Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 07200001/1989001 + (ML20244B737)
- ML20244B738 + (ML20244B738)
- 3F0689-06, Responds to Violations Noted in Insp Rept 50-302/89-08. Corrective Actions:Setpoints for Radiation Monitor Release Reset to Proper Values & Surveillance Conducted to Determine Generic Conditions Contributing to Setpoint Errors + (ML20244B740)
- ML20244B742 + (ML20244B742)
- ML20244B746 + (ML20244B746)
- ML20244B748 + (ML20244B748)
- IR 05000317/1989013 + (ML20244B749)
- ML20244B751 + (ML20244B751)
- ML20244B753 + (ML20244B753)
- ML20244B755 + (ML20244B755)
- ML20244B756 + (ML20244B756)
- RBG-31029, Gulf States Utils 1988 Annual Rept + (ML20244B757)
- ML20244B759 + (ML20244B759)
- ML20244B761 + (ML20244B761)
- 05000425/LER-1989-020, :on 890512,loss of Power to Nuclear Instrumentation Channel N44 Occurred During Surveillance Test,Causing Reactor Trip.Cause for Loss of Power Could Not Be Determined.Ler Will Be Required Reading + (ML20244B762)
- ML20244B763 + (ML20244B763)
- ML20244B764 + (ML20244B764)
- ML20244B765 + (ML20244B765)
- ML20244B766 + (ML20244B766)
- ST-HL-AE-3042, Forwards Description of Change in Plant Initial Test Program Listed in FSAR Section 14.2 + (ML20244B769)
- 05000313/LER-1989-006-01, :on 890209,analytical & Procedural Inadequacies Noted Re Use of Hpis in Piggyback Flowpath Alignment.Caused by Deficient ECCS Analysis.Affected Portions of Piggyback Piping Reanalyzed & Mods Implemented + (ML20244B770)
- ML20244B771 + (ML20244B771)
- ML20244B772 + (ML20244B772)
- IA-89-126, Partially Withheld Request for Hearing by Atlas Corp on Denial of Application to Renew Source Matl License + (ML20244B777)
- ML20244B777 + (ML20244B777)
- ML20244B782 + (ML20244B782)
- ML20244B785 + (ML20244B785)
- ML20244B787 + (ML20244B787)
- IR 05000285/1989008 + (ML20244B788)
- ELV-00594, Provides Addl Info Re Proposed Changes to QA Program,Per NRC Request.Program of Audits Required by Tech Specs & FSAR Not Being Changed by Reduction in Personnel + (ML20244B789)
- ML20244B791 + (ML20244B791)
- ML20244B792 + (ML20244B792)
- ELV-00599, Forwards Implementation Rept on Reactor Vessel Level Instrumentation Sys,Per NUREG-0737,Item II.F.2 & Sser 1 + (ML20244B794)
- ML20244B796 + (ML20244B796)
- 05000414/LER-1989-008-01, :on 890509,hourly Fire Watches Not Performed Where Required on Inoperable Mechanical Penetration Area. Caused by Inappropriate Action.Penetration Resealed & Use of Approved Procedures Emphasized to Personnel + (ML20244B797)
- ML20244B799 + (ML20244B799)
- 3F0689-03, Forwards Revised Response to Insp Rept 50-302/87-17. Corrective Action:Mispositioned Valve Correctly Positioned as Required by Operating Procedure + (ML20244B801)
- ML20244B802 + (ML20244B802)
- ML20244B803 + (ML20244B803)
- ML20244B804 + (ML20244B804)
- ML20244B806 + (ML20244B806)
- ML20244B808 + (ML20244B808)
- ML20244B810 + (ML20244B810)
- ML20244B812 + (ML20244B812)
- ML20244B815 + (ML20244B815)
- ML20244B817 + (ML20244B817)
- ML20244B818 + (ML20244B818)
- ML20244B819 + (ML20244B819)
- ML20244B821 + (ML20244B821)
- ML20244B822 + (ML20244B822)
- ML20244B824 + (ML20244B824)