ML20215F687
| ML20215F687 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 09/24/1986 |
| From: | Gridley R TENNESSEE VALLEY AUTHORITY |
| To: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 8610160325 | |
| Download: ML20215F687 (1) | |
Text
T~
0 TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 374ol M 15 Lookout Place g sEP23 SEP 24 886 U.S. Nuclear Regulatory Comissitsn Region II ATTN:
Dr. J. Nelson Grace, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323
Dear Dr. Grace:
SEQUOYAH NUCLEAR PLANT, UNIT 2 - RESPONSE TO VICTOR STELLO'S LETTER TO H. G. PARRIS DATED SEPTEMBER 24, 1981,'" CONTAINMENT SPRAY SYSTEM VALVE MISALIGNMENT" In TVA's letter from L. M. Fills to you dated October 19, 1981 Sequoyah Nuclear Plant (SQN) comitted to revise Surveillcnce Instruction (SI)-186,
" Category
'E' Valve Position Verification," to require its performance on a weekly basis.
Based upon ALARA considerations for plant personnel and past performances of SI-186 not identifying any significant problems, SQN now intends to revise SI-186 to return the performance frequency to the monthly timeframe required by the SQN technical specifications.
If you have any questions, please call G. B. Kirk at 615/870-6549.
Very truly yours, TENNESSEE VALLEY AUTHORITY R. Gr diey, irector Nuclear Saf y and Licensing cc:
Mr. James Taylor, Director i
Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Attention:
Document Control Desk l
Washington, D.C. 20555 Mr. G. G. Zech 9
Director, TVA Projects
-J U. S. Nuclear Regulatory Comission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 8610160325 860'724 PDR ADOCK 05000328 l
PDR p
An Equal Opportunity Employer
--