Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- SVP-98-128, Monthly Operating Repts for Mar 1998 for Quad Cities Nuclear Station Units 1 & 2 + (ML20216F061)
- IR 05000313/1998013 + (ML20216F063)
- ML20216F064 + (ML20216F064)
- ML20216F068 + (ML20216F068)
- ML20216F069 + (ML20216F069)
- ML20216F073 + (ML20216F073)
- ML20216F075 + (ML20216F075)
- ML20216F078 + (ML20216F078)
- ML20216F079 + (ML20216F079)
- ML20216F080 + (ML20216F080)
- IR 05000289/1998001 + (ML20216F087)
- ML20216F088 + (ML20216F088)
- ML20216F091 + (ML20216F091)
- ML20216F092 + (ML20216F092)
- ML20216F094 + (ML20216F094)
- ML20216F098 + (ML20216F098)
- ML20216F099 + (ML20216F099)
- ML20216F100 + (ML20216F100)
- IA-97-469, Partially Deleted Results of Discussion W/Zimmerman Re Issue of Regulatory Oversight for Plant,Unit 2 Restart Being Managed Under Mc 0350 Process.Believes That Mc 0350 Process for Activity Should Be Followed + (ML20216F101)
- ML20216F101 + (ML20216F101)
- ML20216F104 + (ML20216F104)
- ML20216F107 + (ML20216F107)
- ML20216F110 + (ML20216F110)
- ML20216F112 + (ML20216F112)
- ML20216F114 + (ML20216F114)
- ML20216F115 + (ML20216F115)
- ML20216F121 + (ML20216F121)
- ML20216F122 + (ML20216F122)
- ML20216F125 + (ML20216F125)
- ML20216F127 + (ML20216F127)
- ML20216F128 + (ML20216F128)
- ML20216F129 + (ML20216F129)
- ML20216F132 + (ML20216F132)
- ML20216F133 + (ML20216F133)
- ML20216F135 + (ML20216F135)
- 05000293/LER-1998-002, :on 980205,EDG Room Air Temperature Went Below Design Basis.Caused by Unawareness of Significant Effect Wind Direction Has on EDG Room Temp.Engineering Evaluation (Ee 97-066 R-1) Was Completed & Approved + (ML20216F137)
- ML20216F138 + (ML20216F138)
- ML20216F139 + (ML20216F139)
- ML20216F142 + (ML20216F142)
- ML20216F144 + (ML20216F144)
- IR 05000280/1999302 + (ML20216F148)
- ML20216F150 + (ML20216F150)
- ML20216F151 + (ML20216F151)
- ML20216F154 + (ML20216F154)
- 05000298/LER-1997-012, :on 970804,discovered That Suppression Pool Level Risen to Nearly 3 Inches Above Normal Water Level. Caused by Inadequate Operations Crew Supervisory Oversight. Lowered Suppression Pool Vol to Below TS Limit + (ML20216F156)
- ML20216F157 + (ML20216F157)
- ML20216F160 + (ML20216F160)
- ML20216F162 + (ML20216F162)
- 05000317/LER-1998-005, :on 980312,spare Reactor Trip Breaker Did Not Meet TS Requirements.Caused by Inadequate Procedures.Revised Procedures to Include Testing Requirements for Spare Breaker + (ML20216F163)
- ML20216F164 + (ML20216F164)
- ML20216F169 + (ML20216F169)