Followup to 851223 Special Rept:On 851117,pyrocrete Fire Barrier,Separating Fire Areas 36A & 36B,found Damaged Due to Work on Bus Ducts.Repair Work Completed & Fire Barriers Declared Operable on 860808
ML20212P467
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 08/21/1986
From: Andrews R
OMAHA PUBLIC POWER DISTRICT
To: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
LIC-86-417, NUDOCS 8609030147
Download: ML20212P467 (2)


Text

1 ,.

Omaha Public Power District 1623 Harney Omaha. Nebraska 68102 2247 402/536-4000 . --

fs. h h AW 2 5 o i .

August 21, 1986 }V LIC-86-417 -

Mr. Robert D. Martin Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Tx. 76011

Reference:

Docket No. 50-285

Dear Mr. Martin:

Followup to Special Report on Inoperability of Fire Barrier The Omaha Public Power District, holder of Operating License DPR-40, submits this followup to a special report which was issued December 23, 1985 regarding an inoperable fire barrier.

Fort Calhoun Station Unit No.1 Technical Specification 2.19(7) requires that all penetration fire barriers protecting safety-related areas shall be func-l tional (intact). With a penetration fire barrier nonfunctional, within one I

hour, either establish a continuous firewatch on at least one side of the affected penetration, or verify the operability of fire detectors on at least

one side of the penetration and esloblish an hourly firewatch patrol. Restore j the nonfunctional penetration to functional status within seven days, or pre-l pare and submit within an additional 30 days a report to the Nuclear Regulatory l Commission. Pursuant to Technical Specification 5.9.3, a special report was issued on December 23, 1985 reporting an inoperable fire barrier.

On November 17, 1985, the pyrocrete fire barrier separating fire areas 36A and 36B was found to be damaged due to work on bus ducts in the immediate area.

Maintenance Order No. 857613 was issued to correct the nonconformities. On August 8,1986, repair work was completed and the fire barrier declared oper-able. During the period o; inoperability, an hourly firewatch was maintained.

This followup report is being issued to provide notification to the NRC that repairs have been completed on the subject pyrocrete fire barrier. Future time 8609030147 860321 ,

DR ADOCK 0900 egcg 7f F 3

_ym_ 9

. oc R. D. Martin LIC-86-417 Page 2 delays of this nature can be avoided now that a supply of the pyrocrete repair material is being maintained on site and personnel with requisite training and experience in working with pyrocrete are part of the Fort Calhoun Station maintenance staff.

Sincerely, R. L. Andrews Division Manager Nuclear Production l RLA/me cc: LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Ave., N.W.