Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20236G749 + (ML20236G749)
- ML20236G751 + (ML20236G751)
- U-600994, Discusses Possible Implications Resulting from Falsification of QC Records at Plant.Conduit & Raceway Electrical Travelers on Which Individual Worked Identified & Reinspected.No Rejectable Attributes Noted + (ML20236G752)
- 05000266/LER-1998-018, :on 980528,missed Surveillances for App J Testing of Containment Electrical Penetrations Occurred. Caused by Valve Discovered on Electrical Penetrations Inside Containment.Electrical Penetration Vent Valves Modified + (ML20236G753)
- PY-CEI-NRR-0684, Application for Amend to License NPF-58,changing Tech Spec Section 4.8.1.2.e.1 to Agree W/Rev 2 of App II of Tdi Diesel Generators Owners Group Design,Review & Quality Revalidation Rept.Fee Paid + (ML20236G755)
- IR 05000298/1987017 + (ML20236G757)
- ML20236G758 + (ML20236G758)
- AECM-87-0131, Rev 6 to Operational QA Manual (Oqam) + (ML20236G759)
- RC-98-0127, Requests Approval to Use Alternative Rules of Code Case N-498-1 for Periodic Hydrostatic Testing of ASME Class 3 Piping Systems.Approval Requested by 990201 + (ML20236G763)
- 05000413/LER-1998-007, Forwards LER 98-007-00,concerning Missed TS Surveillance on Containment Penetration Testing Due to Literal Compliance Issue + (ML20236G764)
- 1CAN108704, Application for Amend to License DPR-51,extending Term of License to 40 Yrs.Fee Paid + (ML20236G765)
- ML20236G767 + (ML20236G767)
- ML20236G771 + (ML20236G771)
- ML20236G774 + (ML20236G774)
- ST-HL-AE-2397, Forwards Description of Change in Initial Test Program,Per FSAR Section 14.Description Addresses Deletion of Reactor Upper Internals & Reactor Head Installation as Prerequisites to Moveable Incore Detector Sys Checkout Procedure + (ML20236G776)
- ML20236G778 + (ML20236G778)
- ML20236G779 + (ML20236G779)
- 05000413/LER-1998-007-01, :on 980608,missed TS Surveillance on Containment Penetration Testing Due to Literal Compliance Issue.Caused by Inappropriate Implementation of Staggered Test Requirement.Affected Penetrations Successfully Tested + (ML20236G782)
- B17335, Submits Summary of Changes to & Errors Discovered in ECCS Evaluation Models or Applications of Models for Mnps,Unit 2, Per 10CFR50.46(a)(3)(ii) + (ML20236G789)
- 05000344/LER-1987-017, :on 870417,positive Pressure of 0.125 Inches of Water Could Not Be Maintained.Caused by Air Leakage Through Cable Penetrations in Control Room Floor.Operating Procedures Revised + (ML20236G790)
- ML20236G791 + (ML20236G791)
- U-603037, Provides Response to Violations Noted in Insp Rept 50-461/98-10.Corrective Actions:All Individuals Involved W/Incident Were Counseled by Supervisor - Radiological Operations on Expectations for Job Performance + (ML20236G793)
- TXX-6628, Advises That Util Will Not Adopt Rev 15 to Code Case N-71. Util Will Continue to Use Criteria of Rev 9 in Design of Plant Pipe Supports Fabricated from A500 Grade B (cold-formed) Structural Tube Shape + (ML20236G794)
- HBL-87-047, Forwards Rev 3 to Custodial Safstor Facility QA Plan.Changes Include Clarification of Sections Re Packaging & Transportation,Fire Rating of Storage Containers,Audit Frequency & Ref to Reg Guide + (ML20236G797)
- TXX-6882, Interim Deficiency Rept CP-87-52 Re Apparent Inadequacy in Vendor Info Used as Design Input Which Could Result in Unsatisfactory Class 1E Battery Capabilities.Initially Reported on 870729.Next Rept Will Be Submitted by 880113 + (ML20236G801)
- ML20236G806 + (ML20236G806)
- ML20236G808 + (ML20236G808)
- ML20236G810 + (ML20236G810)
- ML20236G811 + (ML20236G811)
- ML20236G812 + (ML20236G812)
- ML20236G814 + (ML20236G814)
- ML20236G816 + (ML20236G816)
- 3F0798-02, Provides Notification That Two Related NRC Commitments Are Being Combined & Revised & That Due Date for New Commitment Is Being Extended,In Response to Violations Noted in Insp Rept 50-302/97-12 + (ML20236G817)
- A98034, 1997 Annual 10CFR50.59 Summary Rept + (ML20236G818)
- ML20236G819 + (ML20236G819)
- ML20236G822 + (ML20236G822)
- ML20236G823 + (ML20236G823)
- ML20236G824 + (ML20236G824)
- ML20236G826 + (ML20236G826)
- ML20236G829 + (ML20236G829)
- ML20236G830 + (ML20236G830)
- ML20236G832 + (ML20236G832)
- IA-87-740, Final Response to FOIA Request for SECY-81-576.Rept Available in PDR + (ML20236G833)
- ML20236G833 + (ML20236G833)
- ML20236G834 + (ML20236G834)
- BECO-87-123, Forwards Suppl to Tech Spec 4.3.C.1, Scram Insertion Times, Per NRC Request.Suppl Modifies Util 851115 Proposed Change by Requiring Operable Control Rods to Be Subjected to Scram Time Test After Reactor Shutdown + (ML20236G835)
- ML20236G838 + (ML20236G838)
- ML20236G841 + (ML20236G841)
- ML20236G843 + (ML20236G843)
- ML20236G844 + (ML20236G844)