Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20217E954 + (ML20217E954)
- ML20217E956 + (ML20217E956)
- ML20217E957 + (ML20217E957)
- ML20217E960 + (ML20217E960)
- ML20217E961 + (ML20217E961)
- ML20217E963 + (ML20217E963)
- ML20217E965 + (ML20217E965)
- ML20217E966 + (ML20217E966)
- ML20217E967 + (ML20217E967)
- ML20217E968 + (ML20217E968)
- ML20217E969 + (ML20217E969)
- ML20217E970 + (ML20217E970)
- VPN-084-99, Submits Notification of Major Changes to Trojan Liquid Radioactive Waste Treatment Sys,Iaw PGE-1201.Detailed Description of Change Provided + (ML20217E971)
- ML20217E972 + (ML20217E972)
- ML20217E973 + (ML20217E973)
- 05000416/LER-1999-004-03, :on 990909,HPCS Sys Was Declared Inoperable Due to Generator Shaft Bearing Failure.Caused by Inadequate Lubrication.Deficiency Document Was Issued & DG Was Tagged Out.With + (ML20217E974)
- ML20217E975 + (ML20217E975)
- ML20217E976 + (ML20217E976)
- 3F1099-19, Part 21 Rept Re Damage on safety-grade Cable Provided to FPC by Bicc Brand-Rex Co.Damage Was Created During Cabling Process While Combining Three Conducters.Corrective Action Program Precursor Card PC99-2868 Was Initiated + (ML20217E979)
- ML20217E980 + (ML20217E980)
- ML20217E981 + (ML20217E981)
- ML20217E982 + (ML20217E982)
- ML20217E983 + (ML20217E983)
- ML20217E984 + (ML20217E984)
- ML20217E985 + (ML20217E985)
- ML20217E987 + (ML20217E987)
- ML20217E988 + (ML20217E988)
- ML20217E991 + (ML20217E991)
- 05000341/LER-1999-004, :on 990913,HPCI Sys Was Noted Inoperable.Caused by Failed HPCI Room Temp Switches.Replaced Temp Switches & HPCI Was Restored to Operable Status.With + (ML20217E992)
- ML20217E993 + (ML20217E993)
- ML20217E995 + (ML20217E995)
- ML20217E996 + (ML20217E996)
- CY-98-065, Provides Util Comments on NRC Historical Review Team Rept. Comments Correct And/Or Clarify Statements in Rept,Util Believe Not Accurately Stated or Need Clarification + (ML20217E998)
- ML20217F000 + (ML20217F000)
- ML20217F001 + (ML20217F001)
- IA-98-130, First Partial Response to FOIA Request for Documents. Documents Listed App a Encl & Available in Pdr.App B Records Also Encl & Being Released to PDR in Entirety + (ML20217F002)
- ML20217F002 + (ML20217F002)
- ML20217F003 + (ML20217F003)
- B17148, Requests That Second Phase Corrective Action Insp,Scheduled to Begin on 980323 Be Postponed.Util Requires Addl Time to Prepare Closure Packages for Known Insp Items & to Review Tier 2/3 & Inscope Insp Repts + (ML20217F004)
- ML20217F007 + (ML20217F007)
- SVP-98-142, Forwards Planned Snubber Functional Testing for Upcoming Outages Q1R15 & Q2P02.Encl Q1R15 Test Plan Supersedes Plan Previously Transmitted in Ltr + (ML20217F008)
- ML20217F009 + (ML20217F009)
- ML20217F010 + (ML20217F010)
- ML20217F013 + (ML20217F013)
- IR 05000293/1998001 + (ML20217F014)
- NOC-AE-000130, Forwards Rev 4 to 0ERP01-ZV-IN01, Emergency Classification. Proposed Changes Presented to State & Local Authorities & Provided Approval + (ML20217F015)
- ML20217F016 + (ML20217F016)
- ML20217F018 + (ML20217F018)
- ML20217F019 + (ML20217F019)
- ML20217F023 + (ML20217F023)
- ML20217F024 + (ML20217F024)