Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215H649 + (ML20215H649)
- U-600730, Submits Info Re Seismically Unqualified Components in Nuclear Boiler & Combustible Gas Control Sys,Per 861006 telcon.GE-CR120A Relays Will Be Modified Prior to Initial Criticality + (ML20215H651)
- ML20215H655 + (ML20215H655)
- ML20215H657 + (ML20215H657)
- ML20215H658 + (ML20215H658)
- ML20215H659 + (ML20215H659)
- ML20215H661 + (ML20215H661)
- W3P86-3368, Forwards Proprietary & Nonproprietary C-E Encls 1-P & 1-NP to L-CE-R-042 & CEN-343 Re Responses to Request for Addl Info on Cycle 2 Reload Concerning Clad Collapse Analyses & Shutdown Margin.Proprietary Encls Withheld (Ref 10CFR2.790) + (ML20215H662)
- ML20215H664 + (ML20215H664)
- ML20215H665 + (ML20215H665)
- ML20215H666 + (ML20215H666)
- ML20215H669 + (ML20215H669)
- ML20215H670 + (ML20215H670)
- ML20215H671 + (ML20215H671)
- ML20215H675 + (ML20215H675)
- ML20215H677 + (ML20215H677)
- ML20215H680 + (ML20215H680)
- ML20215H681 + (ML20215H681)
- ML20215H682 + (ML20215H682)
- ML20215H684 + (ML20215H684)
- ML20215H686 + (ML20215H686)
- ML20215H687 + (ML20215H687)
- ML20215H689 + (ML20215H689)
- ML20215H692 + (ML20215H692)
- ML20215H693 + (ML20215H693)
- ST-HL-AE-1778, Advises of Concerns Re Compilation of Insp Documentation Errors Discovered During Review of Applicable Documentation & Amount of Work Performed by Individuals within Ebasco Site Quality Records Group.Related Correspondence + (ML20215H694)
- IA-87-136, Recommends That Commission Approve Publication of Subj Amends to 10CFR50 Re Codes & Stds for Nuclear Power Plants & Technical Info in Effective Form (Encl D of SECY-75-283) + (ML20215H695)
- ML20215H695 + (ML20215H695)
- ML20215H696 + (ML20215H696)
- ML20215H698 + (ML20215H698)
- PY-CEI-NRR-0642, Forwards LERs 87-022-00,87-023-00 & 87-024-00 + (ML20215H699)
- ML20215H700 + (ML20215H700)
- W3P86-3372, Requests Extension of Time for Implementation of Deluge Capability for Charcoal Filter Units Due to Difficulties W/Procurement & Delivery of Integral Components + (ML20215H701)
- ML20215H703 + (ML20215H703)
- 05000440/LER-1987-023, :on 870330,manual Reactor Protection Sys Actuation Initiated Due to Decrease in Reactor Vessel Water Level.Caused by Improper Valve Alignment Between Feedwater & Reactor Water Cleanup Sys.Personnel Retrained + (ML20215H704)
- ML20215H705 + (ML20215H705)
- ML20215H707 + (ML20215H707)
- ML20215H708 + (ML20215H708)
- 05000440/LER-1987-024, :on 870330,reactor Protection Sys Actuation Occurred Due to Upscale Trip of Neutron Monitoring Sys Intermediate Range Monitor.Caused by Electrical Noise While Maint Outage Work in Progress.Temporary Jumpers Installed + (ML20215H709)
- L-83-353, Forwards BAW-1976, Small Break LOCA Analysis for B&W 177FA Lowered Loop Plants in Response to NUREG-0737,Item II.K.3.31, & Generic Ltr 83-35 + (ML20215H710)
- TXX-6423, Interim Deficiency Rept CP-86-04 Re Placement of Richmond Inserts in Proximity of Loaded Embedded Plates Which Could Compromise Integrity of Adjacent Shear Cones.Initially Reported on 870213.Next Rept Will Be Submitted by 870401 + (ML20215H712)
- ML20215H714 + (ML20215H714)
- ST-HL-AE-2136, Forwards Revised Pages to Util FSAR Which Reflect Change in Commitment to Reg Guide 8.27 Re Radiation Protection Aspects of General Employee Training Courses + (ML20215H715)
- ML20215H716 + (ML20215H716)
- IR 05000361/1986025 + (ML20215H717)
- ML20215H720 + (ML20215H720)
- 05000440/LER-1987-022, :on 870329 & 0407,unexpected Autostarts of Diesel Generator Bldg Ventilation Sys Divs 1 & 2 Occurred. Caused by Incorrect Wiring Configuration & Unadjusted Relay Reset Setpoint.Conditions Corrected + (ML20215H722)
- ML20215H723 + (ML20215H723)
- ML20215H724 + (ML20215H724)
- ML20215H725 + (ML20215H725)
- ML20215H727 + (ML20215H727)
- ML20215H728 + (ML20215H728)