ML20215F678

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-454/86-34 & 50-455/86-29 on 860908-19.No Violations Noted
ML20215F678
Person / Time
Site: Byron  
Issue date: 10/07/1986
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20215F681 List:
References
NUDOCS 8610160322
Download: ML20215F678 (2)


See also: IR 05000454/1986034

Text

,

..

OCT 07I w6

Docket No. 50-454

Docket No. 50-455

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Mr. W. B. Grant of

this office on September 8-19, 1986, of activities at Byron Nuclear Power

Station, Units 1 and 2, authorized by NRC Operating License No. NPF-37 and

Construction Permit No. CPPR-131 and to the discussion of our findings with

Mr. R. Querio and members of his staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

J' Original signed by W.D. E5iafer"

~

W. D. Shafer, Chief

Emergency Preparedness and

Radiological Protection Branch

Enclosure:

Inspection Reports

No. 50-454/86034(DRSS)-

e61016o322 861007

4

No. 50-455/86029(DRSS)'

PDR

ADOCK 0500

G

See Attached Distribution

RI

R

R

RIII

I RII

tQ@

G

s

Fo

y

er

  • < wn

S

c

,

.

.-

-

_

__

. .

..

.

0CT 071986

~ Commonwealth Edison Company

2

Distribution

- cc w/ enclosure:

D.'L. Farrar, Director

of Nuclear Licensing

V. I. Schlosser, Project Manager

-

Gunner Sorensen, Site Project

Superintendent

R. E. Querio, Plant Manager

DCS/RSB.(RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII Byron

Resident Inspector, RIII

Braidwood

Phyllis Dunton, Attorney

General's Office, Environmental

. Control Division

D. W.-Cassel, Jr., Esq.

Diane'Chavez, DAARE/ SAFE

Steve _ Lewis, ELD

'

L. 01shan, NRR LPM

H. S. Taylor, Quality Assurance

Division

-

1

4

A

--,-.,-->>.m..

.,,

n..,-

, --

--n---

-- - - -,--,--e-,

-pa,---

+,

-e

- . m

w,

- - , ,

--w

, , , ,

nm-