- _-
_
.,
. - -
-
!
4
r
1
MAY I 91989
"
In Reply Refer To:
,
Docket:
50-285/89-13
,
Omaha Public Power District
ATTN: fir. Kenneth 'J. liorris
Division Manager -
Nuclear Operations
-
1623 Harney Street
Omaha, Nebraska 68102
Gentlemen:
'
This refers to the inspection conducted by Messrs. P. H. Harrell and T. Reis of
this office during the period March 1-31, 1989, of activities authorized by NRC
Operating License DPR-40 for the Fort Calhoun Station', and to the discussion of
our findings with you and other members of your staff at the conclusion of the
inspection.
Areas examined during the inspection included review of previously identified
items; licensee event report followup; operational safety verification; plant
tours; safety-related system walkdown; monthly maintenance observations;
monthly surveillance observations; security observations; radiological
protection observations; in-office review of periodic, special, and nonroutine
event reports; and followup of onsite events. Within these areas, the
inspection consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the NRC inspectors.
The inspection findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations.
Your response should be based on the specifics contained
in the Notice of Violation enclosed with this letter.
Two. unresolved items are identified in paragraphs 6.d and 6.e of the enclosed
inspection report. The ur, resolved item identified in paragraph 6.d is related
to maintaining the screens installed on the component cooling water pumps.
It
is requested that you respond to this unresolved item with your position on
whether the component cooling water pump motor screens are required to be
installed to maintain the environmental equipment qualification status of the
motors.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 3 of the enclosed inspection report.
IV:RI
SRI h
DRP/B k
C:DRP/B
D.bRP
LTRees:nc
fPHHarrell
RPMullikin
hTFWesterman
LJJallan
,
f Tln /89
? S/f1/89
y/n/89
I 5/ff89
$/(9/89
i
890'6010298 890519
1 \\
ADOCK 05000285
Q
_.
_ _ _ _ _ _
1 ,> >
,
1.e fe.
,
.
g,.:
r .
.
4
. Omaha Public Power District
-2-
J
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection,.we will be pleased to
1
discuss them with you.
l
Sincerely,
Original StLaned By:
L. J. CALLAN
L. J. Callan, Director
Division of Reactor Projects
Enclosures:
,
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-285/89-13
cc w/ enclosures:
!
W. G. Gates, Manager
Fort Calhoun Station
P.O. Box 399
i
i
Fort Calhoun, Nebraska 68023
Harry H. Voigt, Esq.
LeBoeuf, Lamb, Leiby & MacRae
1333 New Hampshire Avenue, NW
Washington, DC 20036
Nebraska Radiation Control Program Director
l, Arc'c to' Di1B (IE01)
bec distrib. by RIV:
R. D. Martin, RA
- MIS System
- Section Chief (DRP/B)
- DRP
- RIV File
- Project Engineer (DRP/B)
- RSTS Operator
- P. Milano, NRR Project Manager (MS 13-D-18)
Lisa Shea, RM/ALF
- RRI
- DRS
- RPB-DRSS
- w/766
1