Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235U695 + (ML20235U695)
- ML20235U697 + (ML20235U697)
- ML20235U698 + (ML20235U698)
- IR 05000289/1986005 + (ML20235U699)
- ML20235U700 + (ML20235U700)
- ML20235U701 + (ML20235U701)
- ML20235U702 + (ML20235U702)
- ML20235U704 + (ML20235U704)
- ML20235U705 + (ML20235U705)
- 05000321/LER-1989-002-01, :on 890205,4 H Grab Sampling & Analyses Not Performed,Per Tech Spec 3.6.G.2.A When Particulate Fission Product Monitor Inoperable.Caused by Personnel Error. Procedures Upgraded & Personnel Counseled + (ML20235U706)
- ML20235U708 + (ML20235U708)
- A07742, Responds to NRC Bulletin 88-007,Suppl 1 Power Oscillations in Bwrs. Unit 1 Completed Addl Procedure Revs Re GE Interim Stability Recommendations Effective on 890201 & Stability Boundaries Will Be Reevaluated + (ML20235U709)
- ML20235U710 + (ML20235U710)
- ML20235U712 + (ML20235U712)
- IR 05000289/1986012 + (ML20235U713)
- ML20235U715 + (ML20235U715)
- ML20235U716 + (ML20235U716)
- ML20235U717 + (ML20235U717)
- IR 05000160/1989001 + (ML20235U718)
- IR 05000289/1986014 + (ML20235U719)
- ML20235U720 + (ML20235U720)
- ML20235U722 + (ML20235U722)
- 05000317/LER-1989-001-01, :on 890208,coordinator Discovered That Since 880825 Three Startups Occurred W/O Operability of Manual Trip Channels Due to Missing Page from Procedure STP-0-6-1. Caused by Lack of Administrative Steps + (ML20235U723)
- ML20235U724 + (ML20235U724)
- ML20235U725 + (ML20235U725)
- ML20235U726 + (ML20235U726)
- 05000312/LER-1987-042, :on 870912,technician Detected Electrical Problems W/Amphenol Blue Ribbon Connectors.Caused by Coating of Residue from Solder Flux,Organic Matls & Plasticizers. Nonconforming Rept Procedure Revised + (ML20235U728)
- ML20235U729 + (ML20235U729)
- IR 05000313/1988026 + (ML20235U731)
- IR 05000289/1987006 + (ML20235U732)
- ML20235U733 + (ML20235U733)
- IR 05000245/1987020 + (ML20235U735)
- ML20235U736 + (ML20235U736)
- ML20235U738 + (ML20235U738)
- 05000482/LER-1987-015, :on 870412,control Room Ventilation Isolation Signal Occurred Due to High Chlorine Level in Outside Air Makeup.Caused by Bunching Up of Paper Tape Used as Chlorine Detector.Paper Tape Replaced + (ML20235U740)
- 0CAN018905, Responds to Violations Noted in Insp Repts 50-313/88-26 & 50-368/88-26.Corrective Actions:Procedure Rev Effort Initiated in Mar 1988 to Consolidate Procedures Associated W/Design Control Process & Will Address Reorganization + (ML20235U741)
- IR 05000289/1987009 + (ML20235U742)
- ML20235U743 + (ML20235U743)
- ML20235U744 + (ML20235U744)
- ML20235U745 + (ML20235U745)
- ML20235U746 + (ML20235U746)
- 3F1087-10, Monthly Operating Rept for Sept 1987 + (ML20235U747)
- ML20235U748 + (ML20235U748)
- RBG-26763, Forwards Proposed Draft Outline for Hydrogen Control Rept, in Response to NRC 870909 Request.Util Revising Schedule for Submittal of plant-specific Hydrogen Control Analysis to 6 Months Following Issuance of SER on Topical Rept HGN-112 + (ML20235U750)
- 05000313/LER-1988-009, :on 880922,three Inoperable Snubbers Discovered on safety-related Piping Sys.One Snubber Failed Due to Spec of Undersized Snubber & Other Two Found W/Inadequate Travel Remaining for Thermal Growth + (ML20235U751)
- ML20235U752 + (ML20235U752)
- ML20235U753 + (ML20235U753)
- ML20235U754 + (ML20235U754)
- ML20235U756 + (ML20235U756)
- ML20235U757 + (ML20235U757)
- 05000369/LER-1987-011-02, :on 870610,leak Rate Testing of Containment Electrical Penetrations Not Performed.Caused by Inadequate Administrative Controls Surveillance Testing.Leak Rate Test Procedures Corrected + (ML20235U759)