ML20214P723
| ML20214P723 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 11/21/1986 |
| From: | Bailey J GEORGIA POWER CO., SOUTHERN COMPANY SERVICES, INC. |
| To: | Harold Denton, Youngblood B Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19292G336 | List: |
| References | |
| GN-1193, NUDOCS 8612040323 | |
| Download: ML20214P723 (3) | |
Text
_
Georgia Power Company
- RouO 2, Box 299A E
W;ynesboro. Georgia 30830'
-. Telephone 404 554-9961 404 724-8114 PROPRIETARY Southern Company Services. Inc.
=
Post Office Box 2625 Birmingham. Alabama 35202 Tele @me 205 870 6011 Vogtle Proj.ect 1
November 21, 1986 f
Director of Nuclear Reactor. Regulation File:
X3BLOl Attention:
B.
J.
Youngblood Log:
GN-1193 PWR Project Directorate #4 Division of PWR Licensing A U.
S. Nuclear Regulatory Commission Washington, D.
C.
20555 NRC DOCKET NUMBERS 50-424 AND $0-425 l
CONSTRUCTION PERMIT NUMBERS CPPR-lO8 AND CPPR-109 VOGTL8 ELECTRIC GENERATING PLANT - UNITS 1& 2
[
SER OPEN ITEM 1:
EQUIPMENT QUALIFICATION t
I--
Dear Mr. Denton:
As requested during a conference call with your staff on November 14, 1986, we are providing additional information concerning seismic and pump / valve operability issues.
The information is provided in the following attachments: :
Guidelines for Nut / Bolt Thread Engagement Walkdown Statistical Analysis of Nut / Bolt Thread Engagement (Proprietary) :
Feedwater Check Valves - Design and Surveillance :
Turbine Trip and Throttle Valve Operating Procedure - Status Attachment S:
Safety Injection Pump - Similarity Evaluation :
Deep Draft Pump - 100 Hour Test Status :
CVI Containment Cooling Units - Design Modifications It is respectfully requested that the information which is
. proprietary to Bechtel Power Corporation be withheld from public disclosure in accordance with 10CFR 2.790 of the Commission's regulations.
An application for withholding along with an affidavit is enclosed in Attachment 2.
~'
8612040323 861121 PDR ADOCK 05000424 E
PDR fb0e
ll(!
lll gl
-Director of:' Nuclear Reactor-Regulation' l
1986
((
l November 121,
'Page 2
?
information,~please.do not-hesitate
- Should1you; require additional to call.
S ince re ly',.
i-
.J; jai BaileyL.
Projuct Licensing Manager JAB /bb Attachment xc:
R.
E.-Conway-NRC Regional Administrator R.
A. Thomsas
~NRC Resident Inspector-
'J.:E.-Joiner, Esquire.
D.
Feig.
B.
W. Churchhill, Esquire R.
W.
McManus M.
A.. Miller-(2)
L.
T.
Gucwa
-Clarke.Kido' Vogtle Project File p--
Jag'Singh l.
B.
Jones,sEsquire t
-G.
Bockhold, Jr..
I l
I I
L.
ATTACHMENT 1 GUIDELINES FOR NUT / BOLT THREAD ENGAGEMENT WALKDOWN l
l 1