Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000374/LER-1989-009-03, :on 890619,RCIC Steam Line Hi Flow Isolation Switch Found to Have Diaphragm Leak.Probably Caused by Torn Diaphragm.Failed Switch Sent to Vendor for Detailed Insp. New Switch Installed + (ML20247K348)
- ML20247K349 + (ML20247K349)
- ML20247K350 + (ML20247K350)
- IR 05000482/1989011 + (ML20247K351)
- ML20247K352 + (ML20247K352)
- ML20247K353 + (ML20247K353)
- ML20247K355 + (ML20247K355)
- ML20247K357 + (ML20247K357)
- ML20247K359 + (ML20247K359)
- ML20247K363 + (ML20247K363)
- ML20247K366 + (ML20247K366)
- ML20247K369 + (ML20247K369)
- ML20247K371 + (ML20247K371)
- ML20247K374 + (ML20247K374)
- ST-HL-AE-3021, Forwards Annotated FSAR Pages Necessary to Describe WRB-1 Correlation Per WCAP 8762-P-A, New Westinghouse Correlation WRB-1 for Predicting Critical Heat Flux (CHF) in Rod Bundles W/Mixing Vane Grids + (ML20247K375)
- 3F0589-21, Responds to Violations Noted in Insp Rept 50-302/89-06. Corrective Actions:Surveillance Procedures That Rely on Clearances for Valve Lineups Will Be Reviewed for Possible Weaknesses & Valve EGV-35 Opened to Correct Position + (ML20247K376)
- ML20247K377 + (ML20247K377)
- ML20247K385 + (ML20247K385)
- ML20247K387 + (ML20247K387)
- ML20247K388 + (ML20247K388)
- ML20247K391 + (ML20247K391)
- IR 05000409/1989001 + (ML20247K393)
- BECO-89-136, Application for Amend to License DPR-35,revising Tech Spec Section 3/4.9 to Incorporate Reactor Protection Sys Electrical Protection Assemblies + (ML20247K394)
- ML20247K395 + (ML20247K395)
- ML20247K397 + (ML20247K397)
- ML20247K400 + (ML20247K400)
- ML20247K403 + (ML20247K403)
- ML20247K404 + (ML20247K404)
- IR 05000160/1998201 + (ML20247K407)
- ML20247K408 + (ML20247K408)
- 05000313/LER-1989-013, :on 881025,anchor Support for Core Flood Tank (CFT) T2A Vent Line Not Seismically Qualified & Operability of CFT Could Not Be Assured.Caused by Missing Anchor Support.Anchor Support Modified + (ML20247K409)
- ML20247K411 + (ML20247K411)
- ML20247K412 + (ML20247K412)
- LIC-98-0065, Requests Termination of Reactor Operator License Held by Ja Cramer.Ja Cramer Terminated Employment W/Oppd Effective 980418 + (ML20247K413)
- ML20247K414 + (ML20247K414)
- 05000277/LER-1989-013-01, :on 890603,required Test for Diesel Generator Cardox Room Smoke Detectors Was Not Performed.Caused by Lack of Effective Method for Communicating Surveillance Test Status to Shift Manager + (ML20247K415)
- 05000313/LER-1989-016, :on 890414,noted That Firewater Deluge Valve for Emergency Diesel Generator Not Repaired Since Crack Fitting Identified in Oct 1988.On 890201,sys Inoperable While Attempting to Replace Fitting + (ML20247K416)
- 05000344/LER-1989-002, :on 890227,determined That Steam Generator Pressure/Temp Surveillance Did Not Provide Hourly Record of Primary & Secondary Steam Generator Pressure.Caused by Personnel Error.Generator Pressure Confirmed + (ML20247K417)
- ML20247K418 + (ML20247K418)
- ML20247K420 + (ML20247K420)
- ML20247K421 + (ML20247K421)
- ML20247K422 + (ML20247K422)
- ML20247K423 + (ML20247K423)
- ML20247K425 + (ML20247K425)
- ML20247K429 + (ML20247K429)
- ML20247K430 + (ML20247K430)
- ML20247K431 + (ML20247K431)
- ML20247K437 + (ML20247K437)
- ML20247K438 + (ML20247K438)
- 05000313/LER-1989-014, :on 890426 & 0504,control Room Emergency Ventilation Sys Automatically Actuated Nine Times as Result of Spiking of Radiation Monitor 2RE-8750-1.Detector Replaced & Bad Connection in Holder Repaired + (ML20247K441)
- ML20247K445 + (ML20247K445)