ML20211E589
| ML20211E589 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 02/17/1987 |
| From: | Wiggins J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| NUDOCS 8702240358 | |
| Download: ML20211E589 (2) | |
Text
- _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _
T FEB 171987 No.87-025 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF BOARD MEETING Name of Licensee:
Boston Edison Company Name of Facility: Pilgrim Nuclear Power Station Docket No.: 50-293 Time and Date of Meeting:
10:00 a.m,, March 2, 1987 Location of Meeting:
NRC Region I Main Conference Room (Front Section)
Purpose of Meeting: Systematic Assessment of Licensee Performance (SALP) Board Meeting NRC Attendees:
W. Kane, Director, Division of Reactor Projects T. Martin, Director, Division of Radiation Safety and Safeguards (DRSS)
S. Ebneter, Director, Division of Reactor Safety (DRS)
L. Bettenhausen, Chief, Operations Branch, DRS J. Durr, Chief, Engineering Branch, DRS R. Bellamy, Chief, Emergency Preparedness and Radiological Protection Branch, DRSS J. Joyner, Chief, Nuclear Materials and Safeguards Branch, DRSS J. Wiggins, Chief, Reactor Projects Section 18, DRP M. McBride, Senior Resident Inspector J. Lyash, Resident Inspector J. Zwolinski, Director, BWR Project Directorate No.1, NRR R. Auluck, Licensing Project Manager, NRR Note: Attendance by NRC personnel at this meeting should be made known by February 25, 1987, via telephone call to J. Wiggins, Region I, at FTS 8-488-1128 or 215-337-5128.
original signed sy p
g J. T. Wiggins, Chief Reactor Projects Section IB 8702240358 870217 PDR ADOCK 05000293 G
PDR 2ar
- ~\\
2 Distribution:
Victor Stello, Jr., Executive Director for Operations James Sniezek, Deputy Executive Director for Regional Operations and-Generic Requirements James M. Taylor, Director, Office of Inspection and Enforcement James G. Partlow, Director, Division of Inspection Programs, IE Jane Axelrad, Director, Enforcement Staff, IE J. Lieberman, Assistant General Counsel for Enforcement, DGC R. Bernero, Director, Division of Boiling Water Reactor Licensing, NRR R. Auluck, Licensing Project Manager, BWR Project Directorate No. 1, NRR J. Zwolinski, Director, BWR Project Directorate No. 1, NRR Public Document Room (PDR)
Local Public Document Room (LPDR) bec:
Regional Administrator Deputy Regional Administrator Division Directors Branch Chiefs Region I Receptionist PA0 DRMA files i
RI:DRP RI:DRP f
Doerflein i Wiggins 2/G /87 2/0/87 0FFICIAL RECORD COPY 507DOERFLEIN2/13/87 - 0002.0.0 02/13/87
- -