Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML25294A148 + (ML25294A148)
- ML25294A150 + (ML25294A150)
- ULNRC-06976, Enclosure 3: Affidavits for Proprietary Documents + (ML25294A151)
- ML25294A152 + (ML25294A152)
- ML25294A209 + (ML25294A209)
- L-25-010, 10 CFR 72.48 Biennial Change Summary Report + (ML25294A257)
- ML25294A557 + (ML25294A557)
- ML25294A697 + (ML25294A697)
- 05000327/LER-2025-001-01, Manual Reactor Trip Due to Reboot of the Distributed Control System and Lowering Steam Generator Levels + (ML25295A001)
- ML25295A002 + (ML25295A002)
- ML25295A003 + (ML25295A003)
- BW250046, Core Operating Limits Report (COLR) for Braidwood Unit 1 Cycle 26, Revision 22 + (ML25295A004)
- ML25295A045 + (ML25295A045)
- ML25295A128 + (ML25295A128)
- L-2025-168, Subsequent License Renewal Commitments 20 and 21 Revisions + (ML25295A251)
- 05000251/LER-2025-005, A Main Steam Isolation Valve Failed to Fully Close Resulting in Loss of Safety Function + (ML25295A315)
- CP-202500317, (CPNPP) - Registration of Dry Spent Fuel Storage Canisters + (ML25295A338)
- L-25-007, Endorsement of Westinghouses Requested Review Schedule for Topical Report WCAP-19042-P, Revision 0, Protk Nuclear Instrumentation System Topical Report + (ML25295A482)
- ML25295A483 + (ML25295A483)
- L-25-190, Vistra Operations Company LLC (Vistra Opco), License Amendment Request - Alternative Technical Specification (TS) 3.8.1 Action A.3 Completion Time for an Inoperable Offsite Source + (ML25295A487)
- L-25-008, Support for Urenco’S Exemption Request for Leu+ UF6 Transportation in 30B Cylinders + (ML25295A488)
- ML25295A489 + (ML25295A489)
- ML25295A491 + (ML25295A491)
- ML25295A535 + (ML25295A535)
- PNP 2025-078, Response to Request for Additional Information Regarding Relief Request Number RR 5-10, Proposed Alternative to ASME Section XI Code Requirements for Modification of Reactor Pressure Vessel Head Vent Line Penetration + (ML25295A537)
- WBL-25-048, Cycle 6 Steam Generator Tube Inspection Report + (ML25295A538)
- ML25295A539 + (ML25295A539)
- L-PI-25-045, Core Operating Limits Report (COLR) Cycle 34, Revision 0 + (ML25295A685)
- ML25296A019 + (ML25296A019)
- ML25296A020 + (ML25296A020)
- RA-24-0247, AP1000 Combined License Application Departure Report Update and Annual Final Safety Analysis Report (FSAR) Update + (ML25296A026)
- 05000282/LER-2025-003, Nuclear Instrumentation Over-Temperature Delta Temperature Function Inoperable Due to Defective Potentiometers + (ML25296A198)
- ML25296A199 + (ML25296A199)
- ML25296A226 + (ML25296A226)
- ML25296A227 + (ML25296A227)
- ML25296A229 + (ML25296A229)
- ML25296A230 + (ML25296A230)
- 05000237/LER-2024-001-01, Containment Cooling Service Water Valve Failure Resulted in a Condition Prohibited by Technical Specifications and Loss of Safety Function + (ML25296A231)
- ML25296A447 + (ML25296A447)
- ML25296A460 + (ML25296A460)
- RS-25-145, Radiological Emergency Plan Addendum Revision. Includes EP-AA-1003, Addendum 3, Revision 9, Emergency Action Levels for Clinton Station + (ML25296A461)
- ML25296A463 + (ML25296A463)
- ML25296A465 + (ML25296A465)
- NL-25-0404, Cycle 34 Core Operating Limits Report + (ML25296A467)
- 05000249/LER-2024-002-02, Low Pressure Coolant Injection Pump Suction Relief Valve Inoperable as a Primary Containment Isolation Valve Resulted in a Condition Prohibited by Technical Specifications + (ML25296A468)
- IR 05000298/2026301 + (ML25297A107)
- ML25297A163 + (ML25297A163)
- ML25297A164 + (ML25297A164)
- ML25297A165 + (ML25297A165)
- ML25297A166 + (ML25297A166)
- ML25297A167 + (ML25297A167)