ML20217E957
| ML20217E957 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 10/02/1997 |
| From: | Alexion T NRC (Affiliation Not Assigned) |
| To: | NRC (Affiliation Not Assigned) |
| Shared Package | |
| ML20217E962 | List: |
| References | |
| TAC-M99678, TAC-M99679, NUDOCS 9710070323 | |
| Download: ML20217E957 (2) | |
Text
_ _ _ _ _ _ _ - _ _ _ _.
NOTE TO: PD IV-1 File October 2, 1997 FROM:
Tom Alexion Orig, signed by Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation SUBJF', f: LICENSEF.'S 10 CFR 50.59 EVALUATION OF CONTROL ROOM ENVELOPE HVAC EMERGENCY MAKEUP FLOW CONTROL DAMPER B2HEFCV9585 TEMPORARY MODIFICATION (TAC NOS M99678 AND M99679)
During an inspection at the South Texas Project, it was determined that the i
subject evaluation needed to be forwarded to the appropriate Nuclear Reactor Regulation (NRR) staff for further review. The purpose of this memo is to place this information in the public document room.
l l
Docket Nos. 50-498 and 50-499
Attachment:
As stated l
Distribution.
Docket File PUBLIC (PDR)
TAlsexion D0C. NAME: STP99678.N0T
/
BP4
- u"IB88R au88he p
PDR m::7a ll llllilll IllJ llll ll. S5 IRE CElilliER COPY
-2as
- 4.. ;'
e i
m Plant Operations Review Committee bbb p.
l PORC Review Cover Sheet
-e
- orisiutlas Docum*at No. d OF 94 'O/o /
Revision No-O a
ura rnabet Qn.n~ Ea orlo,or U.U A L Eman wa a
j mer u.
Glous t %_ 4 r o l % n,u r.
A,c H_ e f cu oruk-Torna or-~
m od i k <>A o/
l 0
The PORC has reviewed this licca and has determined that (check as appropriate):
does EQI involve an UNREVIEWED SAFETY QUESTION.
It does It-does does jiQI adversely imp 3ct plant nuclear safety.
It does ces EQIndversely impact the health and safety of plant personnel or the public.
la does does EQI raquire further revicw by,the Plant Mst, the NSRB, or other individuals / groups.
Manager RB Other (specify below)
Unit 1
2
.O REM /.RKS #1>d h-'N b
meb f MN M/b rt'el-(
t m -i t 4
'Ihe PORC recommends this item for:
/
, PORC MEETINO NO.N MPPROVAL JISAPPROVAL OTIIER COMil2TED BY DATE POP.C Secretary This form, when completed, Sikh we retalacJ In accordance with she retention requkrements of the origiuting document.
O l
?
\\
I
- NhW awme-
- 3 ny..w.m..,
g,
-