Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212A598 + (ML20212A598)
- ML20212A602 + (ML20212A602)
- ML20212A603 + (ML20212A603)
- PNO-II-86-048, on 860710,two Glaziers Employed by Util Contractor Fell 40 Ft After One End of Scaffolding Gave Way. Accident Occurred in New Simulator Training Bldg Outside Plant Security Fence.Men Taken to Hosp + (ML20212A604)
- ML20212A605 + (ML20212A605)
- ML20212A606 + (ML20212A606)
- ML20212A607 + (ML20212A607)
- ML20212A608 + (ML20212A608)
- IR 05000293/1986010 + (ML20212A612)
- 05000263/LER-1997-010, Forwards LER 97-010-00 Re Failure to Include Some Supports on Reactor Head Vent Line in ISI Program in 2nd 10-Yr Interval.Rept Contains Two New NRC Commitments + (ML20212A613)
- ML20212A614 + (ML20212A614)
- IR 05000298/1999008 + (ML20212A615)
- PNO-III-86-072, on 860722,reactor Tripped While Operating at 90% Power.Caused by Workman Error While Attempting to Calibr Stator Cooling Water Pressure Switches.Util Will Proceed to Cold Shutdown for Repairs & Perform Snubber Surveillances + (ML20212A616)
- ML20212A619 + (ML20212A619)
- ML20212A621 + (ML20212A621)
- ML20212A622 + (ML20212A622)
- PY-CEI-NRR-2427, Application for Amend to License NPF-58,deleting License Condition 2.C.10 Re Controls Over Containment Air Locks During Plant Outages & Clarifying License Condition 2.F Re Reporting Requirements of TS & EPP Violations + (ML20212A623)
- IR 05000461/1987008 + (ML20212A624)
- ML20212A627 + (ML20212A627)
- ML20212A629 + (ML20212A629)
- 05000263/LER-1997-010-01, :on 970916,failure to Include Some Supports on Reactor Head Vent Line in ISI Program in 2nd 10 Year Interval Occurred.Caused by Original Plant Drawings Incomplete.Controlled Drawings Will Be Revised + (ML20212A630)
- ML20212A632 + (ML20212A632)
- ML20212A635 + (ML20212A635)
- PNO-II-99-037D, on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 Mph + (ML20212A637)
- ML20212A638 + (ML20212A638)
- ML20212A641 + (ML20212A641)
- IR 05000395/1986008 + (ML20212A648)
- 05000263/LER-1997-011, :on 970908,failure to Transfer HPCI & RCIC Suctions to Suppression Pool After Making Condensate Storage Tank Level Instrument Inoperable Occurred.Caused by Cognitive Personnel Errors.Procedures Reviewed + (ML20212A650)
- ML20212A651 + (ML20212A651)
- IR 05000259/1986023 + (ML20212A653)
- ML20212A655 + (ML20212A655)
- ML20212A658 + (ML20212A658)
- ML20212A659 + (ML20212A659)
- CY-97-094, Provides NRC W/Results of Util Investigation Pertaining to Supplemental Response to CAL Issue,As Documented in Unrestricted Release Confirmatory Survey Program + (ML20212A661)
- ML20212A662 + (ML20212A662)
- IR 05000382/1987001 + (ML20212A663)
- ML20212A664 + (ML20212A664)
- ML20212A667 + (ML20212A667)
- ML20212A668 + (ML20212A668)
- IR 05000302/1986018 + (ML20212A669)
- ML20212A670 + (ML20212A670)
- ML20212A671 + (ML20212A671)
- ML20212A673 + (ML20212A673)
- BSEP-97-0450, Revises Commitment to Provide Min of Sixteen Hours of Simulator Training Per Quarter Per Licensed Operator.Util Will Provide Simulator Training for Each Licensed Operator, as Part of Evaluation Element of SAT Process + (ML20212A674)
- ML20212A675 + (ML20212A675)
- ML20212A676 + (ML20212A676)
- ML20212A680 + (ML20212A680)
- ML20212A681 + (ML20212A681)
- ML20212A684 + (ML20212A684)
- ML20212A686 + (ML20212A686)
- ML20212A688 + (ML20212A688)