Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 42260 +
- ENS 52404 +
- 05000325/LER-2006-001 +
- ML111940492 +
- ML17325A237 +
- ML20028D134 +
- ML19305D309 +
- ENS 42254 +
- ML031990246 +
- ML020420381 +
- ML20101C347 +
- ML20107E724 +
- ML20115A468 +
- ML20140H044 +
- ML20069A274 +
- ML20065F842 +
- ML20237E620 +
- ML20210T778 +
- 1CAN039607, Monthly Operating Rept for Feb 1996 for Arkansas Nuclear One Unit 1 +
- IR 05000324/1982024 +
- 05000029/LER-1987-014, :on 871121,plant Shutdown Initiated.Caused by Nonreturn Valve (Nrv) Low Nitrogen Pressure & Instrumentation Inaccuracy.Procedure to Charge Nitrogen to Nrv Accumulator Will Be Changed +
- 05000293/LER-1999-008-02, :on 990805,automatic Scram Occurred While at 100% Power Due to Automatic Turbine Trip.Caused by Malfunction of Moisture Separator Drain Tank a Drain Valve Controller.Level Controllers Replaced.With +
- 05000352/LER-1986-028, :on 860603,ESF Actuated Control Room Emergency Fresh Air Sys.Caused by Ventilation Sys Toxic Gas Analyzer Misinterpreting Freon Refrigerant as Toxic Gas.Ventilation Manually Isolated +
- 05000324/LER-1999-002-02, :on 990329,reactor Tripped.Caused by Failed Electrical Connections on Vibration Detector for Number 9 Main Turbine Bearing.Vibration Detectors for Main Turbine Number 9 Bearing Replaced.With +
- 05000374/LER-1984-090, :on 841216,primary Containment Vacuum Breaker a Cycled Open & Then Closed.Caused by Temp/Pressure Decrease in Primary Containment Due to Operation of Vent & Purge Sys or Startup of Containment Chiller +
- 05000277/LER-1992-006, :on 920407,reactor Scram Initiated When Weld Leak Discovered on 1-inch Vent Line & Line Could Not Be Isolated.Caused by High Frequency Vibration on Line.Scram & Isolation Logics Reset & Weld Repaired +
- 05000455/LER-1995-002-03, :on 950331,TS LCO Action Requirement Not Entered Prior to Valve Work.Caused by Personnel Error.Shift Supervisor Counselled & Work Request Approval Page Revised +
- 05000416/LER-1995-009-01, :on 950717,HPCS Injection Occurred Due to Invalid Low Water Level Signal.Tripped HPCS Pump & Restored HPCS Sys to Standby +
- 05000455/LER-1995-002-09, :on 950331,extraction Steam Valve Was W/O Lcoar Entry Due to Personnel Error.Shift Supervisor Has Been Counseled on Responsibilities Re Work Request Authorization +
- 05000331/LER-1993-012, :on 931129,primary Containment Isolation Sys Half Group 3 Isolation Occurred Due to Degraded Relay Contact in Logic Sys.Automatic Actions Confirmed,Isolation & Half Scram Reset & SBGT Secured +
- ML20033G362 +
- 05000311/LER-1994-009-01, :on 940715,two Intentional TS 3.0.3 Entries Occurred Due to Deenergizing Arpi Sys for All Control Rods.Caused by Design Manufacturing.Module 2SB2 & Span of Module Were Adjusted +
- 05000315/LER-2006-001, Regarding Plant Shutdown Required by Technical Specification Action 3.6.5.B.1 +
- 05000293/LER-1999-008-01, Regarding Automatic Scram at 100 Percent Power Due to Turbine Trip +
- ML19317F878 +