TENNESSEE VALLEY AUTHORITY s
s h
SEQUOYAH NUCLEAR PLANT j
/f, SYSTEM OPERATING INSTRUCTION 4,;.,S,,(.'R
. ~ -
p SOI-68.1
.h} ' Y 4
Units 1 and 2 Revision 38-f PREPARED BY:
C. O. Brewer RESPONSIBLE SECTION:__ Operations REVISED BY:__
Myrna Lewallen/ Joyce Sylvester/
, W. L. Chandler SUBMITTED BY:,
- m,- r e, /
spTons/ble1SectionSupervisor PORC REVIEW DATE:
j APPROVED BY:_
f
/-
Plant Manager DATE APPROVED:
JUN 241987 Reason for revision (include all Instruction Change Form Nos ):
l Revised to incorporate ICF-87-496 and ICF-87-546:
corrected valve checklist; added_ steps to_ vent after running each RCP:
changed multiple steps _to single steps; added valve nomenclature:
added r_eturn to normal steps and sianoffs for independent verification h
where needed.
This revision constitutes a biennial review, in _
conjunction with SI-1, Appendix F Review Checklist.
The last page of this instruction is number: -
62 a 110 % $ $$ p PDR P
~
77
[-
SEQUOYAH NUCLEAR PLANT PL%NT INSTRUCTION REVISION LOG f.
SYSTEM OPERATING INSTRUCTION.
SOI-68.1
. REVISION Date Pages REASON FOR REVISION (INCLUDE COMMIT-LEVEL Approved Affected MENTS AND ALL ICF FORM NUMBERS) 9 11/30/79 ALL 9,12,13, 10 02/09/80 17,35 11 03/29/80 9 12 04/18/80 2,8-10 4,5,8,9,
_13 06/02/80 Added 5A
_14 09/09/80 10,29-31
'_15 07/30/81 7.17,27
. _16 09/05/81 6,14,37 12,17,18, 17 10/21/81 19,27
~
18 11/13/81 5A,6,7,8 19 12/10/81 8,12,17 Cover-l sheet,4, L.
5,5A,6-10 20 07/28/82 24-28 21 12/21/82 All 22 01/11/83 26,29 4-6,8-11, 15,20,21, 23,25,26, 23 10/20/83 29-31 0465L/,1dw L
l SEQUOYAH NUCLEAR PLANT
~
{
PLANT INSTRUCTION REVISION LOG L
(continued)
I SYSTEM OPERATING INSTRUCTION.
SOI-68.1 (CONTINUED)
REVISION Date Pages.
REASON FOR REVISION (INCLUDE COMMIT-LEVEL Approved Affected HENTS AND ALL ICF FORM NUM8ERS) 4,6,8-11, 15,16,25,
'24 02/13/84 29 25 05/21/84 All 23-25, 26 06/21/84 27-29 t
3,4,8,9 13,15,16, 27 10/12/84 21 28 11/21/84 20-29,31 29 12/12/83 6-10 30 01/04/85 All 31 01/09/85 10,17 32 07/12/85 3,31 Revised to clear configuration log and to reflect the normal position of the valves, which are closed, but may be opened if necessary to maintain proper 33 09/26/85 25,26 sprav line temperature.
Revised in accordance with ICF No.
34 01/15/86 20 85-1488, PORC approved 11/25/85.
Revised in accordance with ICF No.
35-03/31/86 27,28 86-0429, PORC approved 03/07/86.
~
Revised to change reference from main-4,10,17, tenance request (MR) to work request 36 06/24/86 19 (WR).
0465L/1dw.
e M
SSWP
(L n'
e v
~
SEQUOYAH NUCLEAR PLANT PLANT INSTRUCTION REVISION LOG.
(continued) i
~
SYSTEM OPERATING INSTRUCTION S0I-68.1 (CONTINUED)
REVISION Date Affected MENTS AND ALL ICF FORM NUMBERS)
Pages REASON FOR REVISION (INCLUDE COMMIT-LEVEL Approved Revised to add vendor references for INP0 commitment.concerning Generic Letter 83-28, Section 2.2.2: to correct valve checklist per WP 10597;.to match actual plant. status; to correct typogra-phical errors and add-fuse'identifica-tion. -Also, to provide a note to remind operator that UHI check valve opening test can be performed if it is due 2-13,16, following the designated step of the 18,19,21-SOI; to reflect correct Technical Speci-l 23,31,34-fication reference; and to correct pzr 37 11/20/86 37 high level alarm setpoint reference.
Revised to incorporate ICF-87-496 and ICF-87-546; corrected valve checklist; added steps to vent after running each RCP; changed multiple steps to single steps; added valve nomenclature; added return to normal steps and signoffs for independent verification where needed.
This revision constitutes a biennial review, in conjunction with SI-1,
, 38 06/24/87 All Appendix F Review Checklist.
AUG 2 619EU' 29 ct on 0465L/1ds e
M
-i l
1
SQN S01-68.1 Page 1 Revision 38 REACTOR COOLANT SYSTEM PURPOSE r
To provide the operating instructions for the following operations and equipment:
A.
Normal operation g
B.
Filling and venting C.
Draining Rx Coolant System D.
Pressurizer relief tank 1
1 F
t e.
L.
L.
i j
i\\4 q
~
\\'
\\
\\
\\,
3 1
\\'
l-(
02840/tir
'e 4
)
\\b s
} 4
A SQN SOI-68.1 Page 33 Revision 38-f-
DRAINING REACTOR. COOLANT.. SYSTEM Section C l
Page 1 of 11 Unit j
Date
.I.
PURPOSE I
To provide the conditions for operation, precautions, and the l
g instructions for draining the reactor coolant system for. vessel head e
removal and steam generator maintenance.
i II. CONDITIONS FOR OPERATION i
?
i A.
The reactor coolant system is in the refueling shutdown condition,
' j f
except the reactor. head is _ on.
i 1.
The temperature of the coolant is at or below 140*F.
2.
The pressurizer is completely filled with water.
3.
Degassing and purification of the reactor coolant has been 1
completed per.GOI-3C.
4.
The boron concentration has been increased to the cold shutdown or to the refueling shutdown condition as required.
k B.
RHR letdown, CVCS cleanup system and a charging pump in service.
j C.
The residual heat removal locp is in service.
D.
The waste disposal system is ready to receive vented gas.
E.
One holdup tank is less than 15 percent full.
F.
A mixed bed demineralized having an unused resin bed should be available.
i.
G.
The mixed bed demineralized in service should have a DF for I-131
~
in excess of 10.
H.
The cation demineralized bed and spent fuel pit demineralized bed l
should have a DF for CS-137 > 2 x 10.
8 1
J.
Letdown to the CVCS purification should be increased to the maximum letdown rate prior to cooldown and continued at the y
(
maximum flow throughout the shutdown.
, K.
The pressurizer relief tank level must be at 1 707. to allow air or nitrogen flow to the pressurizer as the RCS is drained.
i s
\\
02850/tir it 1
4 d-4
i SQN i
SOI-68.1 Page 34
. Revision 38
~
Section C-
~
DRAINING REACTOR COOLANT-SYSTEM Page 2 of.11 a
Unit Date
.)
III.
PRECAUTIONS A.
Request Radiological Control survey.
Radiation work permit will i
be issued if required.
Specified precautions shall.be followed.
4 B.
If the RCS is to be drained partially and the pressurizer is pressurized from the pressurizer relief. tank, the level. indicated by the. sight glass level indicator will not give a true. indication of water level in the pressurizer or the unvented reactor vessel.
f:
Once the reactor vessel vent valve 68-597 has been opened, the 1
sight glass will give an accurate indication.of reactor vessel
.i water level but not pressurizer water level.
With the pressurizer pressurized at 0.5 psig and the vessel vent valve'68-597 open, the-level indicated will be approximately 15 inches higher than the-actual pressurizer level.
C.
The water level in the reactor vessel must be below the reactor vessel flange before the head is unbolted for removal.
D.
The safety injection system automatic signal must be blocked.
E.
Close communication should be maintained between all personnel performing this instruction.
F.
Do not allow the pressure in the reactor coolant system to decrease below atmospheric.
G.
Hydrazine must not be added to the coolant during any phase of i
plant cooldown or shutdown.
1 H.
Inform Radiochemical Laboratory Shift Supervisor if there are any necessary deviations from the shutdown operations which could affect system chemistry.
Ii-J.
Monitor the oxygen concentration in the CVCS' holdup tanks when discharging reactor coolant to them.
K.
All transfers to the CVCS holdup tank should be made by draining through the demineralizers, via the RHR system.
L.
Observe the applicable radiation protection instructions when venting radioactive vapor and gases.
1 0285U/tir L
1
P*
SQN f' 11 S0I-68.1 I I b Page 35 d
Revision 38
~
Section C DRAINING REACTOR COOLANT SYSTEM
(
Page 3 of 11 Unit a
Date L
III. PRECAUTIONS (continued) r H.
The top of the RCS sightglass is - El. 705'6".
The bottom root valve for the pzr cold calibration level indicator is - El.
711'5".
Therefore, there is a 6-foot bilnd spot between the two level indicators.
N.
If water flows from the sightglass overflow piping when the sightglass is placed in service, the sightglass must be' isolated and drained to stop siphoning of the RCS through the sightglass.
IV.
INSTRUCTIONS NOTE:
If draindown is to be partial, a nitrogen pressure of 0.5 psig will be maintained on the pressurizer.
A partial draindown maintains the water level above the RCS hot leg piping to preclude draining of the steam generators. A special instruction will be prepared'at the time if the uncommon situation occurs.
A.
Flush the UHI system injection lines prior to dismantling as t,
follows:
)
1.
Verify the Power Availability Checklist 87.1 is complete.
2.
~
Verify Valve Checklist 87.1 is complete.
3.
Remove the positive displacement (PD) pump from f
service in accordance with S0I-62.1D.1.
If not
),
inservice, N/A this step.
4.
Close PD pump suction valve 62-508.
)'-
5.
Close PD pump discharge valve:62-520.
'j 6.
Close or verify closed the following valves:
a.
PD pump suction hdr vent 62-511.
b.
PD pump suction hdr vent 62-718.
,,l!
c.
PD pump suction hdr drain 62-514.
d.
PD pump discharge hdr vent 62-719.
l e.
PD pump discharge hdr drain 62-.516.
f.
PD pump discharge hdr pulsation 62-700.
9 PD pump discharge hdr vent 62-517.
0285U/tir
7 l
i.
I[
SON SOI-68.1 Page 36
. /
Revision 38 a
Section C
\\
DRAINING REACTOR COOLANT SYSTEM l
~
i Page 4 of 11-
)
Unit Date j
IV. _ INSTRUCTIONS (continued) 7.
Open PD pump suction valve from refueling water storage tank (RHST)87-533.
t' 8.
Open water accumulator makeup header manual isolation valve 87-526.
L r
1 9.
Open PD pump recirculation isolation valve 87-530.
3 10.
Place HS87-17A in P-auto position (on PNL H-5).
11._
Ensure that the PD pump speed controller, SIC-f 68-339A. is in the manual mode of operation and i
set at minimum speed setting.
j 12.
Open 87-525.
13.
Open 87-527.
14.
_ Open FCV-87-7.
I 1
15._
Open FCV-87-9.
- 6.
Open 87-565.
- 17. _
Adjust the low pressure letdown control valve FCV-62-81 to maintain a reactor coolant pressure t
of 100-200 to the letdown line.psig with letdown through the RHR loop j
I 18._
Start PD charging pump with HS-62-101A.
Place ilS-87-17D to the make-up position.
19.
f.
l 20.
Establish a flow rate of ~ 100tgpm through FCV-87-7 (Read on local FI-87-12) and flush for a minimum of 5 minutes.
21.
Close FCV-87-7.
22.
Open FCV-87-8 and flush line at - 100 gpm for a minimum of 5 minutes:
- 23. _
/
Stop the PD pump with HS-62-101A and verify FCV-87-17 goes closed.
~
0285U/tir
__ _ __ __b t-
'N SQN 1
SOI-68.1 t.
1' Page 37 Revision 38 Section C i
fA.
DRAINING REACTOR COOLANT SYSTEM
'QW Page 5 of 11 Unit Date IV.
INSTRUCTIONS -(continued)
<L 24.
/'
I,,
Place HS-87-170 back to NORMAL position.
25.
/
Close the PD pump' suction valve 87-533 from the e
RHST.
26.
/
Close the PD pump discharge valve 87-526 to the 4
water accumulator.-
.27.
/
Close the PD pump recirculation isolation valve 87-530.
28.
/
Close 87-565, Isolation valve to FCV-81-9.
4 29.
/
Close 87-525.
30.
/
Close 87-527.
31.
/
Close FCV-87-8.
h 32.
/
Close FCV-87-9.
33.
/
Open PD pump discharge valve 62-520.
34.
/
Open PD pump suction valve 62-508.
3 5. _.
Return the positive displacement charging pump to service if needed in accordance with j
S0I-62.1.D.2.
If not, NA this step.
36.
Tag system per MI-1.2 Appendix B tagging instruction.
i 37.
Reset the low pressure letdown control valve FCV-62-81 to depressurize the' reactor coolant system.
8.
Verify open PRT nitrogen supply line isolation valve 68-572.
C.
Close PRT gas analyzer isolation valve 68-574.
D.
Close PRT to vent header valve PCV-68-301.
~
E.
Close primary water to PRT valve 68-303.
02850/tir
r:
? :
SQN-g\\
S0I-68.1 Page 38-g[
Revision 38 L~
Section C A
DRAINING ~ REACTOR COOLANT SYSTEM Page 6 of 11 e-Unit.
)
Date INSTRUCTIONS (continued)
I F.
Verify PRT water level 1 70 percent.
(LI-68-300)
F G.
Place in manual and open pressurizer spray valve 68-340B t
with PIC-68-3408.
H.
Place in manual and open pressurizer spray valve 68-3400 l
With PIC-68-3400.
I.
Verify reactor vessel flange leakoff valve 68-501
closed.
J.
_ Verify reactor vessel flange leakoff valve 68-502
closed.
K.
Open pressurizer relief valve PCV-68-334.
L. _
Open pressurizer relief. valve PCV-68-340A.
M.
Request maintenance support to'have blind flange on 1
68-551 removed and cap plug removed on sight glass piping b
and spoolpiece w/ gaskets installed between the two and/or tygon hose installed.
NOTE:
Sightglass and/or tygon hose should be marked (by elevation) so that level of the H2O in relation
-to pressurizer and RX vessel is easily observed by operator.
If going into mode 6, a camera may j
i-be used to monitor level in sight glass and/or i
tygon hose.
N.
Request maintenance support to attach and secure a hose from (68-573)' PRT vent to (68-594) PZR vent on spray header.
This will allow draining the PZR under a Nr blanket.
O.
Open PRT vent 68-573.
P.
Open PZR vent 68-594.
Q.
Establish communication between the unit control room and the reactor level sight glass and/or tygon hose area.
R.
Perform SI-673, RCS level verification.
(A camera can be used to monitor level.)
Valves located in #4 accumulator room.
0285U/tir
t gi SON-ps
\\
S0I-68.1 l l l ig
\\
Page 39 y
Q Revisi'on 38 J}\\(k q( (. :
'~
t Section C V
q DRAINING REACTOR COOLANT SYSTEM
{,hs\\
Page 7 of 11 Unit Date
- t IV.
INSTRUCTIONS (continued)
S.
Decrease charging below letdown rate to start RCS l
g.
draining.
T.
Verify that letdown is diverted to' the CVCS holdup tank i
as the VCT level increases (LCV-62-118 operating in P-AUT0).
U.
Verify level of pressurizer decreasing as indicated on LI-68-321 (cold calibrated channel).
V.
Flush RCS loop drains clear of crud by performing the following steps:
.l.
To flush Loop 1 a.
Open loop 1 drain valve 68-549.
f b.
Open Loop 1 drain valve 68-550.
b.
c.
Flush for a minimum of three minutes e
d.
/
Close drain valve 68-549.
e.
/
Close drain valve 68-550.
2.
To flush Loop 2 a.
Open Loop 2 drain valve 68-553.
~
b.
Open Loop 2 drain valve 68-554.
i c.
Flush for a minimum of three minutes.
d.
/
Close drain valve 68-553.
1 e.
/
Close drain valve 68-554.
4 0285U/tir umm_--__________.
.(.
\\\\
SQN gi b
Revision 38 I
Section C DRAINING REACTOR COOLANT SYSTEM Page 8 of 11
.. b I
Unit Date-I -
IV.
INSTRUCTIONS (continued) 3.
To' flush Loop 3 e
a.
Open loop 3 drain valve 68-581.
b.
Open Loop 3 drain valve 68-582.
c.
Flush for a minimum of three minutes.
d.
/
Close drain valve 68-581.
e.
/
Close drain valve 68-582.
4.
To flush Loop 4 j
a.
__ Open Loop 4 drain valve 68-557'.
b.
Open Loop 4 drain valve 68-558.
c.
Flush for a minimum of three minutes.
d.
Close drain valve 68-557.
e.
Close drain valve 68-558.
{
W.
As the level falls in the pressurizer, verify the operation of the j
following alarms:
~l
{
1.
Pressurizer level high-low-707. of span increasing
(
for high.
I I
2.
Pressurizer level low heater off and letdown I
secured.
3.
Pressurizer level high backup heaters on reset.
NOTE:
Refer to drawing on Appendix A for steps X and Y.
X.
When level is 57. on PZR cold cal indicator LI-68-321 then place Rx vessel level sightglass in service by:
1.
Verify spoolpiece installed between 68-551 and sightglass piping.
l 2.
Check 68-550 closed (drain to RCDT).
0285U/tir l
I$
Page.41 1V Revision 38
~
Section C DRAINING REACTOR COOLANT SYSTEM.
Page 9 of 11 (4
l Unit Date 1
IV.
INSTRUCTIONS. (r.ontinued) 3.
Check valve V2 closed (spoolplece drain),
j 4.
Open 68-549.
5.
Open 68-551.
-6.
Open valve V4 (upper isolation on sight glass).
7.
Slowly open valve V3 (lower isolation on sight glass).
3 NOTE:
Hake visual checks to ensure no leaks in s.ight glass, piping, tygon hose or water coming out of either due to overflow. Verify no kinks, air bubbles or flow restrictions in tygon hose.
L Y.
After completion of step X, if it is desired to place the tygon hose in service in conjunction with the Rx vessel level sight
~
glass, perform the following.
If not, N/A this step.
1.
Request maintenance support to have blind flange removed from and Chicago fitting installed on 68-577 (PRZ vent) and have one end of tygon hose connected to 68-577 and the other end connected to spoolplece downstream of valve V-2.
~
2.
Verify tygon hose connected to 68-577 and spoolpiece downstream of valve V-2.
,-t 3.
Open 68-577.
4.
Open v-2 on spoolpiece.
Z.
Reestablish lowering of PZR level and establish communications between the unit control room and the reactor level sightglass or tygon hose area. A camera can be used to monitor levels.
AA.
Perform SI-673, RCS level verification.
0285U/tir
Page 42 3 1 13 Revision 38 Section C-Q-
DRAINING REACTOR COOLANT SYSTEM 3
h Page 10 of 11 Unit Date IV.
INSTRUCTIONS (continued)
BB. When the reactor vessel level is < El. 710', the reactor coolant system can be depressurized using the following steps.
l.
Request maintenance support to remove blind flange and install hosing to connect 68-597 to-venting manifold.
- 2.
Verify closed FCV-68-305A, N, supply to PRT.
3.
Verify service air aligned to venting manifold and manifold aligned to purge air intake FCV-30-52.
4.
Ensure 68-597 is properly aligned to venting manifold.
5.
Verify purge exhaust system is in-service and
.l FCV-30-52 is open.
s.
6.
Open vent manifold valve aligned to service air.
7.
Open vent manifold valve aligned to FCV-30-52.
8.
Open vent manifold valve aligned to 68-597.
9.
Open reactor vessel vent valve 68-597.
i f
10.
Throttle open service air supply valve to vent manifold.
11.
When venting is completed:
~
a.
/
Close 68-597 b.
/
Close service air supply to vent manifold.
c.
/
Close all valves on venting manifold.
j
\\
l 0285U/tir
n
-\\\\
1 P
SQN i
Ag SOI-68.1 I
~.
-Page 43-Revision 38
\\.
Section C
,,,Q\\
ORAINING REACTOR COOLANT SYSTEM
~
, 93 4
l Page 11 of 11 Unit Date
.IV.
INSTRUCTIONS (continued)
CC.
As water level approaches the top of the RCS hot leg piping (~ el. 696' 2.5"), decrease CVCS letdown flow to slow RCS draindown rate.
NOTE:
When the water. level decreases to el.~696.0, as
(
shown by the level indicator, the steam generators will begin to drain.
t NOTE:
As the water. level is lowered below the nozzles,.
the water in the steam generator tube bundles j
will drain.
This water will fill the vessel above the nozzles and terminate the steam gener' tor tube bundle draining until the water in s
a the vessel drains below the nozzle again.
This draining down of the' vessel below the nozzle and then refilling will continue until all the water y
in the steam generator tube bundles is drained.
I J'
CAUTION:
Do not drain below elevation 695'6" with the RHR pumps running.
The final drained level should be between elevation 695'6" and elevation 696.0.
3 1
NOTE:
If RHR pump suction is lost refer to A0I-14, Section G, for placing RHR back in service.
0D.
When desired level is reached, stop RCS draining by balancing charging and letdown flow.
g '.
I
.. f 1-0285U/tir Wmm_-m____m______ _. _ -
'b+.
.~,
~~~
.d
^'
' REACTOR COOLING SYSTEM :
i E*
SIGHT GLASS SQN1 i:-
f q
SOIi68.1C.*
Appendix A'.I
.a w Page'623 Revision ~ 38 ' ' /
4 6
_t-l-
-L y_
FT
-ELE 718-1 1
- f. (a 7C5'-9".)
V-4 L,
. -].
)
a-E-- '
~:-
,o SIGHT glass '
g;[,.
'C 5
t
( = 693 '-6"). V-3 e-- VENT.
i 3
L.
1 o >
1 FAN : R00.I' "
- AZ O' ELE 693 Ns N N_
p r------ RACE' DAY s _....
INSIDE POLAR CRANE WALL RCS.
CROSS UNDER LCCP I J
i
.g 1
a
-)
9 g
t 68-549 68-550
.J.
.Y j
l
<-l 1
g
't' i%3--
X-1 CCUPLING FCR 68-551
,y 2 TYGCN HOSE s,. -.,..
- % w 2,......,,
~
l I
1 1
i
[
l I
ATTACHMENT 3 TO ENCLOSURE 1 1
1
.[
t 1
i l
1 1
(
)
I l
1 i
-_ _____ ________ _ U t