Ltr Contract:Mod 4 to Task Order 5 Entitled, Subcooled Boiling at Low Pressure, Under Contract NRC-04-97-046
ML20206R598
Person / Time
Issue date: 01/13/1999
From: Pool S
NRC OFFICE OF ADMINISTRATION (ADM)
To: Rodriguez E
PURDUE RESEARCH FOUNDATION
References
CON-FIN-W-6749, CON-NRC-04-97-046, CON-NRC-4-97-46 NUDOCS 9901200024
Download: ML20206R598 (4)


Text

. - - -

y c9 t@ Ctig, y u UNITED STATES g

s j NUCLEAR REGULATORY COMMISSION

'g WASHINGTON, D.C. 20066-0001

%,*****/g \ ,.

~

DEC '2 3A998 Purdue Research Foundation '

ATTN: Ed Rodriguez )

1021 Hovde Hall, Purdue University West Lafayette, IN 47907-1021 l l

1

Dear Mr. Rodriguez:

SUBJECT:

TASK ORDER NO. 5 MODIFICATION NO. 4 ENTITLED "SUBCOOLED BOILING AT LOW PRESSURE" UNDER CONTRACT NO. NRC-04-97-046 in accordance with Section G.4, Task Order Procedures, of the subject contract, this letter l

definitizes Task Order No. 5 Modification No. 4. This effort shall be performed in accordance l

with the enclosed Statement of Work. '

The total estimated cost for full performance of this task order is increased from $151,960 to I

$266,960. $115,000 in incremental funding is hereby allotted to Task Order No. 5. This action changes the total cumulative funds obligated for performance of this task order from $151,960 to

$266,960. The task order is now fully funded. The Contractor shall not incur costs for this task order which exceed the cumulative obligated amount of $266,960. It is estimated that the ,

amount currently allotted will cover performance through November 30,1999. All other terms i and conditions of Task Order No. 5 remain unchanged. j Accounting data for Task Order No. 5 Modification No. 4 is as follows:

i B&R No.: 960-15-11-010-5 Job Code: W-6749 BOC Code: 252A J

RES ID: RES-C99-350 Appropriation No.: 31X0200 llj ,

l l Obligated Amount This Action: $115,000 FY 98 Obligated Amount: $151,960 FY 99 Obligated Amount: $115,000 Total Cumulative Obligations:$266,960 . 7 i

)h '

, . :u 9901200024 990113 PDR CONTR NRC-04-97-046 PDR l

l

l

( ;,

Purdue ~ '-

Contract No. NRC-04-97-046 Task Order No. 5 Mod 4 Page 2 of 2

' The issuance of this task order does not amend any terms or conditions of the subject contract.

Your contacts during the course of this task order are:

Technical Matters: Jennifer Uhle, Project Officer (301) 415-6023 Contractual Matters: Stephen Pool, Contract Specialist (301) 415-8168 Please indicate your acceptance of this task order by having an official, authorized to bind your organization, execute three copies of this document in the space provided and return two copies to the Contract Specialist. You should retain the third copy for your records.

Sincerely, ep e M. Pool, o ting fficer Contract Management BranchiNo.1 Division of Contracts and Property Management

Enclosure:

As stated ACCEPTED: TASK ORDER NO. 5 Mod 4 JAN 131999 NAME DATE Peter E. Duan

[Aspletant Vlos pnekleet ser neseersh TITLE I

i I

l

q

, Modificatior ask Order #5 Subcooled Boiling at Low Pressure" Contract # NRC-04-97-046, Job Code W6749, "Theimal-Hydraulic Research" s .

Additional Work Requirements Task 5: Rod Bundle Geometry Work specified under Task 4 entailed designing, constructing the test facility and taking data for the flat plate geometry to support preliminary model development.1 his work shall be continued under Task 5, and is considered complimentary to the work with the more complex roi bundle geometry.

Subtask 5.1: Test Plan The Test Plan written under Task 3 shall be modified by the incorporation of the tests with the rod bundle and any further runs with the flat plate and shall be submitted to NRC in both text and electronic format.

Subtask 5.2: Design The rod bundle geometry shall be designed and constructed. Work on this subtask shall not begin entil February 1,1999 (unless otherwise instructed by NRC), so that NEC has time to determine if a rod bundle larger than the proposed 2x2 desigr6 is necessary to meet NRC's ojective. This geometry and any modifications made to the facility design shall be documented as additions to the letter report of Subtask 4.2 (Experimental Design) and submitted to NRC in both text and electronic format.

Subtask 5.3: Measurements The test plan shall be followed and data taken. All data taken under Task 5 shall be incorporated into the database developed under Task 2 and 4 and delivered to NRC in a format that is compatible with the NRC Databank along with documentation, as described in Subtask 2.2. Additionally, when possible, visualization techniques shall be used to record the phenomena. Thece visual data shall be submitted to NRC as

. digitized images.

Estimated Completion Pate: November 30,1999 Estimated Level of Effort: 9 s/m Task 6: Preliminar/ Model Development To refine the separate effects test plan, preliminary model development / selection using the results of the literature survey performed under Task 1 shall be done. The model shall be consistent with the two-fluid formulation that is the basis of the NRC thermal-hydraulic codes.

The results of this activity shall be documented in a letter report in both text and electronic format and submitted to NRC. Any subsequent modifications to tr.e test plan shall also be documented as revisions to the test plan.

Estimated Completion Date: November 30,1999 Estimated Level of Effort: 3 s/m

Meetings and Travel For successful completion of the work requiEedin this contract, it is anticipated that the contractor shall travel to the NRC office in Rockville, MD at the times specified below. The contractor may propose additional travel'de'emed necessary for the successful completion of this effort. All travel shall be approved in advance by the Project Manager, be specifically performed

! . in support of this project, and be in compliance wdh Federal Transportation Regulations.

in suppo,. .)f Tasks 5 and 6, one one-day meeting for one person.