ML20212P433
| ML20212P433 | |
| Person / Time | |
|---|---|
| Site: | 07200001, 07001308 |
| Issue date: | 08/27/1986 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Van Hoomissen GENERAL ELECTRIC CO. |
| References | |
| CAL, NUDOCS 8609030130 | |
| Download: ML20212P433 (1) | |
Text
CONFIRMATORY ACTION LETTER AUS 271986 Docket No.72-001 General Electric Company ATTN: Mr. J. E. Van Hoomissen Manager, Spent Fuel Services Operation 310 De Guigne Drive Post Office Box 508 Sunnyvale, CA 94086 Gentlemen:
This refers to the telephone conversation on August 27, 1986, in which Mr. T. E. Ingels of your staff and Messrs. L. R. Greger and G. M. France, III of this office discussed the high levels of removable contamination measured on the surface of IF-300 casks arriving at Nebraska Public Power District on July 29 and August 19, 1986.
It is our understanding that you will not release the IF-300 casks from your Morris Operations facility until measures have been taken, acceptable to this office, that will ensure contamination levels during transit do not exceed 00T limits.
If our understanding of this matter is incorrect, please inanediately contact Mr. Greger (312-790-5644) or Mr. France (312-790-5786).
Sincerely, ft/
James G. Keppler Regional Administrator cc:
E. E. Voiland, Manager Morris Operation DCS/RSB(RIDS)
D. M. Dawson, Manager Licensing & Transportation Fuel Recovery Operations J. Axelrad. IE G. Sjoblam. IE R. Bangart, RIV N
L Y.
RIII RI 1'
RIII II RIII RII RIII
$wd W
France /mmGr(eger 'r ind r n Tambling s
Ke pl r 8/ /86
- /e W4 9 ( t ] { ?,6 e 27fs/>
CONFIRMATO Y ACTION LETTER 8609030130 860027:
g hDR ADOCK 07001308 gI V
t m