Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206U844 + (ML20206U844)
- ML20206U845 + (ML20206U845)
- L-84-157, Application for Amend to License NPF-30,revising Tech Specs to Increase Emergency Diesel Generator Reliability & Prevent Undue Stress & Tear on Generators,Per Generic Ltr 84-15.Fee Paid + (ML20206U846)
- ML20206U847 + (ML20206U847)
- ML20206U849 + (ML20206U849)
- ML20206U851 + (ML20206U851)
- ML20206U852 + (ML20206U852)
- ML20206U854 + (ML20206U854)
- ML20206U855 + (ML20206U855)
- ML20206U858 + (ML20206U858)
- IR 05000354/1999002 + (ML20206U859)
- 05000281/LER-1986-012-02, :on 860821,during Monthly Performance Test, Relay LM-REL-200A1 Found Failed & on 860826,relay LM-REL-200A2 Found Failed.Caused by Intermittent Operation of Comparator.Relays Replaced & Tested + (ML20206U860)
- ML20206U862 + (ML20206U862)
- ML20206U863 + (ML20206U863)
- ML20206U865 + (ML20206U865)
- ML20206U869 + (ML20206U869)
- IR 05000445/1985015 + (ML20206U870)
- ML20206U871 + (ML20206U871)
- ML20206U872 + (ML20206U872)
- ML20206U873 + (ML20206U873)
- ML20206U875 + (ML20206U875)
- ML20206U876 + (ML20206U876)
- ML20206U879 + (ML20206U879)
- ML20206U880 + (ML20206U880)
- ML20206U881 + (ML20206U881)
- ML20206U885 + (ML20206U885)
- ML20206U887 + (ML20206U887)
- ML20206U888 + (ML20206U888)
- ML20206U889 + (ML20206U889)
- TXX-4725, Responds to NRC Re Nine Deficiencies Noted in Insp Repts 50-445/85-15 & 50-446/85-12.Corrective Actions: Procedure EPP-203 & Notification Call List Revised & First Round of Drills Will Be Completed by 860627 + (ML20206U890)
- ML20206U892 + (ML20206U892)
- ML20206U894 + (ML20206U894)
- ML20206U895 + (ML20206U895)
- ML20206U896 + (ML20206U896)
- ML20206U899 + (ML20206U899)
- ML20206U900 + (ML20206U900)
- ML20206U901 + (ML20206U901)
- U-600629, Responds to NRC Questions on Method of Seismic Analysis of Piping Subsystems to Close Out Sser 6.Analysis Discussed in FSAR Section 3.7.3.1.1.4.Combination of Absolute Sum & Square Root of Sum of Squares Method Used in Analysis + (ML20206U903)
- ML20206U904 + (ML20206U904)
- ML20206U905 + (ML20206U905)
- ML20206U906 + (ML20206U906)
- ML20206U907 + (ML20206U907)
- ML20206U908 + (ML20206U908)
- ML20206U909 + (ML20206U909)
- ML20206U910 + (ML20206U910)
- ML20206U913 + (ML20206U913)
- ML20206U914 + (ML20206U914)
- ML20206U916 + (ML20206U916)
- 05000259/LER-1999-001-01, :on 990115,inoperable CR Emergency Ventilation Sys During Post Maint Testing Was Noted.Caused by Failure of Procedure Writers & Reviewers.Returned a Crev to Operable State & Revised B Crev Train Procedures.With + (ML20206U918)
- ML20206U919 + (ML20206U919)
- ML20206U922 + (ML20206U922)