Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000373/1988018 + (ML20207G881)
- ML20207G884 + (ML20207G884)
- ML20207G887 + (ML20207G887)
- ML20207G888 + (ML20207G888)
- ML20207G890 + (ML20207G890)
- ML20207G894 + (ML20207G894)
- AECM-86-0419, Forwards Rev 2 to Spec MP&L-M-189.1, Mississippi Power & Light Pump & Valve Inservice Insp Program, Incorporating Changes Resulting from Plant Mods & Walkdowns Performed During First Refueling Outage + (ML20207G895)
- B12153, Responds to 851017 Recommendations Re Risk Evaluation Rept (NUREG-1152).ASTM A325 High Strength Bolts Installed for Anchoring Lube Oil Cooler.Emergency Procedures Re Earthquake Damage Will Be Delayed + (ML20207G901)
- ML20207G904 + (ML20207G904)
- ML20207G907 + (ML20207G907)
- ML20207G908 + (ML20207G908)
- ML20207G912 + (ML20207G912)
- ML20207G914 + (ML20207G914)
- ML20207G915 + (ML20207G915)
- 05000338/LER-1998-006, Forwards LER 98-006-00,per 10CFR50.73.Commitment Re Completion of Root Cause Evaluation,Listed + (ML20207G919)
- ML20207G920 + (ML20207G920)
- ML20207G922 + (ML20207G922)
- ML20207G924 + (ML20207G924)
- ML20207G925 + (ML20207G925)
- ML20207G926 + (ML20207G926)
- ML20207G927 + (ML20207G927)
- ML20207G928 + (ML20207G928)
- ML20207G929 + (ML20207G929)
- ML20207G930 + (ML20207G930)
- ML20207G933 + (ML20207G933)
- ML20207G936 + (ML20207G936)
- ML20207G937 + (ML20207G937)
- ML20207G938 + (ML20207G938)
- 05000338/LER-1998-006-01, :on 980922,ESFA Occurred.Caused by Human Error. Safety Injection Signal Was Reset & Equipment Was Restored to Normal + (ML20207G940)
- ML20207G941 + (ML20207G941)
- ML20207G943 + (ML20207G943)
- 05000373/LER-1986-042-01, :on 861204,HPCS Water Leg Discharge Check Valve Failed to Close on Reverse Flow as Designed During Performance of LOS-HP-Q1.Caused by Accumulation of Magnetite on Valve Disc.Valve Internals Cleaned + (ML20207G944)
- ML20207G945 + (ML20207G945)
- ML20207G946 + (ML20207G946)
- ML20207G949 + (ML20207G949)
- PNO-III-86-069, on 860715,full Scram & ECCS Actuation Occurred During Heatup of Reactor Pressure Vessel.Approx 10 Gallons of Water Injected Into Vessel.Caused by Pressure Spike from Flow Perturbation.State of Mi Informed + (ML20207G950)
- ML20207G953 + (ML20207G953)
- FVY-86-118, Requests Approval of Use of Transnuclear TN-8L Shielded Cask,Designed in Compliance w/NUREG-0612,for Disposal of Activated Reactor Components.Fee Paid + (ML20207G954)
- ML20207G956 + (ML20207G956)
- IR 05000327/1988028 + (ML20207G959)
- ML20207G963 + (ML20207G963)
- ML20207G966 + (ML20207G966)
- 05000327/LER-1986-054, :on 861201,discovered That Discrepancy Existed Between Data Contained on Drawings for 125-volt Dc Vital Battery Sys & Data Used in Surveillance Instruction (SI)- 105.Instruction Will Be Revised + (ML20207G967)
- ML20207G968 + (ML20207G968)
- VPN-030-99, Forwards Rev 6 to PGE-1061, Trojan Nuclear Plant Decommissioning Plan. Summary of Changes,Attached.Revised Portions Denoted by Side Bars + (ML20207G969)
- ML20207G970 + (ML20207G970)
- ML20207G972 + (ML20207G972)
- ML20207G973 + (ML20207G973)
- ML20207G974 + (ML20207G974)
- ML20207G975 + (ML20207G975)
- ML20207G978 + (ML20207G978)