ML20212P492

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1986
ML20212P492
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/31/1986
From: Mcdonald R, Woodard J
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8703160128
Download: ML20212P492 (5)


Text

y 4Ib.',

.44 l

. JOSEPH M. FARLEY NUCLEAR PLANT-UNIT 2 NARRATIVE SibMARY OF OPERATIONS

};

December, 1986 O

During the month of December, there were no unit shutdowns 'or significant power reductions.

. The following major safety-related maintenance was performed in the month of-December:

1.

The position indication for control rod P-6 was repaired.

2.

4160V breaker puffer tube design changes were completed.

.. 3.

Miscellaneous corrective and preventive maintenance was performed on diesel generators, s

g316012886123'1 R

ADOCK 05000364 PDR

-94 V

eh

i ft OPERATING DATA REPORT DOCKET NO.

50-364 DATE 1/5/87 COMPLETED BY.i n Unnard i

TELEPHONE _(205)899-5156 5

OPERATING STATUS Notes

1. Unit Name: Josenh M. Farlev - Unit ~2
2. Reporting Period:

December, 1986

1) Cumulative data since
3. Licensed Thermal Power (MWt):

2.652 7-30-81, date of

4. Nameplate Rating (Gross MWe):

860 commercial operation.

5. Design Electrical Rating (Net MWe):

829

6. Maximum Dependable Capacity (Gross MWe):

872.2 829.2

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Thic:.sh 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted,If Any (Net MWe):

N/A l

10. Reasons For Restrictions.If Any:

N/A i

This Month Yr to.Date Cumulative l

' 11. Hours In Reporting Period 744 8.760 47.545

12. Number Of Hours Reactor Was Critical 744.0 7,549.-6 46,3.i6.2 l
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator on Line 744.0 7.458.4 40.850.8

(

15. Unit Reserve Shutdown Hours 0.0 0.0' O.0
16. Grors The rnal Ener;y Generted (MWH) 1.970.404 19.083,440 103,317,990

'17. Gross Electrical Energy Generated (MhH) 652.106 6.286.582 34.009.270

18. Net Electrical Energy Generated (MWH) 621,604 5,959,872 32,249,112
19. Unit Senice Factor 100.0 85.1 85.9
20. Unit Availability Factor 100.0 85.1 85.9
21. Unit Capacity Factor (Using MDC Net) 100,8 82.0 83.4
22. Unit Capacity Factor (Using DER Net) 100,8 82.1 81.8
23. Unit Forced Outage Rate 0.0 2.4 4.4
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eacht:

Steam Generator Flush, 1/10/87, approximately 16 davs.

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 l

INITIAL ELECTRICITY 05/24/81 05/25/81 l.

COMMERCIAL OPERATION 08/01/81 07/30/81 (9/77)

p-DOCKET No. 50-364

-g UNIT 2 DATE 1/5/87 COMPLETED BY J. D. Woodard TELEPHONE (205)899-5156 MONTH December DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Me-Net)

(Me-Net) 1 832 17 832 2

831 18 859 3

834 19 837 4

836 20 838 5

837 21 838 6

837 22 839 7

837 23 834 8

832 24 837 9

824 25 839 10 825 26 840 11 827 27 839 12 835 28 839 13 839 29 840 14 839 30 839 i

15 838 31 839 i

j 16 834 INSTRUCTIONS On this format, list the average daily unit power level in m e-Net for each day in the reporting month. Compute to the nearest whole megawatt.

l Form 13/21 t

e a=

g.-

'50-364 UNIT Situ 1 DOWNS AND POWER RElHICTIONS DOCKET NO. _

UNIT NAME J.M. Farley-Unit 2 DATE 1/5/87 COMPl.ETED gy.i n Woodard REPORT MON ill _ December TELEPHONE (205) 899-5156 j

i t5 5

c ce E'f l_kensee Ev, g4 Cause & Curreceive 2e g

g 4

N. i.

Dale g;

gg

., y oc Event R?

a3 Adi.m so F

o3 (E

jijg Hepost #

Pstvent Hecutience in La j

6 t

i l

TilERE WI. flE NO UNIT Sill :TDOWr 3 OR SI ;NIFICANT POWEl REDUC' ' IONS DURIt i THE MONTH OF DECEMBER.

i 1

J i

i l

)

i 1

l 2

3 4

F: I.ns eil Heason:

Melhoil:

Exhibit G Insisuctiims l

S; Siliciluleil A Fquipinens Failure (Emplain) 1 -Manual for Pseparation of Data l

n Maintenance e,iTest 2-Manual Scram.

Ensiy Slicess (os 1.itensee -

O Hefueling 3 Automatic Scram.

Event Repius (l.ER) file INelHFG-

}

D llegulaieny Resiliction 4 -Oshes (Emplaio) 0161) l 1 Opesaios Tsaining A license Fxamination i

F-Aihninisisasive 5

l i; 0.ciatsunal I isos (l% plain) l% labia 1 Same Sinuce 3

i

('J/11) ll Olhei (thpliin) i

[ :%

_., g /

Alatama Power Company 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291-0400 Telephone 205 250-1835 AlabamaPower

~

WWn Mhtern enio V ce sident January 12, 1987 Docket No. 50-364 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report

- Attached are two (2) copies of the December 1986 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 2, required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

[

ery t)uly, Yours

(

2'._ [W R. P. Mcdonald i

l RPM /BCE:amh/F-2 l

Enclosures xc: Director, IE (10 copies)

Director, RII (1 copy)

I l

l l

l M

l

$.))

-