Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000354/LER-1986-066, :on 860907,discovered That Surveillance Testing of Main Turbine Bypass Valve Not Performed Prior to Increasing Reactor Power Above 25%.Caused by Procedural Inadequacy.Surveillance Test Procedure Revised + (ML20215F627)
- 05000413/LER-1987-020, :on 870514,determined That Weekly Fire Door Insp Not Performed on 870508.Caused by Personnel Error.Insp Performed Upon Discovery.Memo Issued to Remind Personnel of Insp + (ML20215F629)
- NUREG/CR-4178, Forwards Evaluation of LERs During May 1985 - Jul 1986 Based on Exam of 22 Randomly Selected Lers,Per NUREG/CR-4178 + (ML20215F630)
- 05000237/LER-1986-025-04, :on 861122,grab Sample Not Connected to Chimney Effluent Sample Point.Caused by Personnel Error.Technician Involved Admonished.Comprehensive Training Planned for All Technicians to Review Tech Spec + (ML20215F631)
- ML20215F634 + (ML20215F634)
- 05000324/LER-1986-025-01, :on 861120,determined That 861119 Surveillance of Reactor Jet Pump Missed.Caused by Personnel Error. Surveillance Performed Satisfactorily.Personnel Disciplined & Training Initiated + (ML20215F637)
- ML20215F640 + (ML20215F640)
- ML20215F641 + (ML20215F641)
- ML20215F642 + (ML20215F642)
- ML20215F644 + (ML20215F644)
- ML20215F647 + (ML20215F647)
- ML20215F651 + (ML20215F651)
- ML20215F654 + (ML20215F654)
- 05000370/LER-1986-019-03, :on 861118,personnel Failed to Verify Operability of Diesel Generators 2A & 2B & Second Offsite Power Source.Caused by Personnel Error.Incident Will Be Reviewed During Requalification Training + (ML20215F656)
- 0CAN108603, Discusses Util Efforts Re IE Info Notice 86-003, Limitorque Internal Wiring. Util Decision Not to Perform Immediate Insp Based on Fact That Wiring Issue Never Constituted Serious Safety Concern + (ML20215F657)
- ML20215F659 + (ML20215F659)
- 05000370/LER-1986-020-02, :on 861118,generator Loss of Load Transient Occurred Followed by Main Feedwater Pump 2B Tripping on High Discharge Pressure Signal.Caused by Relay Fault.Operators Realigned Pump 2A to Feedwater Header + (ML20215F663)
- RBG-24512, Forwards Alternative Methods of Compliance w/10CFR50.55a, Item a.2 for Consideration.Vendor Documentation of Compliance to Matl,Production & Testing Requirements of Applicable Code Also Encl + (ML20215F664)
- ML20215F667 + (ML20215F667)
- ML20215F668 + (ML20215F668)
- ML20215F670 + (ML20215F670)
- ML20215F671 + (ML20215F671)
- ML20215F672 + (ML20215F672)
- ML20215F673 + (ML20215F673)
- ML20215F675 + (ML20215F675)
- ML20215F678 + (ML20215F678)
- PNO-I-86-098, on 861215,employee Received Exposure to S-35 to Portion of Skin on One Hand.Decontamination Efforts Reduced end-window Geiger Counter Level from 330,000 to 53,000 Counts Per Minutes.Dose to Skin Between 40 & 400 Rads + (ML20215F679)
- ML20215F683 + (ML20215F683)
- 05000370/LER-1986-021-02, :on 861120,normal Source Potential Transformer for 6900-volt Bus 2TA Normal Incoming Breaker Deenergized, Resulting in Reactor Trip.Caused by Personnel Error.Incident Reviewed & Transformers Labeled + (ML20215F684)
- IR 05000413/1986045 + (ML20215F686)
- ML20215F687 + (ML20215F687)
- B12207, Submits Summary of Facility PORV Setpoint Issue & Addl Info Supporting Conclusion That Evaluation Unnecessary to Assure Public Safety or Conform to NRC Requirements + (ML20215F688)
- IR 05000454/1986034 + (ML20215F690)
- PNO-II-86-092, on 861218,licensee Shut Down Unit to Begin Scheduled Refueling Outage 6 Wks Early.Caused by Excessive Vibrations in Reactor Coolant Pump 3B2.During Outage,Reactor Coolant Pumps 3B1,3B2 & 3A1 Will Be Modified + (ML20215F691)
- ML20215F693 + (ML20215F693)
- B12262, Clarifies Commitment Made in Util Re Startup Physics Rept.Review of Safety Analysis,Amend & Rev to Startup Rept Required to Resolve Issue.Amend Request Will Be Submitted During Fourth Quarter 1986 + (ML20215F694)
- 05000410/LER-1986-007-01, :on 861120,two Electrical Protection Assemblies Spuriously Tripped,Resulting in Loss of Power to safety- Related Control Circuit.Root Cause Evaluation Will Be Performed + (ML20215F695)
- 05000312/LER-1986-024, :on 861115,during Fuse Replacement Activity in Bus Inverter S1A,power Momentarily Interrupted & DHR Train a Tripped.Caused by Design Not Allowing for Testability Using Substitute Power Source + (ML20215F698)
- ML20215F701 + (ML20215F701)
- ML20215F706 + (ML20215F706)
- ML20215F707 + (ML20215F707)
- ML20215F709 + (ML20215F709)
- 05000410/LER-1986-008-01, :on 861117,discovered Potential Breaches in Fire Barriers During Control Rod Testing.Caused by Failure to Seal Penetrations.Fire Watches Established & Penetrations Sealed + (ML20215F710)
- RBG-24405, Forwards Addl Info Re 860917 Application for Amend to License NPF-47,changing RCIC Sys Tech Specs as Result of 860908 Valve Inoperability Event.Fuel Failure Not Expected Due to Provision of Makeup Water from Feedwater or HPCS Sys + (ML20215F712)
- ML20215F714 + (ML20215F714)
- ML20215F716 + (ML20215F716)
- 05000254/LER-1986-028, :on 861003,RCIC Declared Inoperable Due to Closed Trip Throttle Valve.Cause Undetermined.Valve Relatched & RCIC Declared Operable.Event Considered Isolated + (ML20215F720)
- 05000266/LER-1986-005-01, :on 861117,reactor Tripped Due to Loss of Power on Red Instrument Bus.Caused by Failure of Control Circuit Diode in Bus Inverter.Diodes Replaced + (ML20215F721)
- 05000325/LER-1986-025, :on 860916,control of Bldg HVAC Sys & Control Bldg Emergency Air Filtration Autoisolated,Causing Train 2B to Start.Caused by Open Relay Coil.Relay Replaced & Sys Returned to Svc + (ML20215F723)
- PNO-II-86-091D, licensee Repts Two Addl Deaths Occurred as Result of Injuries from 861209 Accident.Caused by Break of 18-inch Feedwater Sys Suction Line Scalding Eight Workers W/Hot Water & Steam.Number of Dead Now Four + (ML20215F724)
- ML20215F725 + (ML20215F725)