Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215B194 + (ML20215B194)
- ML20215B197 + (ML20215B197)
- ML20215B198 + (ML20215B198)
- IR 05000321/1986039 + (ML20215B200)
- ML20215B201 + (ML20215B201)
- ML20215B202 + (ML20215B202)
- ML20215B206 + (ML20215B206)
- ML20215B207 + (ML20215B207)
- ML20215B213 + (ML20215B213)
- ML20215B217 + (ML20215B217)
- ST-HL-AE-2249, Forwards Annotated Rev to FSAR Section 6.4.5.1, Control Room Envelope HVAC Integrity & Leaktightness Test. Revised Section 6.4.5.1 Will Be Included in Future FSAR Amend + (ML20215B221)
- ML20215B222 + (ML20215B222)
- ML20215B224 + (ML20215B224)
- ML20215B227 + (ML20215B227)
- ML20215B231 + (ML20215B231)
- ML20215B233 + (ML20215B233)
- ML20215B234 + (ML20215B234)
- ML20215B242 + (ML20215B242)
- IA-87-128, Responds to Telcons & 870121 Meeting W/Pp Narbut Re Concerns Over Practices at Plant.Encl Statement of Concerns Will Be Addressed During Upcoming Insp + (ML20215B243)
- ML20215B243 + (ML20215B243)
- ML20215B248 + (ML20215B248)
- ML20215B250 + (ML20215B250)
- ML20215B253 + (ML20215B253)
- TXX-5025, Final Deficiency Rept CP-86-56 Re Fastening of Standby Diesel Generator Engine Connecting Rod Assembly Identified by Tdi.Initially Reported on 860814.Issue Not Reportable Per 10CFR50.55(e) + (ML20215B256)
- ML20215B258 + (ML20215B258)
- ML20215B259 + (ML20215B259)
- ST-HL-AE-1765, Forwards Probabilistic Boron Dilution Analysis Final Rept, Per SER Open Item 15.Analysis Demonstrates That at Least 15 Minutes Available for Operator Response in Event of Boron Dilution Transient.Related Correspondence + (ML20215B265)
- TXX-6507, Interim Deficiency Rept CP-86-72 Re Scope of Plant Mods Resulting from Project Pipe Support Reverification Program. Initially Reported 860609.List of Support Mods Issued to Date Encl.Next Rept Will Be Submitted by 870820 + (ML20215B266)
- ML20215B269 + (ML20215B269)
- ML20215B270 + (ML20215B270)
- ML20215B272 + (ML20215B272)
- ML20215B280 + (ML20215B280)
- TXX-5031, Interim Deficiency Rept CP-86-49 Re Effects of polar-organic Solvents on Sealants of Conax Adaptor Modules & Electrical Penetrations.Investigation Continuing.Next Rept Expected by 861010 + (ML20215B281)
- 05000528/LER-1986-044, :on 860902,automatic Reactor Protection Sys Actuation Initiated Reactor Trip.Caused by Spurious Low Reactor Coolant Flow (Lrcf) Trip on Channels B & D on Steam Generator 2.LCRF Trip Setpoints Evaluated + (ML20215B282)
- ML20215B283 + (ML20215B283)
- ML20215B285 + (ML20215B285)
- ML20215B287 + (ML20215B287)
- ML20215B288 + (ML20215B288)
- ML20215B290 + (ML20215B290)
- ML20215B292 + (ML20215B292)
- ML20215B293 + (ML20215B293)
- ST-HL-AE-1763, Forwards Harza Engineering Co Rept, Main Cooling Reservoir Performance Evaluation for Filling to Elevation 35, in Response to SER Confirmatory Item 4.Related Correspondence + (ML20215B296)
- ST-HL-AE-1751, Submits Detailed Description of Plant Emergency Lighting Sys in Response to Telcon Re Util Response to Closing of SER (NUREG-0781) Confirmatory Item 20.Related Correspondence + (ML20215B301)
- ML20215B304 + (ML20215B304)
- ML20215B305 + (ML20215B305)
- 05000295/LER-1987-012-05, :on 870515,discovered Logic Surveillance High Steam Flow Safety Injection Block Permissive Not Done. Caused by Faulty Test Procedure Requiring Closure of MSIV & Subsequent Unit Trip.New Procedure Developed + (ML20215B307)
- ML20215B308 + (ML20215B308)
- ML20215B309 + (ML20215B309)
- ML20215B312 + (ML20215B312)
- BECO-86-145, Forwards Augmented Insp Program for Piping Susceptible to Igscc,Per Generic Ltr 84-11.Preliminary List of Welds to Be Examined During Refueling Outage 7 & Isometric Drawings, Depicting Location of Subj Welds,Encl + (ML20215B315)
- ML20215B316 + (ML20215B316)