- RA-98-021, Submits Addl Info & Clarification in Response to Questions Raised in Re Decommissioning Plan Submitted on 970731.Attachment 1 Provides Answers to Specific Questions in & Attachment 2 Provides Environ Rept + (ML20217K679)
- ML20217K681 + (ML20217K681)
- ML20217K683 + (ML20217K683)
- LR-N980149, Comment on Proposed Rule 10CFR50 Re Industry Codes & Stds. Comments Address Use of Engineering Judgment,Limitations on Use of Later ASME III Code Editions for Weld Leg Dimensions & Seismic Analysis + (ML20217K684)
- ML20217K685 + (ML20217K685)
- ML20217K687 + (ML20217K687)
- ML20217K688 + (ML20217K688)
- ML20217K695 + (ML20217K695)
- ML20217K696 + (ML20217K696)
- ML20217K699 + (ML20217K699)
- ML20217K700 + (ML20217K700)
- ML20217K701 + (ML20217K701)
- ML20217K702 + (ML20217K702)
- ML20217K706 + (ML20217K706)
- 05000277/LER-1997-006-02, :on 970923,DG Auto Start During 4-kV Relay Testing Occurred.Caused by Personnel Error.Need for Exercising Caution When Removing or Installing Relay Cover Was Discussed W/I&C Technicians + (ML20217K708)
- ML20217K709 + (ML20217K709)
- ML20217K711 + (ML20217K711)
- ML20217K712 + (ML20217K712)
- ML20217K713 + (ML20217K713)
- 05000440/LER-1997-012, :on 970923,reactor Protection Sys Actuation Occurred.Caused by Insufficient Procedural Guidance.Rps Sys Operating Instruction Revised to Include Table/Checklist of Reactor Mode Switch Positions & Effects on RPS Signals + (ML20217K716)
- ML20217K717 + (ML20217K717)
- ML20217K718 + (ML20217K718)
- ML20217K719 + (ML20217K719)
- ML20217K724 + (ML20217K724)
- ML20217K725 + (ML20217K725)
- 05000266/LER-1996-016, :on 961030,discovered as-found Lift Pressure for Unit 2 Pressurizer Safety Valve 2RC-434 Exceeded Max Lift Pressure Allowed by ASME Code.Caused by Use of Ambient Temp in Test Lab.Set Valve at More Appropriate Ambient Temp + (ML20217K726)
- ML20217K732 + (ML20217K732)
- SVP-97-242, Forwards Updated FSAR to Quad Cities Nuclear Power Station,Units 1 & 2 & Detailed Change Log Which Identifies & Explains All Changes + (ML20217K733)
- 05000336/LER-1999-012, :on 990917,unrecoverable CEA Misalignment Entry Into TS 3.0.3 Was Noted.Caused by Grounded Coil Wire for Lower Gripper Assembly.Leads Leading to Lower Gripper Coil Were Insulated + (ML20217K734)
- ML20217K736 + (ML20217K736)
- ML20217K738 + (ML20217K738)
- ML20217K741 + (ML20217K741)
- ML20217K742 + (ML20217K742)
- ML20217K743 + (ML20217K743)
- ML20217K744 + (ML20217K744)
- ML20217K746 + (ML20217K746)
- ML20217K747 + (ML20217K747)
- ML20217K748 + (ML20217K748)
- ML20217K749 + (ML20217K749)
- ML20217K751 + (ML20217K751)
- ML20217K752 + (ML20217K752)
- ML20217K753 + (ML20217K753)
- ML20217K754 + (ML20217K754)
- ML20217K756 + (ML20217K756)
- ML20217K757 + (ML20217K757)
- ML20217K758 + (ML20217K758)
- 05000245/LER-1997-036, Forwards LER 97-036-00,which Documents Event That Occurred at Mnps,Unit 1 on 970929.Commitment Made within Ltr,Listed + (ML20217K760)
- ML20217K762 + (ML20217K762)
- ML20217K763 + (ML20217K763)
- ML20217K764 + (ML20217K764)
- ML20217K765 + (ML20217K765)