Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212D985 + (ML20212D985)
- 05000304/LER-1986-020-06, :on 861130,two Containment Isolation Valves Discovered Open During Audit of Chain Locked Valves,Per IE Info Notice 86-055.Caused by Inadequate Administrative Procedures.Procedures Revised + (ML20212D986)
- ML20212D987 + (ML20212D987)
- ML20212D988 + (ML20212D988)
- ML20212D990 + (ML20212D990)
- ML20212D992 + (ML20212D992)
- ML20212D993 + (ML20212D993)
- 05000245/LER-1997-037, Forwards LER 97-037-00,documenting Event Which Occurred on 970930 at Millstone Nuclear Power Station,Unit 1.Commitments Made within Ltr,Listed + (ML20212D994)
- ML20212D995 + (ML20212D995)
- ML20212D996 + (ML20212D996)
- ML20212D999 + (ML20212D999)
- RBG-25122, Special Rept:On 861120 & 24,valid Failures Occurred on Div I Diesel Generator While Performing Surveillance Testing. Caused by Oil in Tubing That Supplies Air to Air Start Valves.Oil Drained & Air Start Valves Reassembled & Tested + (ML20212E001)
- ML20212E002 + (ML20212E002)
- ML20212E003 + (ML20212E003)
- 05000220/LER-1986-033, :on 861121,reactor Bldg Closed Loop Cooling HX Failed Inservice Insp Hydrostatic Test Due to Crack in Weld. Caused by Improper Welding of silicon-bronze to Carbon Steel Weld.Hx Isolated & Under Repair + (ML20212E005)
- ML20212E008 + (ML20212E008)
- 05000245/LER-1997-037-01, :on 970930,house Heating Boiler Ash Was Found to Be Slightly Contaminated.Caused by Unmonitored Release Path for Airborne Effluents IAW Requirements of TS 4.8.D.4. Restricted Boiler Use Until SE Was Performed + (ML20212E009)
- JPN-99-029, Comment Supporting Proposed Rules 10CFR50 & 72 Re Reporting Requirement for Nuclear Power Reactors + (ML20212E010)
- ML20212E011 + (ML20212E011)
- RBG-25131, Rev 1 to Special Rept:On 860605,valid Failure of Div II Diesel Generator Occurred While Performing Surveillance Testing.Caused by Incorrect Test Connection Due to Inadequate Procedure.Relays Reset & Tested Successfully + (ML20212E012)
- IR 05000313/1986014 + (ML20212E014)
- ML20212E015 + (ML20212E015)
- 3F1097-02, Supplemental Response to Responding to Violations Noted in Insp Rept 50-302/96-09,providing Results of Evaluation Completed on 970930 & Proposed Corrective Actions for Identified Discrepancies + (ML20212E016)
- ML20212E017 + (ML20212E017)
- ML20212E018 + (ML20212E018)
- ML20212E019 + (ML20212E019)
- ML20212E023 + (ML20212E023)
- ML20212E026 + (ML20212E026)
- 05000344/LER-1987-002, :on 870129,positive Pressure Could Not Be Maintained in Control Room W/Control Room Emergency Ventilation Sys.Caused by stuck-open Door to Control Room Viewing Gallery.Door Closed + (ML20212E027)
- 05000327/LER-1985-019-01, :on 850524,inadequate Seismic Piping Supports Discovered.Caused by Personnel Errors.Drawing Discrepancies Re Both Pipes Corrected & Sk Series of Prints Superseded by 47W Series of Prints + (ML20212E028)
- ML20212E030 + (ML20212E030)
- ML20212E031 + (ML20212E031)
- 05000414/LER-1986-050-01, :on 861118,containment Air Release & Addition Sys Release Terminated When Containment Activity Rose Above Setpoint.Caused by Too Conservative Tech Specs.Setpoint Increased + (ML20212E033)
- IR 05000020/1997201 + (ML20212E034)
- ST-HL-AE-1852, Final Deficiency & Part 21 Rept Re Excessive Grease in Westinghouse Electrical Penetration Assemblies (Epas). Initially Reported on 861126.EPAs Disassembled,Cleaned & Reassembled.Westinghouse Also Evaluating Item Per Part 21 + (ML20212E035)
- ML20212E037 + (ML20212E037)
- 05000458/LER-1986-066, :on 861124,discovered That Two Rated Fire Doors Omitted from Any Surveillance Test Procedure (STP) Door List.Caused by Procedural Deficiency.Temporary Change Notice Written to Include Two Doors in Daily STP + (ML20212E040)
- 3F1097-11, Forwards Revised Request for Relief from Requirements of 10CFR50.55a(g)(4)(v),modifying Original Request to State That FPC Will Now Be Performing Containment Repair & Replacement Activities IAW ASME Section XI + (ML20212E042)
- ML20212E043 + (ML20212E043)
- ML20212E044 + (ML20212E044)
- ML20212E045 + (ML20212E045)
- ML20212E047 + (ML20212E047)
- AECM-87-0040, Requests Authorization to Use ASME Code Case N-343, Alternate Scope of Exam of Attachment Welds for Exam Categories B-H,B-K-1 & C-C,Section Xi,Div 1. Fee Paid + (ML20212E049)
- IR 05000267/1986033 + (ML20212E050)
- 3F1097-37, Provides Info Re Insp of High Pressure Injection/Makeup Line Nozzles at Crystal River Unit 3 as Identified in Item 31 of Attachment B to + (ML20212E051)
- ML20212E053 + (ML20212E053)
- IR 05000282/1986012 + (ML20212E055)
- ML20212E056 + (ML20212E056)
- ML20212E059 + (ML20212E059)
- ST-HL-AE-1849, Application to Amend CPPR-128 & CPPR-129 Authorizing GDC-4 Re Requirements for Protection Against Dynamic Effects of Postulated Pipe Rupture,As Modified on 860512,to Be Basis for Facility Design + (ML20212E060)
- ML20212E064 + (ML20212E064)