- 05000482/LER-1986-061, :on 861031,motor Circuit Breaker for Centrifugal Charging Pump a Racked Down,While Charging Pump B Out of Svc.Caused by Personnel Error.Oversight Discussed W/Involved Personnel + (ML20214P703)
- L-86-476, Revises Response to Finding B.1 Noted in Insp Repts 50-250/86-33 & 50-251/86-33.Corrective Actions:Insp & Checkout of Loop Performed & Procedure ONOP-0208.14 Revised to Clarify Channel Spiking Requirements + (ML20214P704)
- ML20214P705 + (ML20214P705)
- ML20214P710 + (ML20214P710)
- ML20214P711 + (ML20214P711)
- 05000327/LER-1987-023, :on 870430,insp of Ice Condenser Vent Assemblies Not Performed,Per Tech Specs Due to Lack of Guidance in Surveillance Instruction.Instruction Revised to Clarify Insp Requirements + (ML20214P716)
- ML20214P718 + (ML20214P718)
- TXX-5013, Interim Deficiency Rept CP-86-15 Re Field Flash & K1 Relays Required to Operate During Starting Process of Diesel Generators.Initially Reported on 860314.Evaluation Continuing.Next Rept Will Be Submitted by 860930 + (ML20214P720)
- ML20214P723 + (ML20214P723)
- ML20214P728 + (ML20214P728)
- ML20214P729 + (ML20214P729)
- ML20214P733 + (ML20214P733)
- ML20214P734 + (ML20214P734)
- ML20214P735 + (ML20214P735)
- ML20214P738 + (ML20214P738)
- ML20214P739 + (ML20214P739)
- RBG-24819, Special Rept:On 861018,Div II Diesel Generator Experienced Invalid Failure During Surveillance Testing.Caused by Improper Determination of Normal Background Vibration Level During Previous Engine Run.Vibration Switch Readjusted + (ML20214P741)
- 1CAN098609, Forwards Proprietary & Nonproprietary, Inadequate Core Cooling Monitoring Sys Final Design Description, Per NUREG-0737,Item II.F.2.Proprietary Rept Withheld (Ref 10CFR2.790) + (ML20214P742)
- NUREG-0845, Advises of Change in NRC Onsite Staffing & Function During Emergency.Region II Incident Response Team Will No Longer Provide Primary Communicator for Emergency Notification Sys & Health Physics Network at Emergency Response Facilities + (ML20214P743)
- TXX-6473, Forwards Revised Response to Violations Noted in Insp Repts 50-445/86-14 & 50-446/86-11.Corrective Actions:Procedures EEI-7,CP-CPM-14.1 & QI-QP-11.3-26 Revised & Applicable Const Personnel Trained in Revised Requirements + (ML20214P744)
- ML20214P746 + (ML20214P746)
- TXX-6475, Interim Deficiency Rept CP-86-40 Re Procurement & Use of Nonqualified Agastat Relays in Class 1E Applications. Initially Reported on 861010.Future 7000 Series Relays Will Be Purchased with E Prefix.Next Rept Expected by 871009 + (ML20214P747)
- ML20214P748 + (ML20214P748)
- 05000483/LER-1987-007, :on 870504,control Room Ventilation Isolation Occurred When Test Probes of Digital Voltmeter Placed Across Incorrect Terminals in Solid State Protection Sys Cabinet. Caused by Personnel Error + (ML20214P749)
- ML20214P750 + (ML20214P750)
- ST-HL-AE-2200, Third Interim Deficiency Rept Re Electrical Splices Using Raychem Heat Shrink Insulation Matl Installed Incorrectly. Initially Reported on 870219.Insp in Progress to Determine Number of Incorrectly Installed Splices.Next Rept by 870610 + (ML20214P751)
- ML20214P752 + (ML20214P752)
- TXX-6477, Advises That Completion of Environ Qualification Verification Program Corrective Actions Described in App B, Item I.B.5 of Enforcement Action 86-09 Revised to 871001 for Unit 1 & 881101 for Unit 2 + (ML20214P753)
- ML20214P754 + (ML20214P754)
- ML20214P756 + (ML20214P756)
- ST-HL-AE-2177, Final Deficiency Rept Re Small Break LOCA Mitigation During Plant Shutdown.Initially Reported on 860929.For Small Breaks in Modes 3 & 4,issue Not Reportable Under 10CFR50.55(e) + (ML20214P759)
- ML20214P760 + (ML20214P760)
- TXX-6464, Final Deficiency Rept CP-86-69 Re Failure to Incorporate Specific Restraining/Support Requirements Into Project Specs & Procedures.Initially Reported on 861002.Design Change Authorization Issued to Revise Spec 2323-ES-100 + (ML20214P761)
- ML20214P763 + (ML20214P763)
- ML20214P764 + (ML20214P764)
- ML20214P765 + (ML20214P765)
- 05000529/LER-1986-030-01, :on 860826,Train B Containment Purge Actuation Signal Generated by Esfas.Caused by Malfunction of Output Relay in Power Access Purge Area Monitor.Output Relay Replaced & Monitor Retested + (ML20214P770)
- ML20214P771 + (ML20214P771)
- IA-86-837, Final Response to FOIA Request.Document Listed Already Available in Pdr.Documents in App a Completely Withheld (Ref FOIA Exemption 4) + (ML20214P772)
- ML20214P772 + (ML20214P772)
- ML20214P773 + (ML20214P773)
- 05000327/LER-1986-049, :on 861102,standby Diesel Generators Started on Loss of Voltage to Shutdown Board 1B-B 6.9 Kv.Caused by Personnel Error.Signs Will Be Added to End of Each 6.9 Kv Unit Board to Designate Board Ends + (ML20214P774)
- ML20214P775 + (ML20214P775)
- IR 05000321/1986029 + (ML20214P776)
- ML20214P777 + (ML20214P777)
- ML20214P778 + (ML20214P778)
- AECM-87-0106, Responds to NRC Re Violations Noted in Insp Rept 50-416/87-10.Corrective Actions:Training Session Conducted by QA Dept for All QA Insp & Audit Personnel & Procedure 01-S-06-3 Re Temporary Alterations Will Be Revised + (ML20214P779)
- ML20214P780 + (ML20214P780)
- ML20214P781 + (ML20214P781)
- TXX-6482, Interim Deficiency Rept CP-84-12 Re Environ Qualification of Equipment Outside Containment for High Energy Line Breaks. Initially Reported in 840604.Analysis of Issue Continuing. Next Rept Will Be Submitted on 870728 + (ML20214P783)
- ML20214P784 + (ML20214P784)