-s h
t
\\'
SACRAMENTO MUNICIPAL UTILITY DISTRICT C 6201 S Street. Box 15830. Sacramento, California 95813; (916) 452-3211 April 25,1977
^
,.,$.+
t MK..-. ?/g
.i E DE C()py
[,$t$d "q,j F:? "h 4h
}
Ti.iTN!
3-
}% L(;.7'./ h
/
Mr. R. H. Engelken
, i "D'"
N',A, i,
~ '
Director of Regulatory Operations NRC Operations Office, Region V Nc N
1990 N. California Boulevard Walnut Creek Plaza, Suite 202
-e Walnut Creek, California 94596 j
Re: Operating License DPR-54 g
"i Docket No. 50-312 Reportable Occurrence 77-4
Dear Mr. Engelken:
i In accordance with Technical Specifications for Rancho Seco Nuclear
(
Generating Station, Section 6.9.1 and Regulatory Guide 1.16, Revision 4,
' 'j Section C.2.b.2, the Sacramento Municipal Utility District is hereby reporting the following Reportable Occurrence as RO 77-4.
On '.pril 1, 1977, the Auxiliary Building stack radiation monitor (particulate) was taken out of service at 1014 hours0.0117 days <br />0.282 hours <br />0.00168 weeks <br />3.85827e-4 months <br /> for repair. Technical ~
Specifications Appendix B, Section 2.6.4.B, requires that when this monitqr:
is removed from service, daily grab samples must be taken and analyzed for gross radioactivity. Grab sampling was not performed for the period the monitor was out of service, which lasted until 1600 on April 4,1977.
The Control Room was informed of the planned repair work and logged the monitor out-of-service on Friday, April 1, but no mention of the monitor's status was made in the log at subsequent shift changes. No radiation / chemistry personnel were contacted to take the required samples over the weekend period and that omission was not ruted until the monitor was returned to service the following Monday.
There was no abnormal release of radioactivity during the period d
that this r taitor was inoperable. The Auxiliary Building stack gas radiation monitor was operable throughout the repair except for a 39-minute period on April 4.
No high activity levels were detected on that monitor, no waste gas decay tanks were released and no significant releases of airborne activity j
occurred which would have been released up the Auxiliary 'iilding stack.
'l
~
%J an O
I g
g O
e g
e
i I
/
1 Mr. R. H. Engelken
-2 April 25,~1977 The Assistant-Superintendent, Nu ear Plant Operations, will insure that the Shift Supervisors discuss with their crews the importance of trans-i mitting equipment operability status at shif t changes and discuss the ' sampling Ei t
. requirements when certain monitors are ttaken out of service.
There was no plant transient as.sociated with this occurrence.
Respectfully submitted, a
Yh l
l
.' J. Mattimoe c
l Assistant General-Manager g
t i
and Chief Engineer
/
/
t i
I
,I.
1 1
j s
-).
i i
i l
I j.
,/
1 l, '
l af 4
JJM:RWC: sal Enclosure
~
j es: Director, MIPC (3) 4,.
. Director, IE (30).
e i
i,
1
~
l l
1 1'
-. _. _ _. _. - _.. -.. _,.. _... -. _.. -. _.. _., _.. -.. - ~, _....