Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-327/86-31 & 50-328/86-31.Supplemental Response to Violation Re Polar Crane Wall Entrance Expected
ML20211D241
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/10/1986
From: Zech G
NRC - TVA OVERSIGHT GROUP, NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: White S
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8610220148
Download: ML20211D241 (2)


See also: IR 05000327/1986031

Text

_ _ _ _ _ _ _ _ _ . _

_ _ _

____..__ ____ _ _

_ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ .

_

-

t

.

-

-

-

,

OCT 101986

!

Tennessee Valley Authority

,

i

yATTN:

Mr. S. A. White

Manager of Nuclear Power

6N 38A Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

i

Gentlemen:

SUBJECT:

REPORT NOS. 50-327/86-31 AND 50-328/86-31

Thank you for your response of September 17, 1986, to our Notice of Violation

issued on August 12, 1986, concerning activities conducted at your Sequoyah

!

. facility. We have determined that your responses to violations 50-327,328/86-31-02

and 50-327,328/86-31-03 meet the requirements of 10 CFR 2.201 and we will therefore-

examine the implementation of your corrective actions during future inspections.

Regarding violation 50-327, 328/86-31-01, your stated corrective actions include

,

1

the use of a swing gate to post / barricade the entrance to the high radiation area

!

inside the polar crane wall.

Additionally, you have indicated that even on those

i

occasions where this type of gate may not return to a closed position, it will

',

still fulfill its intended function.

This matter was discussed with Mr. G. Kirk

of your staff on September 26, 1986.

During this discussion, we pointed out that

if such a posted barrier were to be left open, the requirements of Technical

Specification 6.12 would not be met.

Accordingly, it is our understanding that

you will provide a supplemental response to this violation.

i

l

We appreciate your cooperation.in this matter.

Sincerely,

'

ORIGINAt SIGNED BY

l

KENNETH P. BARR

l

l

Gary G. Zech, Director

Division of TVA Projects

l

cc: #. L. Abercrombie, Site Director

l

Sequoyah Nuclear Plant

i

  1. . R. Wallace, Plant Manager

i

ur. A. Kirkebo, Director

Nuclear Engineering

!

( L. Gridley, Director

'

i

Nuclear Safety and Licensing

k R. Harding, Site Licensing

i

l

Manager

!

'

bec:

(See page 2)

8610220148 861010

PDR

ADOCK 05000327

G

PDR

l

$6

D

,

- . _ _ _ . _ . . _.

. _ . _ _ .

. _ _ _ _ _ . _ _ _ _ _ _ _ _ . - _ .

. _ _ _

_ . _ _ _ _ . . _ . _ _ _

"

"

007 1 0 586

o

i

Tennessee Valley Authority

2

'

!

!

-

bec:

J. N. Grace, RII

'

pf' R. Denton, NRR

M. L. Thompson, N:?

.J' M. Taylor, IE

.

j

  1. . B. Hayes, OI

i

W. R. Connelly, 0IA

i

K. P. Barr, RII

j

/CResidentInspector

'

NRC Document ~ Control Desk

State of Tennessee

.

I

j

s

i

1

!

!

,

'

l

4

i

i

-

!

!

!

!

I

i

!

!

i

i

i

!

l-

RII

RII,

RI

RI

'

j

'

!

RC

1:bhg

BDeb

Chose

i

{

10/0/86

10/J /86

10//g/86

10/p/86

e

- - - - - -

rv,.., m -

-,,.,,.n~,_-----,-

-.-,.---n...

- . , , , . . , , , , , . _ , , , , , - - . - - . - -

.._-----n.,..-.,,-----,-.

,n.-,.--,.....--.n..--. - - - <

-