Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000382/LER-1999-010-01, :on 990726,discovered Inadequate Pumping Capacity in Dry Cooling Tower Area.Caused by Inadequate Design Control.Portable Pumps Were Installed in Each Dry Cooling Tower Areas to Ensure Sufficient Pumping Capacity + (ML20211E536)
- ML20211E538 + (ML20211E538)
- ML20211E539 + (ML20211E539)
- ML20211E540 + (ML20211E540)
- ML20211E541 + (ML20211E541)
- ML20211E542 + (ML20211E542)
- ML20211E543 + (ML20211E543)
- ML20211E544 + (ML20211E544)
- ML20211E546 + (ML20211E546)
- ML20211E547 + (ML20211E547)
- ML20211E550 + (ML20211E550)
- ML20211E551 + (ML20211E551)
- ML20211E554 + (ML20211E554)
- ML20211E555 + (ML20211E555)
- ML20211E556 + (ML20211E556)
- ML20211E558 + (ML20211E558)
- ST-HL-AE-1915, Forwards Revised FSAR Pages 7.3-8,7.3-64 & 15.7-15,changing Info Re Response Time for Reactor Containment Bldg Purge Isolation,Spent Fuel Pool & Control Room/Exclusion Area Boundary Radiation Monitors + (ML20211E559)
- ML20211E560 + (ML20211E560)
- ML20211E561 + (ML20211E561)
- ST-HL-AE-1661, Responds to IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Valve List & Data Encl.W/Affidavit + (ML20211E563)
- ML20211E565 + (ML20211E565)
- ML20211E566 + (ML20211E566)
- ML20211E567 + (ML20211E567)
- ML20211E568 + (ML20211E568)
- ML20211E570 + (ML20211E570)
- ML20211E572 + (ML20211E572)
- ML20211E573 + (ML20211E573)
- ML20211E574 + (ML20211E574)
- ML20211E576 + (ML20211E576)
- ML20211E577 + (ML20211E577)
- ML20211E578 + (ML20211E578)
- ML20211E579 + (ML20211E579)
- ML20211E580 + (ML20211E580)
- ML20211E585 + (ML20211E585)
- ML20211E589 + (ML20211E589)
- ML20211E591 + (ML20211E591)
- ML20211E592 + (ML20211E592)
- ML20211E593 + (ML20211E593)
- B12401, Application for Amend to License DPR-21,revising Tech Specs by Lowering RWCU Sys Isolation Setpoint from Reactor Low Water Level to lo-lo Water Level.Fee Paid + (ML20211E594)
- ML20211E596 + (ML20211E596)
- ML20211E599 + (ML20211E599)
- ML20211E601 + (ML20211E601)
- B16685, Forwards Response to Recommendations Made by Little Harbor Consultants,Inc During 970722 Meeting.List of Util Commitments Provided + (ML20211E602)
- ML20211E603 + (ML20211E603)
- JAFP-86-0479, Advises That Min Flow Logic Circuit for RHR Sys Not Susceptible to Single Failure,Per IE Bulletin 86-001,due to Removal of LPCI Loop Select Logic & Closure & Electrical Disabling of RHR cross-tie Valve + (ML20211E604)
- ML20211E605 + (ML20211E605)
- ML20211E606 + (ML20211E606)
- ML20211E607 + (ML20211E607)
- ML20211E608 + (ML20211E608)
- ML20211E609 + (ML20211E609)