Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20248A543 + (ML20248A543)
- IR 05000155/1989015 + (ML20248A544)
- ML20248A546 + (ML20248A546)
- ML20248A548 + (ML20248A548)
- ML20248A549 + (ML20248A549)
- ML20248A554 + (ML20248A554)
- ML20248A558 + (ML20248A558)
- ML20248A559 + (ML20248A559)
- ML20248A562 + (ML20248A562)
- 05000331/LER-1998-004, :on 980502,noted That Five of Eight Valves Failed to Meet Setpoint Requirements.Caused by Inadequate Corrective Actions.Replaced MSRVs Pilots & MSSVs W/Valves That Were Previously Set Pressure Tested + (ML20248A563)
- ML20248A566 + (ML20248A566)
- ML20248A568 + (ML20248A568)
- ML20248A569 + (ML20248A569)
- ML20248A573 + (ML20248A573)
- ML20248A574 + (ML20248A574)
- PNO-I-89-068, on 890804,full Power Reached & Mar 1987 Shutdown Order relaxed.Two-wk Mgt Assessment Period at steady-state 100% Power Plateau Begun,Per Restart Power Testing Program + (ML20248A575)
- ML20248A576 + (ML20248A576)
- IR 05000483/1989017 + (ML20248A577)
- NRC-89-0167, Addresses Status of Actions Arising from as-built Drawing Issue.All Category a & B Items Completed & Majority of Category C Deviations Resolved + (ML20248A579)
- 05000445/LER-1998-004, :on 980427,failure to Perform Response Time Testing of Shunt Trip Feature of Reactor Trip Breaker.Caused by Failure to Recognize Difference in Functional Designs. Breaker Was Declared Inoperable & Test Was Performed + (ML20248A581)
- ML20248A583 + (ML20248A583)
- IR 05000445/1989066 + (ML20248A586)
- ML20248A589 + (ML20248A589)
- IR 05000373/1998009 + (ML20248A591)
- ML20248A592 + (ML20248A592)
- ML20248A593 + (ML20248A593)
- IR 05000333/1989013 + (ML20248A595)
- ML20248A596 + (ML20248A596)
- ML20248A597 + (ML20248A597)
- ML20248A598 + (ML20248A598)
- ML20248A599 + (ML20248A599)
- ML20248A602 + (ML20248A602)
- ML20248A603 + (ML20248A603)
- ML20248A610 + (ML20248A610)
- IR 05000317/1989080 + (ML20248A611)
- ML20248A612 + (ML20248A612)
- ML20248A613 + (ML20248A613)
- ML20248A616 + (ML20248A616)
- ML20248A618 + (ML20248A618)
- ML20248A619 + (ML20248A619)
- ML20248A620 + (ML20248A620)
- ML20248A623 + (ML20248A623)
- ML20248A626 + (ML20248A626)
- ML20248A628 + (ML20248A628)
- ML20248A631 + (ML20248A631)
- ML20248A633 + (ML20248A633)
- BECO-89-144, Requests Interim Approval for Relief from Testing of RHR Sys Valves 63 & 64 Until Refueling Outage 8 Scheduled for 910315 + (ML20248A634)
- NUREG-1272, Forwards List of 1988 Lers,List of Abnormal Occurrences as Defined by NRC & Contained in 1988 AEOD Annual Rept,App B & Raw Data on Radioactive Matls Released Into Environ from Commercial Nuclear Power Plants in 1988.W/o Ref Encl + (ML20248A635)
- ML20248A637 + (ML20248A637)
- ML20248A639 + (ML20248A639)
- 05000267/LER-1989-011, :on 890623,discovered That Reheat Steam Attemperation Flow Not Accounted for in Secondary Heat Balance Calculation of Reactor Power.Caused by Inadequate Procedures.Procedure Changes Implemented + (ML20248A641)