Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206R524 + (ML20206R524)
- ML20206R525 + (ML20206R525)
- ML20206R527 + (ML20206R527)
- ML20206R530 + (ML20206R530)
- ML20206R532 + (ML20206R532)
- ML20206R533 + (ML20206R533)
- ML20206R535 + (ML20206R535)
- ML20206R537 + (ML20206R537)
- ML20206R540 + (ML20206R540)
- PNO-III-97-088, on 971029,patient Received Series of Co-60 Teletherapy Treatments with Total Dose of 31% Greater than Prescribed Dose.Licensee Intends to Modify Treatment Plan to Adjust Dose + (ML20206R542)
- ML20206R545 + (ML20206R545)
- PNO-III-97-089, on 971103,patient Administered 15 Mci I-131 Instead of Prescribed 30 Mci I-131.Caused by Mislabeling of Containers.Patient Administered Second 15 Mci Dose Next Day + (ML20206R546)
- ML20206R548 + (ML20206R548)
- ML20206R550 + (ML20206R550)
- PNO-III-97-090, on 971110,patient Scheduled to Receive 296 Mbq I-131 for Treatment of Hyperthyroid Condition Received 170.2 Mbq.Patient Returned & Was Administered Additional Dose + (ML20206R551)
- ML20206R553 + (ML20206R553)
- PNO-III-97-091, on 971112,Troxler 3440 Moisture Density Gauge Stolen from Licensee Truck.Local Police Dept Notified. Incident Under Investigation + (ML20206R555)
- ML20206R556 + (ML20206R556)
- ML20206R557 + (ML20206R557)
- PNO-III-97-092, on 971117,moisture/density Gauge Damaged by Earthmoving Equipment.Sealed Source Could Not Be Returned to Shielded Position Due to Bent Source Rod.Source & Gauge Returned to Mfg for Repair + (ML20206R559)
- ML20206R560 + (ML20206R560)
- ML20206R561 + (ML20206R561)
- ML20206R562 + (ML20206R562)
- PNO-III-97-093, on 971116,nominal 98 Ci Ir-192 Radiography Source Became Stuck in Collimator Due to Drive Cable Failure.Rso Responded to Job Site & Was Able to Complete Source Recovery Operations + (ML20206R563)
- PNO-V-86-056, on 860829,first Refueling Outage Began.Work to Include Copper Reduction & court-ordered Replacement of New High Density Fuel Racks W/Older Low Density Fuel Racks + (ML20206R564)
- PNO-III-97-094, on 971129,unit 1 Reactor Restarted.Unit Scheduled to Remain Online Until Routine Refueling Outage Planned for Early 1998 + (ML20206R567)
- ML20206R568 + (ML20206R568)
- PNO-III-97-095, on 971202,chemical Explosion Damaging Housing of Nuclear Gauge Containing 10 Mci Cs-137 in Sealed Source Occurred.Authorized Firm Packaged Damaged Nuclear Gauge for Transport + (ML20206R569)
- ML20206R570 + (ML20206R570)
- ML20206R572 + (ML20206R572)
- PNO-III-97-096, on 971211,unloaded Handgun & Ammunition Found in Brief Case of Il Resident Inspector.Inspector Placed on Administrative Leave & Il State Police Performing Investigation + (ML20206R573)
- ML20206R574 + (ML20206R574)
- PNO-III-97-097, on 971211,licensee Received Telephone Notification of Cs-137 Sealed Source Missing from Troxler Model 3411B Moisture/Density Gauge.Source Located in Soils Lab Under Workbench.Source Shielded & Secured + (ML20206R577)
- IR 05000344/1986025 + (ML20206R579)
- PNO-III-97-098, on 971216,patient Received 4,500 Rads Co-60 Instead of Intended 5,400 Rads.Region III Will Conduct Special Insp to Review Circumstances Surrounding Misadministration + (ML20206R582)
- ML20206R583 + (ML20206R583)
- PNO-III-97-099, on 971219,unit Shut Down Due to Incomplete App R Safe Shutdown Analysis for Various Fire Scenarios. Licensee Completed Procedure Revs & Exited Administrative Technical Requirement in Early Dec + (ML20206R584)
- ML20206R585 + (ML20206R585)
- ML20206R587 + (ML20206R587)
- PNO-IV-97-057, on 971017,radiation Safety Officer Inquired Re Reportability of Brachytherapy Incident at Facility in Oct 1997.Patient Removed Source Prior to Scheduled Completion of Treatment + (ML20206R588)
- ML20206R590 + (ML20206R590)
- 3F0487-15, Submits Annual Schedule Update for Implementation of Requirements for Emergency Response Capability,Per 830531 Commitment.Completion of Reg Guide 1.97 Scheduled for Refuel VI to Begin in Fall 1987 + (ML20206R591)
- ML20206R592 + (ML20206R592)
- ML20206R594 + (ML20206R594)
- ML20206R597 + (ML20206R597)
- ML20206R598 + (ML20206R598)
- ML20206R599 + (ML20206R599)
- ML20206R600 + (ML20206R600)
- ML20206R601 + (ML20206R601)
- 05000373/LER-1987-014-01, :on 870319,reactor Scram Occurred Due to Generator Lockout & Subsequent Turbine Trip.Caused by Moisture Intrusion Into Bus Ducts.Main Power Transformers Inspected & Tested + (ML20206R603)
- ML20206R605 + (ML20206R605)