Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000324/1987002 + (ML20215A623)
- ML20215A625 + (ML20215A625)
- IR 05000382/1987007 + (ML20215A626)
- ML20215A628 + (ML20215A628)
- PNO-III-87-081, on 870610,earthquake Measuring 5.0 on Richter Scale Occurred Near Lawrenceville,Il.Unusual Events Declared by Six Power Stations But No Damage Observed.Ground Motion Felt at Five Other Plants + (ML20215A632)
- IR 05000424/1987033 + (ML20215A633)
- ML20215A635 + (ML20215A635)
- ML20215A636 + (ML20215A636)
- ML20215A637 + (ML20215A637)
- ML20215A638 + (ML20215A638)
- ML20215A640 + (ML20215A640)
- ML20215A643 + (ML20215A643)
- ML20215A645 + (ML20215A645)
- ML20215A649 + (ML20215A649)
- ML20215A656 + (ML20215A656)
- ML20215A657 + (ML20215A657)
- ML20215A659 + (ML20215A659)
- ML20215A661 + (ML20215A661)
- TXX-6502, Interim Deficiency Rept CP-86-13 Re Jet Impingement Load Review for High Energy Piping.Initially Reported on 860305. Schedule for Review Completion & Issuance of Final Engineering Report Changed to 870722.Next Rept by 870819 + (ML20215A663)
- ML20215A664 + (ML20215A664)
- IA-86-656, Forwards 10CFR50.55(e) & Part 21 Telephone Rept Re Tdi Diesel Generator Lube Oil Cooler.Followup on Generic Aspects of Problem Requested + (ML20215A669)
- ML20215A669 + (ML20215A669)
- IR 05000289/1986010 + (ML20215A672)
- ML20215A673 + (ML20215A673)
- ML20215A676 + (ML20215A676)
- ML20215A682 + (ML20215A682)
- ML20215A684 + (ML20215A684)
- ML20215A686 + (ML20215A686)
- TXX-6509, Interim Deficiency Rept CP-85-50 Re Cable Tray Tee Fittings. Initially Reported on 851206.Listed Steps Taken to Establish Min Weld Criteria & Acceptability of Installed Component Weld.Next Rept Will Be Sent by 870930 + (ML20215A688)
- IR 05000369/1984028 + (ML20215A690)
- W3P86-3323, Application for Amend to License NPF-38,consisting of Tech Spec Change Requests NPF-38-40,NPF-38-41 & NPF-38-42, Revising Shutdown Margin Whenever All Full Length Control Element Assemblies Fully Inserted in Core.Fee Paid + (ML20215A692)
- ML20215A696 + (ML20215A696)
- ML20215A700 + (ML20215A700)
- ML20215A705 + (ML20215A705)
- ML20215A707 + (ML20215A707)
- ML20215A709 + (ML20215A709)
- ML20215A711 + (ML20215A711)
- ML20215A713 + (ML20215A713)
- ML20215A714 + (ML20215A714)
- TXX-6512, Interim Deficiency Rept CP-87-12 Re Containment Pressure/ Temp Analysis Computer Error.Initially Reported on 870513. Reanalysis of Main Steamline Break to Be Completed 870701. Next Rept Will Be Submitted by 870805 + (ML20215A718)
- ML20215A719 + (ML20215A719)
- ML20215A720 + (ML20215A720)
- ML20215A722 + (ML20215A722)
- ML20215A726 + (ML20215A726)
- ML20215A727 + (ML20215A727)
- ML20215A728 + (ML20215A728)
- ML20215A729 + (ML20215A729)
- ML20215A732 + (ML20215A732)
- ML20215A738 + (ML20215A738)
- ML20215A741 + (ML20215A741)
- ML20215A743 + (ML20215A743)