Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212E688 + (ML20212E688)
- PNO-III-86-155, on 861223,US Court of Appeals,Sixth Circuit, Cincinnati,Oh,Lifted Stay Which Restricted Operation of Plant to 5 Percent Power.Licensee Plans to Start Plant Up During Weekend of 861227 & Resume Power Ascension Testing + (ML20212E690)
- ML20212E691 + (ML20212E691)
- ML20212E692 + (ML20212E692)
- ML20212E693 + (ML20212E693)
- ML20212E695 + (ML20212E695)
- IR 05000313/1986032 + (ML20212E696)
- ML20212E697 + (ML20212E697)
- 05000334/LER-1997-032, :on 970927,automatic Start of EDG Occurred During Bus Transfer from Unit to Sys Station Transformer. Caused by Conservative Setpoints for Starting EDGs at Unit 1.Restored CR Ventilation + (ML20212E698)
- LIC-99-0080, Requests Approval of Attached Rev to QAP Contained in App a of Usar,Revising Commitment Re Qualifications of Personnel Performing Quality Control Insps of Activities Affecting Fire Protection + (ML20212E699)
- ML20212E702 + (ML20212E702)
- ML20212E703 + (ML20212E703)
- ML20212E704 + (ML20212E704)
- LIC-97-0174, Forwards Fort Calhoun Station Performance Indicators, for Sept 1997 + (ML20212E705)
- IR 05000285/1986030 + (ML20212E706)
- 05000413/LER-1987-003, :on 870124,results of Boron Analyses Performed on Samples from Cold Leg Accumulator B After Each of Four Water Additions Exceeded Tech Specs.Cause by Personnel Error.Personnel Counseled + (ML20212E708)
- L-86-324, Responds to Violations Noted in Insp Rept 50-250/85-43. Corrective actions:100% Power Meter Indication Alignment of Neutron Flux Detectors Completed on 850916.Civil Penalty Payment Encl + (ML20212E709)
- ML20212E711 + (ML20212E711)
- ML20212E713 + (ML20212E713)
- IR 05000285/1986021 + (ML20212E714)
- ML20212E715 + (ML20212E715)
- ML20212E716 + (ML20212E716)
- ML20212E717 + (ML20212E717)
- ML20212E721 + (ML20212E721)
- ML20212E724 + (ML20212E724)
- TXX-6134, Responds to NRC 861117 Request for Addl Info on Violation & Deviation Noted in Insp Repts 50-445/85-18 & 50-446/85-15. Corrective actions:CP-QP-2.1 Revised to Eliminate Need for Min OJT & OJT Waivers & Verification Package Reinspected + (ML20212E725)
- ML20212E726 + (ML20212E726)
- ML20212E727 + (ML20212E727)
- ML20212E728 + (ML20212E728)
- LIC-99-0087, Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams + (ML20212E730)
- ML20212E731 + (ML20212E731)
- ML20212E734 + (ML20212E734)
- ML20212E736 + (ML20212E736)
- ML20212E737 + (ML20212E737)
- ML20212E738 + (ML20212E738)
- ML20212E740 + (ML20212E740)
- ML20212E743 + (ML20212E743)
- ML20212E744 + (ML20212E744)
- ML20212E745 + (ML20212E745)
- ML20212E747 + (ML20212E747)
- ML20212E748 + (ML20212E748)
- ML20212E750 + (ML20212E750)
- ML20212E754 + (ML20212E754)
- PNO-II-86-059, on 860826,CP&L Plans to Keep Robinson Unit in Unscheduled Shutdown Longer than 48 H.Inadvertent Overboration of Unit During Efforts to Match Erratic Flow Resulted in Temp & Pressure Reduction.State of Nc Informed + (ML20212E756)
- ML20212E757 + (ML20212E757)
- ML20212E758 + (ML20212E758)
- ML20212E759 + (ML20212E759)
- IR 05000232/1951001 + (ML20212E761)
- B16829, Informs That Date for Beginning Second 10-yr Interval, Corresponding W/Implementation of Revised IST Program Plan, Will Be Specified within IST Program Plan Submitted Prior to Startup Due to Extended Shutdown.Revised Commitments,Encl + (ML20212E763)
- PNO-V-86-094, on 861224,facility Tripped from 100% Power. Cause Believed to Be Electrical Malfunction on Vital Bus B. Definitive Cause of Malfuncion Under Investigation.Unit Will Be Maintained in Mode 3 Until Cause Identified + (ML20212E764)
- ML20212E767 + (ML20212E767)