Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20236R944 + (ML20236R944)
- ML20236R945 + (ML20236R945)
- ML20236R949 + (ML20236R949)
- ML20236R950 + (ML20236R950)
- ML20236R953 + (ML20236R953)
- ML20236R954 + (ML20236R954)
- NLS8700601, Forwards Addl Info Re Proposed Standby Liquid Control Sys Mod to Comply w/10CFR50.62 & Attachment a to Nedc 87-153, Standby Liquid Control Sys Control Capacity Equivalency Rept, Dtd 870721.Final Configuration Will Be as Indicated + (ML20236R955)
- ML20236R957 + (ML20236R957)
- PNO-IV-98-032, on 980721,Troxler Moisture Density Gauge Model 3430,Serial 2845,owned by Earth Consultants,Inc Bellevue,Wa Hit by Bulldozer at Temporary Job Site.Gauge Contains 8 Mci of Cs-137 & 40 Mci of Am-241/Be.Region IV Notified of Event + (ML20236R960)
- IR 05000498/1987068 + (ML20236R963)
- ML20236R965 + (ML20236R965)
- ML20236R966 + (ML20236R966)
- A06850, Forwards Addl Info Re Miscellaneous Amends/Search Requirements for Amend to Physical Security Plan,Per NRC 871005 Request.Encl Withheld (Ref 10CFR2.790) + (ML20236R967)
- ML20236R968 + (ML20236R968)
- ML20236R969 + (ML20236R969)
- ML20236R970 + (ML20236R970)
- ML20236R971 + (ML20236R971)
- ML20236R972 + (ML20236R972)
- ML20236R973 + (ML20236R973)
- ML20236R976 + (ML20236R976)
- U-601060, Forwards Response to NRC 871110 Request for Addl Info Re 870610 Lawrenceville,Il Earthquake + (ML20236R977)
- 05000456/LER-1987-054, :on 871021,27 & 29,calorimetric Calculations Performed Outside Time Allowed by Tech Specs Due to Inconstant Reactor Power.Caused by Booster Pump Strainer Clogging.Addl Guidance & Controls Initiated + (ML20236R979)
- ML20236R981 + (ML20236R981)
- ML20236R982 + (ML20236R982)
- ML20236R983 + (ML20236R983)
- ML20236R985 + (ML20236R985)
- ML20236R986 + (ML20236R986)
- TXX-6912, Forwards Description of Amend 65 to Fsar.Amend,Transmitted Under Separate Cover,Includes Listed Revs,Including Fire Protection,Electrical Separation,Power Sys,Testing,Util Organization & Electrical Grounding + (ML20236R987)
- TXX-6947, Interim Deficiency Rept CP-86-48 Re Adequacy of Nonconformance Dispositions.Initially Reported on 860616. Evaluation of Impact on Plant Safety Continuing.Next Rept Will Be Submitted by 880217 + (ML20236R990)
- ML20236R991 + (ML20236R991)
- ML20236R996 + (ML20236R996)
- ML20236R997 + (ML20236R997)
- ML20236R999 + (ML20236R999)
- ML20236S002 + (ML20236S002)
- ML20236S003 + (ML20236S003)
- ML20236S006 + (ML20236S006)
- ML20236S007 + (ML20236S007)
- ML20236S009 + (ML20236S009)
- ML20236S010 + (ML20236S010)
- ML20236S011 + (ML20236S011)
- TXX-6969, Interim Deficiency Rept CP-86-82 Re Welds Used to Splice Channel Sections end-to-end Forming Posts for Cable Tray Hangers.Initially Reported on 870106.Corrective Actions Will Be Rescheduled.Next Rept Will Be Submitted by 880129 + (ML20236S012)
- ML20236S014 + (ML20236S014)
- ML20236S016 + (ML20236S016)
- 05000344/LER-1987-030, :on 871021,discovered That Component Cooling Water (CCW) Flow to RHR a HX Was Only 4,460 Gpm.Caused by Procedure Inadequacy.Rhr a HX CCW Outlet Valve Adjusted to Provide 5,100 Gpm + (ML20236S017)
- ML20236S018 + (ML20236S018)
- ML20236S019 + (ML20236S019)
- ML20236S020 + (ML20236S020)
- ML20236S021 + (ML20236S021)
- ML20236S023 + (ML20236S023)
- ML20236S024 + (ML20236S024)
- PNO-IV-98-033, on 980721,notified NRC of Incident Involving Exposure of Contractor Personnel.Contractors Apparently Removed Gauge from Mounting & Placed It on Plant Floor. RSO Estimated Doses to Contractors as 116 Mrems as Follows + (ML20236S025)