Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212P413 + (ML20212P413)
- ML20212P414 + (ML20212P414)
- BSEP-87-0019, Monthly Operating Repts for Dec 1986 + (ML20212P417)
- ML20212P419 + (ML20212P419)
- ML20212P423 + (ML20212P423)
- ML20212P424 + (ML20212P424)
- ML20212P425 + (ML20212P425)
- 05000339/LER-1986-010-03, :on 860804,05 & 11,unidentified RCS Leakage Exceeded Tech Spec 3.4.6.2 Requirement of 1 Gpm.Caused by Leakage at Primary Sys Valves,Reactor Coolant Pump Seals & Sources Listed in Table 1.Equipment Repaired + (ML20212P428)
- ML20212P430 + (ML20212P430)
- ML20212P431 + (ML20212P431)
- ML20212P433 + (ML20212P433)
- ML20212P435 + (ML20212P435)
- 05000528/LER-1986-062, :on 870211,discovered That Max Surveillance Interval for Monthly Functional Test of Plant Protection Sys (36ST-9SB02) Exceeded on 860222.Caused by Communication Error.Surveillance Program Enhanced + (ML20212P438)
- ML20212P440 + (ML20212P440)
- ML20212P442 + (ML20212P442)
- ML20212P443 + (ML20212P443)
- ML20212P444 + (ML20212P444)
- 05000369/LER-1987-003-03, :on 870130,containment Air Return Fans Declared Inoperable.Caused by Inadequate Administrative Controls Resulting in Removal of Water Curbs W/O Reinstallation.Curbs Replaced.Procedures Will Be Revised + (ML20212P446)
- BSEP-86-1199, Responds to Violations Noted in Insp Repts 50-324/86-16 & 50-325/86-15.Corrective Actions:Outstanding Work Requests/ Job Orders from Refueling Outage Reviewed to Ensure Proper Limiting Conditions for Operation + (ML20212P447)
- ML20212P449 + (ML20212P449)
- U-600684, Forwards Response to NRC Questions on FSAR Chapter 8, Electric Power Re Effect of Block Start Voltage on Equipment & motor-operated Valves.Calculations Indicate Sys Adequate Under Listed Conditions + (ML20212P453)
- ML20212P454 + (ML20212P454)
- ML20212P455 + (ML20212P455)
- AECM-86-0238, Forwards Revised Application for Amend to License NPF-29, Allowing Entry Into Operational Conditions 1 & 2 W/O Performing Surveillance Requirement 4.1.3.1.4.a Provided Test Performed at Least Every 18 Months + (ML20212P456)
- ML20212P460 + (ML20212P460)
- ML20212P463 + (ML20212P463)
- ML20212P464 + (ML20212P464)
- ML20212P465 + (ML20212P465)
- ML20212P466 + (ML20212P466)
- ML20212P467 + (ML20212P467)
- ML20212P469 + (ML20212P469)
- ML20212P470 + (ML20212P470)
- PLA-2813, Responds to NRC Re Violations Noted in Insp Repts 50-387/86-27 & 50-388/86-30.Corrective Actions:Alarm Response Procedures AR-106-001,AR-015-001 & AR-016-001 Changed to Direct Operator Attention to Impact on Tech Spec + (ML20212P472)
- ML20212P475 + (ML20212P475)
- ML20212P477 + (ML20212P477)
- ML20212P481 + (ML20212P481)
- ML20212P482 + (ML20212P482)
- ML20212P483 + (ML20212P483)
- ML20212P484 + (ML20212P484)
- ML20212P487 + (ML20212P487)
- ML20212P488 + (ML20212P488)
- ML20212P492 + (ML20212P492)
- ML20212P493 + (ML20212P493)
- PM-87-001, Monthly Operating Rept for Dec 1986 + (ML20212P495)
- IR 05000344/1986029 + (ML20212P496)
- ML20212P497 + (ML20212P497)
- ML20212P501 + (ML20212P501)
- IR 05000298/1986021 + (ML20212P502)
- ML20212P505 + (ML20212P505)
- ML20212P508 + (ML20212P508)
- ML20212P509 + (ML20212P509)