Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20248L892 + (ML20248L892)
- 05000446/LER-1997-004-01, :on 971108,gaps in Structural Components of Containment Sump Trash Racks Was Noted.Caused by Incomplete Corrective Actions Documents.Verified That Condition Does Not Negatively Interact W/Condition Reported in Unit 2 + (ML20248L893)
- ML20248L895 + (ML20248L895)
- ML20248L896 + (ML20248L896)
- IR 05000458/1998004 + (ML20248L897)
- ML20248L898 + (ML20248L898)
- ML20248L900 + (ML20248L900)
- ML20248L901 + (ML20248L901)
- ML20248L902 + (ML20248L902)
- ML20248L903 + (ML20248L903)
- ML20248L904 + (ML20248L904)
- ML20248L905 + (ML20248L905)
- ML20248L906 + (ML20248L906)
- ML20248L908 + (ML20248L908)
- 05000213/LER-1998-006, :on 980507,design Deficiency Was Found in Stack RM RMS-14B Sampling Lines.Caused by Design Not Meeting ANSI N13.1-1969 Stds.Corrective Action Plan for RMS-14B Is Being Developed + (ML20248L909)
- IR 05000423/1997206 + (ML20248L910)
- ML20248L911 + (ML20248L911)
- ML20248L914 + (ML20248L914)
- ML20248L917 + (ML20248L917)
- ML20248L918 + (ML20248L918)
- NRC-98-0078, Responds to NRC Re Violations Noted in Insp Rept 50-341/98-03.Corrective Actions:Power Was Restored to Affected Loads by 1344 H & Division 2RPS B Power Was Restored to Normal Supply by 2257 H on 980220 + (ML20248L921)
- ML20248L923 + (ML20248L923)
- ML20248L926 + (ML20248L926)
- ML20248L927 + (ML20248L927)
- ML20248L928 + (ML20248L928)
- ML20248L929 + (ML20248L929)
- ML20248L930 + (ML20248L930)
- 05000293/LER-1992-001, :on 921219,Class I Piping Seismic Damping Ratios Found Were Not Approved by NRC for Use.Caused by Personnel Error.Class I Piping Evaluated Using Higher Damping Ratios & Declared Operable + (ML20248L931)
- ML20248L932 + (ML20248L932)
- ML20248L933 + (ML20248L933)
- ML20248L934 + (ML20248L934)
- ML20248L935 + (ML20248L935)
- ML20248L936 + (ML20248L936)
- ML20248L937 + (ML20248L937)
- ML20248L939 + (ML20248L939)
- ML20248L940 + (ML20248L940)
- ML20248L941 + (ML20248L941)
- ML20248L942 + (ML20248L942)
- ML20248L943 + (ML20248L943)
- ML20248L944 + (ML20248L944)
- 05000482/LER-1997-020, :on 971109,failure to Meet Snubber TS LCO Requirements Was Noted.Caused by Manufacturing Errors. Performed Sys Walkdowns,Replacement & Evaluations of Failed Snubbers & Associated Piping Sections + (ML20248L945)
- ML20248L946 + (ML20248L946)
- ML20248L947 + (ML20248L947)
- B16216, Responds to Questions Raised by NRC During Telcon Re Plant Unit 1 Proposed License Amend.Request for Addl Info Re Safety Relief Valves Encl + (ML20248L950)
- ML20248L951 + (ML20248L951)
- ML20248L952 + (ML20248L952)
- ML20248L953 + (ML20248L953)
- ML20248L955 + (ML20248L955)
- ML20248L956 + (ML20248L956)
- ML20248L958 + (ML20248L958)
- IA-98-118, First Partial Response to FOIA Request for Documents.Records Subj to Request Encl & Identified in App a + (ML20248L959)