Text
r
Y..NO
&
f
AUG 1619%
Docket Nos.:
50-327 and 50-328
License Nos.:
DPR-77 and OPR-79
-Tennessee Valley Authority
ATEN:
Mr. S. A. White
Senior Vice President
Nuclear Pner
6N 38A Lookout Place
1101 Market Square
Chattanooga, TN 37402-2801
Gentlemen:
SUBJECT:
(NRC INSPECTION REPORT NOS. 50-327/88-28 AND 50-328/88-28)
This refers to the special Nuclear Regulatory Commission (NRC) thift coverage
inspection conducted by the NRC's Sequoyah Restart Task Force on May 5 - June 2,
1988.
The inspection included a review of the activities associated with the
startu) of Secuoyah Unit 2.
At the conclusion of the inspection, the findings
were ciscussec with those members of your staff identified in the enclosed
inspection report.
Areas examined during the inspection are identified in the report.
These areas
included extended control room observation and operational safety verification.
Within these areas, the inspection consisted of selective examinations of
procedures and representative records, interviews with personnel, and
observation of activities in progresti.
The inspection findings indicate that certain activities appeared to violate
NRC requirements.
The identified violation involved the failure to follow
procedures.
Accordingly, the violation references to pertinent requirements,
and elements to be included in your res,ponse are described in the enclosed
In addition, inspection findings have identified what
appear to be additional exam)1es of a previous violation (327,328/88-26-01)
concerning configuration con;rol.
The additional examples are addressed in.
paragraph 9 and 10.d of the enclosed inspection report.
Please provide a
response within 30 days of the date of this letter, which will address whether
the corrective actions implemented to correct violation 327,328/88-26-01
adequately encompass these additional examples.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2
Title 10, Code of Federal Regulations, a cosy of this letter, its enclosures,
and any reply will be placed <n the NRC's Pu)1ic Document Rcom.
The responses directed by this letter and its enclosures are not subjected to
the clearance procedures of the Office of Management and Budget as required by
the Paperwork Reduction Act of 1980, PL 96-511.
DOCK
327
1
0
PNV
I
g
,
.Z$oI
_ _ _ _ _ _ _ _ _ -
_ _ _ . _ _ _ _ _ _ _ _ ,
f p 'D
'
0:
AllG ! 61m
Tennessee Valley Authority
2
!
Should you have any questions concerning this letter, please contact us.
Sincerely,
0?G'% seCNto py
FRANK R. McC0Y
Frank R. McCoy, Assistant Director
for TVA Inspection Programs
TVAProjectsDivision
Office of Special Projects
Enclosures:
1.
2.
NRC Inspection Report.
cc w/encis:
J. A. Kirkebo Vice President,
J.L.LaPois,gineerin
Nuclear Ent, Actin Site Director
Sequoyah Nuclear P ant
R. L. Gridley, Director
Nuclear Safety and Licensing
M. Ray, Acting Site Licensing
Manager
TVA Representative, Rockville
Office
General Counsel, TVA
bec w/ enc 1s:
1
J. G. Partlow, OSP
S. D. Richardson, OSP
1
S. Black OSP
,
B. D. Lia,w, OSP
,
i
K. P. Barr, OSP
J. B. Brady,OGC
J. Rutberg,
.
l
NRC Resident Inspector
DRS Technical Assista t
NRC Document Control Jask
State of Tennessee
OSP/RII
OSP/RII
>
henkon
01/kYb
Ct/M/88