weeks <br />7.339845e-4 months <br /> on 1-14-87 with the transmitter being returned to service.
1-14-87 At 2009 hours0.0233 days <br />0.558 hours <br />0.00332 weeks <br />7.644245e-4 months <br /> the Reactor Water Cleanup (RWCU) system isolated due to signal from a di f f erential temperature switch which receives inputs from temperature sensing elements In the RWCU heat exchanger room.
The system respon de d as des igne d as the RWCU outboar d Isolation valve, en d RWCU f ee dwater return isolation valve closed. Operations personnel di spatche d to the RWCU heat exchanger reporte d a slight steam leak coming from the root isolation valve on the pressure i n di cator for the regenerative heat exchanger.
The root valve was ba cksea te d, an d the packing was tightened.
At 2328 hours0.0269 days <br />0.647 hours <br />0.00385 weeks <br />8.85804e-4 months <br /> the RWCU system was returne d to service.
(LER 87-001) 1-15-87 At 1355 hours0.0157 days <br />0.376 hours <br />0.00224 weeks <br />5.155775e-4 months <br /> the
'B' Stan dby Gas Treatment (S8GT) System was removed f rom service for planned surveillance testing. This placed the plant in a7 day LCO.
The once per operating cycle HEPA Charcoal Filter Efficiency test was successfully performed an d the system returned to its normal stan dby rea diness mo de at 1735 hours0.0201 days <br />0.482 hours <br />0.00287 weeks <br />6.601675e-4 months <br /> on 1-16-87 The LCO was exited at this time.
1-17-87 At 0716 hours0.00829 days <br />0.199 hours <br />0.00118 weeks <br />2.72438e-4 months <br /> a 7 day LCO was entere d when the
'A'
$8 GT system was remove d from service for planned surveillance testing.
The once per operating cycle HEPA Charcoal Filter Efficiency Test was perf orme d.
The LCO was cancelled at 1227 hours0.0142 days <br />0.341 hours <br />0.00203 weeks <br />4.668735e-4 months <br /> with the system being returne d to service.
1-19-87 At 0328 hours0.0038 days <br />0.0911 hours <br />5.42328e-4 weeks <br />1.24804e-4 months <br /> a7 day LCO was entered when the
'A' Emergency Diesel Generator was remo ve d from service because of a broken oil booster air line, which was discovered du r i ng surveillance testing. The air line was re p l a ce d, an d the LCO exited at 1425 hours0.0165 days <br />0.396 hours <br />0.00236 weeks <br />5.422125e-4 months <br /> with the Diesel Generator being r aturne d to service.
1-28-87 At 0547 hours0.00633 days <br />0.152 hours <br />9.044312e-4 weeks <br />2.081335e-4 months <br /> the
'A' SB GT system was removed from service for annual I
instrument calibration. At 1237 hours0.0143 days <br />0.344 hours <br />0.00205 weeks <br />4.706785e-4 months <br /> the
'A' Stan dby F 7 lier Unit (SFU) was removed f rom service for annuel Inst ument cellbr971on.
This placed the plant in two (2) separate 7 day LCOs.
Following successful completion of the respective systems Insteument calibration, both systems were returred to service at 1904 Sours on 1-29-87 The LCOs were terminated at this time.
1-31-87 At the end of the month DAEC was operating at approximately 79% of rated power, with no Limiting Con dition for Operation e/Isting.
Iowa Electric Light and Power Company February 15, 1987 DAEC-87-0093 Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Comission Washington, D. C.
20555 Attn: Document Control Desk
Subject:
Duane Arnold Energy Center Docket No. 50-331 Op. License DPR-49 January, 1987 Monthly Operating Report
Dear Sirs:
Please find enclosed 12 copies of the Duane Arnold Energy Center Monthly Operating Report for January,1987. The report has been prepared in accordance with the guidelines of Regulatory Guide 1.16 and distribution has been made in accordance with DAEC Technical Specifications, Appendix A, Section 6.11.1.c and Regulatory Guide 10.1.
tr
- urs, 2/9 )
J aniel
. Mineck Y
Plant Superintendent - Nuclear i
Duane Arnold Energy Center Enclosures File A-118d cc: Director, Office of Inspection Mr. Phillip Ross and Enforcement U. S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission Maryland National Bank Building i-Region III Washington, D. C.
20555 799 Roosevelt Road Glen Ellyn, IL 60137 (1)
NRC Resident Inspector Director, Office of Management and Mr. Dennis Murdock Program Analysis Central Iowa Power Cooperative U. S. Nuclear Regulatory Commission Box 2517 Washington, D. C. 20555 (1)
Cedar Rapids, IA 52406 Mr. Robert A. Gilbert Mr. Russ Gamble Project Manager Corn Belt Power Cooperative BWR Project Directorate #2 1300 13th Street North U. S. Nuclear Regulatory Commission Humboldt,!IA 50548 7920 Norfolk' Avenue-Bethesda,10 20814 INP0 Records Center 1100 Circle 75 Parkway h
Suite 1500 Atlanta, GA 30339
- t)i l
Duane Arnold Energy Center
- 3277 DAEC kud
- Palo, Iowa 32324
- 319l8317611