Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20213G823 + (ML20213G823)
- ML20213G828 + (ML20213G828)
- ML20213G829 + (ML20213G829)
- ML20213G832 + (ML20213G832)
- PNO-III-87-066, on 870509,during Process of Heating Up Unit Following Refueling Outage,Water Hammer Damaged Main Steam Line 1B Outside Containment.Cause Unknown.Msivs & Bypass Valves Taken Out of Svc & Repairs Started + (ML20213G834)
- ML20213G835 + (ML20213G835)
- ML20213G836 + (ML20213G836)
- ML20213G839 + (ML20213G839)
- 05000440/LER-1986-069, :on 861015,determined That Tech Spec Actions for Operation W/Inoperable Control Rod Not Performed as Required During Plant Operations on 861011-14.Caused by Personnel Error.Rod Control Sys Test Instruction Changed + (ML20213G840)
- ML20213G841 + (ML20213G841)
- 05000440/LER-1986-070, :on 861023,drywell Vacuum Relief (DVR) Valve Opened Automatically Due to Increase in Differential Pressure.Caused by Conservative DVR Valve Setpoints.Work Order Initiated to Raise DVR Setpoints + (ML20213G842)
- ML20213G843 + (ML20213G843)
- ML20213G846 + (ML20213G846)
- ML20213G847 + (ML20213G847)
- IR 05000333/1986017 + (ML20213G848)
- IA-87-233, Final Response to FOIA Request.No Records Subj to Request Located + (ML20213G849)
- ML20213G849 + (ML20213G849)
- ML20213G850 + (ML20213G850)
- 05000482/LER-1986-058, :on 861015,hourly Fire Watch of Area Containing Inoperable Fire Barrier Penetration Missed.Caused by Personnel Error.Event Discussed in Training Sessions for Fire Watch Personnel + (ML20213G851)
- ML20213G853 + (ML20213G853)
- ML20213G855 + (ML20213G855)
- ML20213G859 + (ML20213G859)
- ML20213G863 + (ML20213G863)
- ML20213G865 + (ML20213G865)
- ML20213G866 + (ML20213G866)
- IR 05000346/1987011 + (ML20213G867)
- ML20213G868 + (ML20213G868)
- ST-HL-AE-2151, Forwards Annotated Revs to FSAR Section 17.2, Qa. Revs Initiated in Response to NRC Questions.Revs Will Be Incorporated Into Future FSAR Amend + (ML20213G870)
- ML20213G871 + (ML20213G871)
- ML20213G872 + (ML20213G872)
- ML20213G873 + (ML20213G873)
- ML20213G877 + (ML20213G877)
- ML20213G879 + (ML20213G879)
- ML20213G881 + (ML20213G881)
- ML20213G882 + (ML20213G882)
- 05000346/LER-1986-041, :on 861013,mgt-initiated Review of Compliance W/Tech Specs Identified Deficiency in Tech Spec 4.7.9.2a Re Cycling of Testable Fire Protection Spray Flow Path Valves. Procedure Revised to Require Annual Testing + (ML20213G883)
- RBG-25903, Forwards Status of Util & Hydrogen Control Owners Group Efforts on Outstanding Concerns Re Hydrogen Control Rule. Completion of Efforts Should Be Sufficient to Demonstrate Compliance W/Hydrogen Control Rule or Identify Mods + (ML20213G886)
- 05000247/LER-1986-034, :on 861016,F Function Signal to Overpower & Overtemp delta-T Trips Did Not Meet Test Acceptance Criteria.Caused by Three Defective Controllers.Two Controllers Repaired.Third Controller Replaced + (ML20213G887)
- ML20213G888 + (ML20213G888)
- ML20213G890 + (ML20213G890)
- IR 05000454/1987016 + (ML20213G891)
- ML20213G891 + (ML20213G891)
- GO2-86-101, Forwards 60-day Rept Per IE Bulletin 86-002 Re Static O-Ring (Sor) Differential Pressure Switches.Tests of Four Sor Switches Indicate That Instruments Exhibit well-defined Repeatable Shifts & No Further Special Testing Necessary + (ML20213G894)
- 05000220/LER-1986-032, :on 861016,reactor Bldg Emergency Ventilation Sys (Evs) Actuated.Caused by Inadvertent Unseating of Relay from Socket in Circuit.Reactor Bldg Evs Manually Reset.W/ + (ML20213G895)
- ML20213G896 + (ML20213G896)
- ML20213G898 + (ML20213G898)
- ML20213G899 + (ML20213G899)
- ML20213G900 + (ML20213G900)
- IR 05000352/1986022 + (ML20213G902)
- ML20213G903 + (ML20213G903)
- ML20213G904 + (ML20213G904)