Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211D159 + (ML20211D159)
- ML20211D160 + (ML20211D160)
- ML20211D161 + (ML20211D161)
- ML20211D164 + (ML20211D164)
- ML20211D165 + (ML20211D165)
- ML20211D169 + (ML20211D169)
- ML20211D170 + (ML20211D170)
- ML20211D172 + (ML20211D172)
- ML20211D173 + (ML20211D173)
- ML20211D174 + (ML20211D174)
- 1CAN108606, Forwards Proprietary B&W Rept 32-1147602-02, 177 Once- Through Steam Generator Tube/Sleeve Loads, in Response to Telcon Request for Addl Info in Support of 40% Plugging Criteria.Rept Withheld (Ref 10CFR2.790) + (ML20211D175)
- ML20211D178 + (ML20211D178)
- 3F0997-02, Forwards Summary of Plant App R Restart Design Items Covered Under Restart Item D-11,in Response to 970707 Rai.Schedule Shows That Most App R Related Construction Will Be Completed by Last Half of Nov 1997 + (ML20211D179)
- 3F0997-26, Notifies NRC of Completion of, Failure Modes & Effects Analysis for Crystal River Unit 3 Class 1E 250/125 Vdc Electrical Distribution Sys + (ML20211D181)
- 05000255/LER-1987-001-01, :on 870114,containment Penetrations Associated W/Containment Hydrogen Monitoring Sys Did Not Employ Redundant Isolation Logic.Caused by Sys Design Description Not Being Implemented as Prescribed + (ML20211D183)
- ML20211D186 + (ML20211D186)
- ML20211D187 + (ML20211D187)
- ML20211D189 + (ML20211D189)
- ML20211D191 + (ML20211D191)
- ML20211D194 + (ML20211D194)
- ML20211D198 + (ML20211D198)
- ML20211D202 + (ML20211D202)
- ML20211D203 + (ML20211D203)
- ML20211D204 + (ML20211D204)
- ML20211D206 + (ML20211D206)
- ML20211D208 + (ML20211D208)
- 05000280/LER-1986-022, :on 860916 & 20,partial Train B ESF Actuations Occurred Due to Reactor Protection Sys Relay Failures.Caused by Coil Failure.Coil Replaced & Relay Reinstalled & Tested + (ML20211D209)
- ML20211D212 + (ML20211D212)
- ML20211D213 + (ML20211D213)
- ML20211D214 + (ML20211D214)
- ML20211D215 + (ML20211D215)
- BVY-97-119, Responds to 970828 RAI Re Rept YAEC-1339, Yaec Application of FIBWR2 Core Hydraulics Code to BWR Reload Analyses + (ML20211D216)
- ML20211D218 + (ML20211D218)
- ML20211D220 + (ML20211D220)
- ML20211D222 + (ML20211D222)
- ML20211D224 + (ML20211D224)
- ML20211D225 + (ML20211D225)
- ML20211D226 + (ML20211D226)
- ML20211D227 + (ML20211D227)
- ML20211D229 + (ML20211D229)
- ML20211D230 + (ML20211D230)
- ML20211D233 + (ML20211D233)
- NSD-NRC-97-5331, Forwards Response to Comment 41 on AP600 Ssar,Chapter 15, Accident Analyses + (ML20211D234)
- ML20211D235 + (ML20211D235)
- ML20211D236 + (ML20211D236)
- ML20211D239 + (ML20211D239)
- ML20211D240 + (ML20211D240)
- ML20211D241 + (ML20211D241)
- BVY-99-108, Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered + (ML20211D244)
- ML20211D245 + (ML20211D245)
- ML20211D250 + (ML20211D250)