Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000282/1998007 + (ML20248M135)
- ML20248M136 + (ML20248M136)
- ML20248M137 + (ML20248M137)
- ML20248M138 + (ML20248M138)
- ML20248M139 + (ML20248M139)
- ML20248M140 + (ML20248M140)
- ML20248M141 + (ML20248M141)
- ML20248M142 + (ML20248M142)
- ML20248M143 + (ML20248M143)
- ML20248M145 + (ML20248M145)
- ML20248M146 + (ML20248M146)
- ML20248M147 + (ML20248M147)
- ML20248M149 + (ML20248M149)
- ML20248M150 + (ML20248M150)
- ML20248M152 + (ML20248M152)
- ML20248M154 + (ML20248M154)
- 05000373/LER-1998-002, Forwards LER 98-002-00,per 10CFR50.73(a)(2)(i).Commitments Made by Util,Encl + (ML20248M155)
- 05000373/LER-1998-002-06, :on 980510,noted That EDGs Were Not Being Declared Inoperable in Quarterly Tests When Engine Cooling Was Involved.Caused by Failure to Establish Procedural Guidance.Will Revise Diesel Surveillance Procedures + (ML20248M158)
- ML20248M159 + (ML20248M159)
- ML20248M161 + (ML20248M161)
- 05000352/LER-1998-009, :on 841026,noted That Primary Containment Overcurrent Protection Circuits May Not Have Provided Redundant Protection.Caused by Original Licensing Basis Interpretation.Corrected Affected Subject Circuits + (ML20248M164)
- ML20248M165 + (ML20248M165)
- ML20248M166 + (ML20248M166)
- ML20248M167 + (ML20248M167)
- ML20248M169 + (ML20248M169)
- ML20248M170 + (ML20248M170)
- 05000336/LER-1998-010, Forwards LER 98-010-00,documenting Event That Occurred at Unit 2 on 980508.Util Commitments Made within Ltr Included in Attachment 1 + (ML20248M171)
- ML20248M173 + (ML20248M173)
- ML20248M174 + (ML20248M174)
- ML20248M175 + (ML20248M175)
- L-98-083, Forwards BVPS Unit 1 Facility Changes,Tests & Expriments for Period 960123-970122, Per 10CFR50.59 + (ML20248M176)
- ML20248M178 + (ML20248M178)
- IA-98-214, Informs That Commission Has Reviewed Tokai Reprocessing Plant Options Paper as Forwarded by Secretary of State & Provides Listed Comments + (ML20248M179)
- ML20248M179 + (ML20248M179)
- ML20248M180 + (ML20248M180)
- 05000336/LER-1998-010-01, :on 980508,discovered That Encl Bldg Surveillance Procedure Did Not Adequately Verify Leak Integrity of Encl B.Caused by Inadequate Evaluation of Phenomenon Described in NRC Info Notice.Amend Implemented + (ML20248M181)
- ML20248M183 + (ML20248M183)
- ML20248M184 + (ML20248M184)
- ML20248M186 + (ML20248M186)
- L-98-110, Forwards Proposed Rev 2F to BVPS Unit 2 Inservice Testing (IST) Program for Pumps & Valves, for NRC Review & Approval + (ML20248M188)
- ML20248M190 + (ML20248M190)
- ML20248M191 + (ML20248M191)
- ML20248M192 + (ML20248M192)
- ML20248M194 + (ML20248M194)
- ML20248M195 + (ML20248M195)
- ML20248M196 + (ML20248M196)
- ML20248M197 + (ML20248M197)
- ML20248M198 + (ML20248M198)
- ML20248M199 + (ML20248M199)
- IR 05000445/1998011 + (ML20248M200)
- ML20248M203 + (ML20248M203)