Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20244B759 + (ML20244B759)
- ML20244B761 + (ML20244B761)
- 05000425/LER-1989-020, :on 890512,loss of Power to Nuclear Instrumentation Channel N44 Occurred During Surveillance Test,Causing Reactor Trip.Cause for Loss of Power Could Not Be Determined.Ler Will Be Required Reading + (ML20244B762)
- ML20244B763 + (ML20244B763)
- ML20244B764 + (ML20244B764)
- ML20244B765 + (ML20244B765)
- ML20244B766 + (ML20244B766)
- ST-HL-AE-3042, Forwards Description of Change in Plant Initial Test Program Listed in FSAR Section 14.2 + (ML20244B769)
- 05000313/LER-1989-006-01, :on 890209,analytical & Procedural Inadequacies Noted Re Use of Hpis in Piggyback Flowpath Alignment.Caused by Deficient ECCS Analysis.Affected Portions of Piggyback Piping Reanalyzed & Mods Implemented + (ML20244B770)
- ML20244B771 + (ML20244B771)
- ML20244B772 + (ML20244B772)
- IA-89-126, Partially Withheld Request for Hearing by Atlas Corp on Denial of Application to Renew Source Matl License + (ML20244B777)
- ML20244B777 + (ML20244B777)
- ML20244B782 + (ML20244B782)
- ML20244B785 + (ML20244B785)
- ML20244B787 + (ML20244B787)
- IR 05000285/1989008 + (ML20244B788)
- ELV-00594, Provides Addl Info Re Proposed Changes to QA Program,Per NRC Request.Program of Audits Required by Tech Specs & FSAR Not Being Changed by Reduction in Personnel + (ML20244B789)
- ML20244B791 + (ML20244B791)
- ML20244B792 + (ML20244B792)
- ELV-00599, Forwards Implementation Rept on Reactor Vessel Level Instrumentation Sys,Per NUREG-0737,Item II.F.2 & Sser 1 + (ML20244B794)
- ML20244B796 + (ML20244B796)
- 05000414/LER-1989-008-01, :on 890509,hourly Fire Watches Not Performed Where Required on Inoperable Mechanical Penetration Area. Caused by Inappropriate Action.Penetration Resealed & Use of Approved Procedures Emphasized to Personnel + (ML20244B797)
- ML20244B799 + (ML20244B799)
- 3F0689-03, Forwards Revised Response to Insp Rept 50-302/87-17. Corrective Action:Mispositioned Valve Correctly Positioned as Required by Operating Procedure + (ML20244B801)
- ML20244B802 + (ML20244B802)
- ML20244B803 + (ML20244B803)
- ML20244B804 + (ML20244B804)
- ML20244B806 + (ML20244B806)
- ML20244B808 + (ML20244B808)
- ML20244B810 + (ML20244B810)
- ML20244B812 + (ML20244B812)
- ML20244B815 + (ML20244B815)
- ML20244B817 + (ML20244B817)
- ML20244B818 + (ML20244B818)
- ML20244B819 + (ML20244B819)
- ML20244B821 + (ML20244B821)
- ML20244B822 + (ML20244B822)
- ML20244B824 + (ML20244B824)
- ML20244B826 + (ML20244B826)
- 05000483/LER-1988-013, :on 881029,discovered That Raychem heat-shrink Terminations for Steam Generator C Not Installed in Environ Qualification Configuration.Caused by Incomplete Installation Procedures & Inadequate Training + (ML20244B828)
- 05000277/LER-1989-010-01, :on 890514,50% Control Rod Density Exceeded W/O Demonstrating Operability of Rod Sequence Control Sys.Caused by Personnel Error.Shift Manager Counseled & Control Rod Pull Sheet Revised + (ML20244B829)
- PNO-I-89-042, on 890601,instrumentation & Control Technician Shirt Contaminated w/Cl-36 While Handling Discarded Radiation Protector.Caused by Leaking Check Source.Skin Dose Estimate for Affected Individual Surveyed + (ML20244B832)
- ML20244B833 + (ML20244B833)
- ML20244B834 + (ML20244B834)
- ML20244B835 + (ML20244B835)
- COM-046, Forwards Requesting Withdrawal of Export License Application XCOM-0460 + (ML20244B837)
- ML20244B839 + (ML20244B839)
- U-601400, Forwards Util Response to NRC Bulletin 88-003, Inadequate Latch Engagement in Hfa Type Latching Relays Mfg by Ge. All latching-type Hfa Relays Installed,Or in Stock at Facility Are That Used in Class 1E Applications + (ML20244B840)
- ML20244B841 + (ML20244B841)
- ML20244B843 + (ML20244B843)