Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235V893 + (ML20235V893)
- ML20235V895 + (ML20235V895)
- ML20235V901 + (ML20235V901)
- ML20235V903 + (ML20235V903)
- ML20235V904 + (ML20235V904)
- TXX-6793, Interim Deficiency Rept CP-87-87 Re Chemical Vol & Control Sys Relief Valve Piping.Initially Reported on 870903. Confirmation of Westinghouse Rept Will Be Completed Concurrently W/Review of Valve 1-8117.Next Rept by 871130 + (ML20235V907)
- ML20235V910 + (ML20235V910)
- ML20235V913 + (ML20235V913)
- ML20235V914 + (ML20235V914)
- ML20235V915 + (ML20235V915)
- ML20235V917 + (ML20235V917)
- ML20235V925 + (ML20235V925)
- ML20235V930 + (ML20235V930)
- ML20235V933 + (ML20235V933)
- ML20235V934 + (ML20235V934)
- TXX-6835, Interim Deficiency Rept CP-86-04 Re Placement of Richmond Inserts in Proximity of Loaded Embedded Plates.Initially Reported on 870213.Implementation of Corrective Actions Continuing.Next Rept Will Be Submitted by 871204 + (ML20235V935)
- ML20235V936 + (ML20235V936)
- ML20235V938 + (ML20235V938)
- NUREG-1184, Submits Comments on Isap,Discussed During 327th Meeting of ACRS on 870709-11.Recommends Extension of Isap Process to Other Plants.Listed Points Need Further Consideration + (ML20235V940)
- ML20235V943 + (ML20235V943)
- ML20235V944 + (ML20235V944)
- ML20235V945 + (ML20235V945)
- ML20235V949 + (ML20235V949)
- ML20235V953 + (ML20235V953)
- ML20235V957 + (ML20235V957)
- ML20235V960 + (ML20235V960)
- ML20235V961 + (ML20235V961)
- ML20235V965 + (ML20235V965)
- ML20235V967 + (ML20235V967)
- RBG-26764, Forwards Addenda Pages to Annual Radiological Environ Operating Repts, for Oct-Dec 1985 & Jan-Dec 1986.Data Inadvertently Omitted from Original Submittals & Does Not Affect Plant Operations + (ML20235V970)
- TXX-6796, Interim Deficiency Rept CP-87-88 Re Certian 6.9 Kv Switchgear Control Circuits Which Appear to Produce Excessive Voltage Drop.Initially Reported on 870903.Addl Calculations Being Performed.Next Rept by 880115 + (ML20235V976)
- ML20235V979 + (ML20235V979)
- ML20235V981 + (ML20235V981)
- 05000456/LER-1987-029, :on 870617,discovered That Instrumentation Slave Relay Surveillance Pressure Interlock Missed on 861215.Caused by Procedural Deficiency.Procedure to Be Revised + (ML20235V984)
- ML20235V985 + (ML20235V985)
- ML20235V989 + (ML20235V989)
- ML20235V994 + (ML20235V994)
- ML20235V998 + (ML20235V998)
- ML20235W002 + (ML20235W002)
- ML20235W003 + (ML20235W003)
- ML20235W004 + (ML20235W004)
- TXX-6820, Interim Deficiency Rept CP-86-38 Re Failure of Project Procedures to Adequately Address Installation & Insp Criteria for Cable Runs Used as Device Pigtail Extensions. Initially Reported on 870527.Next Rept Expected by 871216 + (ML20235W005)
- TXX-6568, Interim Deficiency Rept CP-86-82 Re Welds Used to Splice Cable Tray Hanger (Cth) Channel Sections.Initially Reported on 870106.As-built Verification Program for Cth Installations Complete.Next Rept to Be Submitted by 871120 + (ML20235W006)
- ML20235W007 + (ML20235W007)
- NUREG-1002, Forwards Sser 4 (NUREG-1002) Re Operation of Facility,For Use.Rept Being Placed in Pdr.W/O Encl + (ML20235W008)
- ML20235W009 + (ML20235W009)
- ML20235W010 + (ML20235W010)
- ML20235W012 + (ML20235W012)
- ML20235W013 + (ML20235W013)
- ML20235W015 + (ML20235W015)
- ML20235W016 + (ML20235W016)