Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PY-CEI-NRR-2435, Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect + (ML20217F182)
- ML20217F184 + (ML20217F184)
- ML20217F185 + (ML20217F185)
- ML20217F186 + (ML20217F186)
- ML20217F188 + (ML20217F188)
- ML20217F189 + (ML20217F189)
- ML20217F191 + (ML20217F191)
- ML20217F192 + (ML20217F192)
- ML20217F193 + (ML20217F193)
- ML20217F194 + (ML20217F194)
- ML20217F195 + (ML20217F195)
- ML20217F196 + (ML20217F196)
- IR 05000482/1997014 + (ML20217F197)
- ML20217F198 + (ML20217F198)
- ML20217F199 + (ML20217F199)
- BSEP-99-0161, Submits Response to NRC RAI Re Relief Request VRR-03.VRR-03 Requested Relief from full-stroke Open Exercise Requirements for Supply Check Valves to air-operated Valves 1(2)-RNA-V313,1(2)-RNA-V314,1(2)-RNA-V350 & 1(2)-RNA-V351 + (ML20217F200)
- ML20217F202 + (ML20217F202)
- B17103, Provides Response to Violations Noted in Insp Rept 50-336/97-208.Corrective Actions:Operations Personnel Were Briefed on Maintaining Compliance W/Qa Eight for Temporary Equipment in CR + (ML20217F203)
- ML20217F204 + (ML20217F204)
- ML20217F207 + (ML20217F207)
- IR 05000483/1998002 + (ML20217F208)
- ML20217F209 + (ML20217F209)
- ML20217F211 + (ML20217F211)
- ML20217F212 + (ML20217F212)
- ML20217F215 + (ML20217F215)
- ML20217F216 + (ML20217F216)
- ML20217F219 + (ML20217F219)
- 05000423/LER-1997-034-01, Forwards LER 97-034-01,documenting Condition That Was Determined at Millstone,Unit 3 on 970918.Attachment 1 to Ltr Contains Commitments in Response to Event + (ML20217F220)
- ML20217F221 + (ML20217F221)
- ML20217F225 + (ML20217F225)
- ML20217F226 + (ML20217F226)
- ML20217F229 + (ML20217F229)
- NOC-AE-000674, Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule + (ML20217F230)
- 05000423/LER-1997-034, LER 970934-01:on 970918,RHR Pump Suction Relief Valve Setpoint Not IAW TS Was Determined.Caused by Insufficient Configuration Control.Declared B Train RHR Valve Inoperable, Recalibrated to Correct Setpoint & Declared Operable + (ML20217F232)
- ML20217F235 + (ML20217F235)
- ML20217F236 + (ML20217F236)
- ML20217F238 + (ML20217F238)
- ML20217F239 + (ML20217F239)
- 05000354/LER-1997-020, :on 970828,identified Potential Design Deficiency of Safety Related Control Area Chilled Water Sys Chiller Units.Caused by Human Error in Original Design. Performed Operability Determination & Revised Evaluation + (ML20217F240)
- ML20217F245 + (ML20217F245)
- ML20217F248 + (ML20217F248)
- ML20217F249 + (ML20217F249)
- ML20217F251 + (ML20217F251)
- ML20217F252 + (ML20217F252)
- ML20217F253 + (ML20217F253)
- ML20217F254 + (ML20217F254)
- ML20217F255 + (ML20217F255)
- ML20217F256 + (ML20217F256)
- ML20217F258 + (ML20217F258)
- SVP-97-184, Reissues Original Response to Violations Noted in Insp of Licenses DPR-29 & DPR-30,provided Under Oath & Affirmation as Required.Corrective Actions:Repaired Damaged blow-out Panel Bolts & Conducted Engineering Review of Drawings + (ML20217F261)
- ML20217F262 + (ML20217F262)