Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215L722 + (ML20215L722)
- IA-86-588, Reiterates L Robertson 860707 Telcon Request for Two Fixed Federal Protective Officer Posts for 17th & 18th Floors of White Flint North Bldg + (ML20215L723)
- ML20215L723 + (ML20215L723)
- ML20215L724 + (ML20215L724)
- ML20215L726 + (ML20215L726)
- ML20215L728 + (ML20215L728)
- ML20215L731 + (ML20215L731)
- ML20215L732 + (ML20215L732)
- TXX-6437, Interim Deficiency Rept CP-86-37 Re Firing Board Assemblies & Amplifier Boards in Battery Chargers That Do Not Conform to Vendor Assembly Drawings.Initially Reported on 870514.Review Continuing.Next Rept Expected by 870626 + (ML20215L733)
- ML20215L735 + (ML20215L735)
- ML20215L737 + (ML20215L737)
- ML20215L739 + (ML20215L739)
- ML20215L740 + (ML20215L740)
- ML20215L741 + (ML20215L741)
- ML20215L744 + (ML20215L744)
- ST-HL-AE-2268, Responds to NRC Re Open Items Noted in Insp Repts 50-498/87-08 & 50-499/87-08.Operation Procedure 0PGP03-Z0-0003 Revised to Cause Reviewers to Ensure That Previous License Compliance Evaluation Performed + (ML20215L745)
- ST-HL-AE-2032, Provides Addl Info Re Insp of Pressurizer Safety Relief Valves,Per NRC Request.Safety Relief Valves Will Be Inspected After Each Lift Involving Loop Seal or Water Discharge,Under Procedure OPMP04-RC-0024 + (ML20215L747)
- ML20215L748 + (ML20215L748)
- IA-86-281, Notice of Violation from Insp on 750218-22.Infraction Noted: During Shipment on 740720-24,radiotelephone in Transport Tractor Inoperable for Outboard Portion of Round Trip + (ML20215L749)
- ML20215L749 + (ML20215L749)
- ML20215L751 + (ML20215L751)
- ML20215L756 + (ML20215L756)
- ML20215L757 + (ML20215L757)
- IA-85-213, Comments on BNL Re Proposed Review of Concerns Expressed by Ee Kent.Nrc May Expand on Insp Previously Performed at Plant But Should Not Duplicate Work Already Performed by Region V & NRR + (ML20215L758)
- ML20215L758 + (ML20215L758)
- ML20215L759 + (ML20215L759)
- 05000277/LER-1987-004-02, :on 870407,primary Containment Isolations Occurred.Caused by Partial Loss of Offsite Power Due to Buildup of Snow on Power Lines & Contact W/Trees.Trees Near 220-kV Lines Trimmed + (ML20215L760)
- ML20215L762 + (ML20215L762)
- TXX-6402, Revised Response to Violation Item B Noted in Insp Repts 50-445/85-18 & 50-446/85-15.Corrective Steps Taken & Action to Prevent Recurrence Sections Updated to Show Results Achieved.Dates of Full Compliance Moved to 870831 & 880331 + (ML20215L763)
- ML20215L765 + (ML20215L765)
- ML20215L766 + (ML20215L766)
- ML20215L767 + (ML20215L767)
- ML20215L772 + (ML20215L772)
- ML20215L774 + (ML20215L774)
- ML20215L775 + (ML20215L775)
- ST-HL-AE-2131, Forwards Annotated Rev to FSAR Section 11.2 Re Hydrostatic Testing of Liquid Waste Mgt Sys & Compliance W/Nrc Branch Technical Position Etsb 11-1.Changes Revise FSAR to Be Consistent W/Project Requirements for Sys + (ML20215L776)
- TXX-6430, Part 21 & Interim Deficiency Rept CP-87-05 Re Failure of High Range Radiation Monitor Coaxial Cables to Meet Min Environ Qualification for Dielectric Insulation Requirement. Initially Reported on 870406.Next Rept Expected by 870721 + (ML20215L777)
- ML20215L779 + (ML20215L779)
- ML20215L780 + (ML20215L780)
- ML20215L781 + (ML20215L781)
- ML20215L782 + (ML20215L782)
- ML20215L783 + (ML20215L783)
- ML20215L786 + (ML20215L786)
- ST-HL-AE-2145, Provides Updated Schedule for Resolving Deficiency Items Listed in Emergency Preparedness Appraisal Insp Rept. Comprehensive Training Program of Emergency Response Personnel Will Be Complete Before Full Power OL + (ML20215L787)
- ML20215L788 + (ML20215L788)
- ML20215L790 + (ML20215L790)
- ML20215L792 + (ML20215L792)
- ML20215L793 + (ML20215L793)
- ML20215L795 + (ML20215L795)
- ML20215L799 + (ML20215L799)
- ML20215L800 + (ML20215L800)