| From: | Joseph Demarshall NRC/RGN-I/DORS/OB |
| To: | Constellation Energy Generation |
| References | |
| EPID L-2024-OLL-0018 | |
| Download: ML25295A489 (0) | |
Text
The Attachments to this letter contain NRC Examination Material which should be withheld from public disclosure for 2 years following the Examination per 10 CFR 2.390, 55.49, NUREG-1021, and OLMC-520. Upon separation, this cover letter is decontrolled.
Constellation~
February 20, 2024 Raymond K. Lorson Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road, Suite 102 King of Prussia, PA 19406-1415
Subject:
R.E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 NRC Docket No. 50-244 Submittal of Initial Operator Licensing Examination Outline James D. Blankenship Site Vice President R.E. Ginna Nuclear Power Plant 1503 Lake Rd.
315 7915200 Office 1ames.blankensh1p@constellat1on.com www.constellat1on.com
Reference:
(1)
Letter from Donald E. Jackson (NRC) to David Rhoades (Constellation Energy), R.E.
Dear Mr. Lorson:
Ginna Nuclear Power Plant - Senior Reactor and Reactor Operator Initial License Examinations, dated December 12, 2023 Below is a list of the examination outlines supporting the initial license exam scheduled for July 22, 2024, through July 30, 2024, at R. E. Ginna Station which have been sent to the Chief Examiner.
This submittal includes all appropriate examination standard forms and outlines in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 12. The written examination outline was originally developed by the Chief Examiner, Mr. Joseph DeMarshall.
In accordance with NUREG-1021, Revision 12, Section ES-1.3, "Examination Security, as amplified by OLMC-520, Section C.5, "Delayed Release of Examination Material", please ensure that these materials are withheld from public disclosure for two (2) years after the examinations are complete.
Should you have any questions concerning this letter, please contact the Manager, Site Regulatory Assurance, Justin Knowles, at 315-791-3393. For questions concerning examination materials, please contact the Lead Regulatory Exam Author, Donald Dean, at 315-791-5315.
Respectfully, J° mes D. Blankenship Site Vice President SAAS: 3D.100; Retain this document until all regulatory actions associated with the exam are complete, at which time it may be discarded.
The Attachments to this letter contain NRC Examination Material which should be withheld from public disclosure for 2 years following the Examination per 1 O CFR 2.390, 55.49, NUREG-1021, and OLMC-520. Upon separation, this cover letter is decontrolled.
February 20, 2024 U.S. Nuclear Regulatory Commission Page2
Enclosures:
Hard copy enclosures via FedEx to J. DeMarshall, Chief Examiner, NRC Region I Examination Security Agreements (Form 1.3-1)
Administrative Topics Outlines (Form 3.2-1)
Senior Reactor Operator (SRO)
Control Room/In-Plant Systems Outline (Form 3.2-2)
Scenario Outlines (Form 3.3-1)
Scenario #1 Scenario #2 Scenario #3 Scenario #4 Completed Checklists Examination Outline Quality Checklist (Form 2.3-1)
Events and Evolutions Checklist (Form 3.4-1)
Draft NRC Examination Administration Schedule cc:
Mr. D. Jackson, Chief, NRC Operator Licensing Branch (w/o enclosures)
Mr. J. DeMarshall, Chief Examiner, NRC Region I (w/ hard copy enclosures via FedEx)
Mr. V. Sreenivas, Ginna Station Project Manager, NRR (w/o enclosures)
Mr. J. Schussler, NRC Ginna Sr Resident Inspector (e-mail, w/o enclosures)
SRRS: 3D.100; Retain this document until all regulatory actions associated with the exam are complete, at which time it may be discarded.
BCC:
Mr. J. Blankenship, Site Vice President - Ginna Station Mr. D. Gullott, Vice President - Licensing and Regulated Ms. S. Mokkapati, Director, Licensing Mr. J. Knowles, Manager, Site Regulatory Assurance - Ginna Station Mr. S. Moore, Manager, Human Resources - Ginna Station Mr. S. Minya, Senior Manager Site Training - Ginna Station Mr. P. Isham, Regulatory Exam Expert Mr. C. Swisher, NRC Ginna Resident Inspector SRRS: 30.100; Retain this document until all regulatory actions associated with the exam are complete, at which time it may be discarded.
The Attachments to this letter contain NRC Examination Material which should be withheld from public disclosure for 2 years following the Examination per 1 O CFR 2.390, 55.49, NUREG-1021, and OLMC-520. Upon separation, this cover letter is decontrolled.
Constellation.
May 7, 2024 Raymond K. Lorson Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road, Suite 102 King of Prussia, PA 19406-1415 R.E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 NRG Docket No. 50-244 James D. Blankenship Site Vice President R.E. Ginna Clean Energy Center 1503 Lake Rd 315 7915200 Office 1ames blankensh1p@constellation com www constellation com
Subject:
Submittal of Integrated Initial License Training Examination Materials
Reference:
(1)
Letter from Donald E. Jackson (NRG) to David Rhoades (Constellation Energy), R.E.
Dear Mr. Lorson:
Ginna Nuclear Power Plant - Senior Reactor and Reactor Operator Initial License Examinations, dated December 12, 2023 Below is a list of the examination materials which R.E. Ginna is submitting in support of the initial license examination scheduled for July 22, 2024, through July 30, 2024, at R. E. Ginna Station which have been sent to the Chief Examiner, Mr. Joseph DeMarshall.
This submittal includes the Senior Reactor Operator and Reactor Operator Written Examinations, Job Performance Measures, and Integrated Plant Operation Scenario Guides.
These examination materials have been developed in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors", Revision 12. Please note that reference materials are attached to each individual examination question or item.
Some minor modifications have been made to the Integrated Examination Outline with regard to the operational scenarios in order to improve balance and content. These changes improve examination quality and are in compliance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors", Revision 12.
Some modifications or adjustments to the examination material may be required due to procedural changes.
In accordance with NUREG-1021, Revision 12, Section ES-1.3, "Examination Security", as amplified by OLMC-520, Section C.5, "Delayed Release of Examination Material", please ensure that these materials are withheld from public disclosure for two (2) years after the examinations are complete.
SAAS: 30.100; Retain this document until all regulatory actions associated with the exam are complete, at which time it may be discarded.
The Attachments to this letter contain NRC Examination Material which should be withheld from public disclosure for 2 years following the Examination per 10 CFR 2.390, 55.49, NUREG-1021, and OLMC-520. Upon separation, this cover letter is decontrolled.
Should you have any questions concerning this letter, please contact the Manager, Site Regulatory Assurance, Justin Knowles, at 315-791-3393. For questions concerning examination materials, please contact the Lead Regulatory Exam Author, Donald Dean, at 315-791-5315.
Respectfully, ames D. Blankenship Site Vice President SAAS: 3D.100; Retain this document until all regulatory actions associated with the exam are complete, at which time it may be discarded.
The Attachments to this letter contain NRC Examination Material which should be withheld from public disclosure for 2 years following the Examination per 1 O CFR 2.390, 55.49, NUREG-1021, and OLMC-520. Upon separation, this cover letter is decontrolled.
May 7, 2024 U.S. Nuclear Regulatory Commission Page 3
Enclosures:
Hard copy enclosures via FedEx to J. DeMarshall, Chief Examiner, NRC Region 1 Form 3.2-1, Administrative Topics Outline for SRO Form 3.2-2, Control Room/In-Plant Systems Outline Form 4.1-PWR, Pressurized-Water Reactor Examination Outline (RO and SRO)
(Provided by NRC)
Form 4.1-COMMON, Generic Knowledge and Abilities Outline (Tier 3) and Theory (Tier
- 4) (Provided by NRC)
Form 4.2-1, RO/SRO Composite Written Examination, with references attached Form 3.2-3, Control Room/ In-Plant Job Performance Measures, with references attached Form 3.2-3, Administrative Topic Job Performance Measures, with references attached Form 3.3-1, Scenario Outline, Scenario #1 Form 3.3-2, Integrated Plant Operation Scenario Guide, Scenario #1 Form 3.3-1, Scenario Outline, Scenario #2 Form 3.3-2, Integrated Plant Operation Scenario Guide, Scenario #2 Form 3.3-1, Scenario Outline, Scenario #3 Form 3.3-2, Integrated Plant Operation Scenario Guide, Scenario #3 Form 3.3-1, Scenario Outline, Scenario #4 Form 3.3-2, Integrated Plant Operation Scenario Guide, Scenario #4 Form 1.3-1, Examination Security Agreement Form 2.3-2, Operating Test Quality Checklist Form 2.3-4, Written Examination Quality Checklist Form 3.4-1, Events and Evolutions Checklist Cc:
Mr. D. Jackson, Chief, NRC Operator Licensing Branch, Region 1 (w/o enclosures)
Mr. J. DeMarshall, Chief Examiner, NRC Region 1 (w/ hard copy enclosures via FedEx)
Mr. V. Sreenivas, Ginna Station Project Manager, NRA (w/o enclosures)
Mr. J. Schussler, NRC Ginna Sr Resident Inspector (e-mail, w/o enclosures)
SRRS: 30.100; Retain this document until all regulatory actions associated with the exam are complete, at which time it may be discarded.
The Attachments to this letter contain NRC Examination Material which should be withheld from public disclosure for 2 years following the Examination per 10 CFR 2.390, 55.49, NUREG-1021, and OLMC-520. Upon separation, this cover letter is decontrolled.
Bee:
Mr. J. Blankenship, Site Vice President - Ginna Station Mr. D. Gullatt, Vice President-Licensing and Regulated Ms. S. Mokkapati, Director, Licensing Mr. J. Knowles, Manager, Site Regulatory Assurance - Ginna Station Mr. S. Moore, Manager, Human Resources - Ginna Station Mr. S. Minya, Senior Manager Site Training - Ginna Station Mr. C. Swisher, NRC Ginna Resident Inspector SRRS: 3D.100; Retain this document until all regulatory actions associated with the exam are complete, at which time it may be discarded.