Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20245C980 + (ML20245C980)
- ML20245C982 + (ML20245C982)
- ML20245C985 + (ML20245C985)
- ML20245C986 + (ML20245C986)
- AECM-89-0112, Advises That Util Purchased No Electrical Components or Parts from Planned Maint Sys,Inc,Per NRC 890526 Request. Vendor Not Approved as Qualified Supplier for Facility + (ML20245C987)
- 05000440/LER-1989-009, :on 890321,discovered That Vent Sampler Flow Rate Monitor Had Inoperable Alarm Channel Since 890311 W/O Performing Action Required by Tech Spec.Caused by Personnel Error.Listed Alarms Reviewed + (ML20245C988)
- AECM-89-0081, Forwards Revised Response to 890414 Request for Info Re Status of TMI Action Plan Item Implementation,Per 890418-19 Discussions W/Nrc.Util Considers NRC Guidelines Encl in to Be Subj to Interpretation + (ML20245C991)
- IA-87-707, Final Response to FOIA Request for Plant Pra.Forwards App a Document.App a Document Also Placed in Pdr.Util Has Not Filed PRA + (ML20245C992)
- ML20245C992 + (ML20245C992)
- ML20245C994 + (ML20245C994)
- ML20245C997 + (ML20245C997)
- ML20245C998 + (ML20245C998)
- A07666, Forwards Response to NRC Bulletin 88-010 Re Nonconforming Molded Case Circuit Breakers.Nontraceable Breakers at Plant Will Be Replaced or Tested No Later than Next Refueling Outage,Currently Scheduled to Start 900825 & 890902 + (ML20245C999)
- IA-87-525, Final Response to Appeal of Denial of FOIA Request for Documents.Records Subj to Request Referred to Another Federal Agency for Review & Direct Response.No Further Action Being Taken on 871020 Appeal + (ML20245D001)
- ML20245D001 + (ML20245D001)
- ML20245D002 + (ML20245D002)
- IA-87-457, Partial Response to FOIA Request Re Documents.Forwards Apps a & B Documents.App a Documents Available in Pdr.App B Documents Withheld (Ref FOIA Exemption 5) + (ML20245D004)
- ML20245D004 + (ML20245D004)
- ML20245D007 + (ML20245D007)
- ML20245D008 + (ML20245D008)
- W3P89-3063, Forwards Change 1 to Rev 5 to Pump & Valve Inservice Test Plan, Based on NRC & 890509 Meeting + (ML20245D009)
- ML20245D011 + (ML20245D011)
- ML20245D012 + (ML20245D012)
- ML20245D014 + (ML20245D014)
- ML20245D015 + (ML20245D015)
- ML20245D016 + (ML20245D016)
- ML20245D017 + (ML20245D017)
- ML20245D018 + (ML20245D018)
- ML20245D019 + (ML20245D019)
- ML20245D022 + (ML20245D022)
- ML20245D023 + (ML20245D023)
- ML20245D024 + (ML20245D024)
- 05000311/LER-1989-010-02, :on 890520,RMS Plant Vent Noble Gas Monitor Channel Spiking Resulted in Containment purge/pressure- Vacuum Relief Sys & Waste Gas Decay Tank Vent Control Valve Isolation.Caused by Design/Equipment Problem + (ML20245D026)
- IR 05000413/1989008 + (ML20245D028)
- ML20245D029 + (ML20245D029)
- ML20245D031 + (ML20245D031)
- ML20245D032 + (ML20245D032)
- ML20245D037 + (ML20245D037)
- ML20245D039 + (ML20245D039)
- ML20245D043 + (ML20245D043)
- ML20245D044 + (ML20245D044)
- ML20245D045 + (ML20245D045)
- ML20245D047 + (ML20245D047)
- ML20245D050 + (ML20245D050)
- ML20245D052 + (ML20245D052)
- ELV-00609, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-424/89-13 on 890327-31.Corrective Actions:Rev to Procedure 00101-C, Drawing Control Completed to Include Distribution of Advanced Copies of as-built Notices + (ML20245D053)
- ML20245D054 + (ML20245D054)
- ML20245D056 + (ML20245D056)
- ML20245D059 + (ML20245D059)
- ML20245D060 + (ML20245D060)
- ML20245D062 + (ML20245D062)